The current equipment allows your production line to assemble 1520 widgets per day with a takt time of 4.05 minutes. A vendor is proposing their new equipment which would allow you to assemble 1860 widgets per day. What would the new takt time be? Keep two decimal places in your answer.
Takt time = Net available time / Demand
Takt time = 4.05 min per widget
Demand = 1520 Widgets
Net available time = Takt time x Demand
= 4.05 x 1520
= 6156 min
After proposing new equipment,
New demand = 1860 widgets
Takt time = Net available time / Demand
= 6156 / 1860
= 3.31 Min per Widget
The current equipment allows your production line to assemble 1520 widgets per day with a takt...
Wild Widget must set up an assembly line for widgets. Forecasts show that 68 units per hour should be produced. The tasks required, task times, and precedence relationships are as follows: TTT Task A B Time (seconds) 10 21 20 Predecessors A A 28 E 12 D 10 D G 40 E,F b. What is the takt time? (Round your answer to the nearest whole number.) Takt time seconds per unit c. What is the theoretical number of workstations? (Round...
One item in the proposed new union contract allows workers in a shipping department 17 minutes for rest, 6 minutes for personal time, and 11 minutes for delays for each four hours worked. A time study analyst observed a job that is performed continuously and found an average time of 5.3 minutes per cycle for a worker she rated at 92 percent of the observed time. What standard time is applicable for that operation? (Keep two decimal places in your...
3.) today you took 16 randomly sampled widgets from your new production line (which makes thousands per day) and measured dimension x. You obtained a sample mean of 17.63 mm. You know from how long experience with your production process that the population standard deviation of x is 0.25 mm and the distribution of x is very close to norma. What is the 95% confidence interval for the population mean of x? You may either give a low & high...
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q 2.5 units.hr 1.8 units/hr Assembly a Sawing 0.8 units/hr Sanding Welding 5 units/hr Assembly 0.8 units/hr Driling 5 units.hr Assembly 0.8 units/hr a) Sanding is the bottleneck b) The bottleneck...
Lakeside Inc. is considering replacing old production equipment with state-of-the-art technology that will allow production cost savings of $10,000 per month. The new equipment will have a five-year life and cost $420,000, with an estimated salvage value of $30,000. Lakeside’s cost of capital is 8%. Lakeside Inc. uses a straight-line depreciation method. Required: Calculate the payback period and the accounting rate of return for the new production equipment. (Round your answers to 2 decimal places.)
Part (d) What percent of the chidren spend over 10 hours per day unupervised? (Round your aner to four decinal places) OPart (e) 70% of the children spend at least how long per day unsupervised? (Round your answer to two decimal places) hours Additional Materials Section 6 1 My Notes O Ask Your o -2 points lowskyintroStat1 6 Hw.072 The length of time it takes to find a parking space at 9 A.M. follows a normal distribution with a mean...
You manage the quality for the production line of your company's running shoes. A salesperson for an equipment producer is trying to sell you on a new machine designed to cut the insoles for your shoes. Your company specifies that the thickness of the insoles must be 0.250 inches and can not be more than 0.001 of an inch from that specification (either above or below). The salesperson insists that the new machine will outperform your current machine because, through...
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q 2.5 units/hr Sawing 2.1 units/he Sanding Assembly 0.8 unitsthe Welding 6 units.hr Assembly 0.8 units Drilling 5 unitshe Assembly 0.8 untui is the bottleneck 0.7 units/hr a) Drilling is the...
MCE Craig, Inc., has provided the following information for one of its products for each hour of production: Actual velocity: 100 units (per hour) Move time: 18 minutes Inspection time: 13 minutes Rework time: 15 minutes Required: 1. Calculate MCE. If required, round your answer to two decimal places. 2. What is the theoretical cycle time? Calculate MCE using actual and theoretical cycle times. If required, round your answers to two decimal places. Theoretical cycle time minutes Actual cycle time...
Amy Xia's plant is designed to produce 8,000 hammers per day but is limited to making 5,600 hammers per day because of the time needed to change equipment between styles of hammers. The utilization rate for the plant % (enter your answer as a percentage rounded to two decimal places).