Question

Question: 2. Which one of the following is not a reason why operations-based strategy leads to...

Question:

2. Which one of the following is not a reason why operations-based strategy leads to sustainable competitive advantage?

a. Operating systems are often invisible to the competitors

b. Operating systems are often linked to each other

c. Operating systems require less capital investment in general

d. Operations "know-how" can be expanded to new areas

3. Generally speaking, which type of process is appropriate to produce a large volume of standardized products?

a. Job shop

b. Project

c. Batch

d. Line flow

4. Consider a system that can produce 80 units per hour. Suppose the demand rate is 60 units per hour. What is the flow rate?

a. 80 units per hour

b. 60 units per hour

c. 20 units per hour

d. 100 units per hour

5. Which of the following is not a correct statement?

a. The utilization of a processing step is equal to the flow rate divided by the processing rate of the step

b. Utilization cannot be greater than one

c. It is possible that a system has more than one bottlenecks

d. A bottleneck step is the step with the lowest utilization

6. A process produces two types of products in batches. The batch size of product X is 50 and the batch size of Z is 100. Currently, management wants to produce these two products in a mix of X:Z = 2:1. Which of the following is not a feasible repeating cycle (or a production run)?

a. XXZXX, ...

b. XXXXZ, ...

c. XXZZ, ...

d. ZXXXX, ...

7. Consider a work station that operates at a smooth and continuous rate of 20 units per hour. Suppose that material arrives at a smooth and continuous rate of 25 units per hour to be processed by this station. Assume that the station starts at 8am with zero inventory in front of the station. What is the inventory level in front of the station at 12pm?

a. 0 units

b. 10 units

c. 20 units

d. 40 units

8. What is the average WIP (or inventory) level if a WIP build-up diagram has a triangular shape? Let the height of the triangle be H and the length of the base be T.

a. H

b. 0.5*H*T

c. 0.5*H

d. H*T 4

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answering the first four questions as per Chegg policy

Answer 2: Option A

Explanation: Operating systems being ‘invisible’ to each other is not a reason that operations strategy leads to sustainable advantage. Operations based strategy works on the systems approach require less capital and is expandable.

Answer 3: Option C

Explanation: Batch production is used to produce a large volume of standardized products.

Answer 4: Option B

Explanation: Since the capacity of the system is 80 units per hour but the demand is only 60 units per hour, the flow rate would be 60 units per hour as the production will be demand based.

Answer 5: Option D

Explanation: The bottleneck of the process is the step which takes more time than other nodes so that other nodes wait for it to complete its task and experience a slack. It has the highest utilization as it has no slack.

Add a comment
Know the answer?
Add Answer to:
Question: 2. Which one of the following is not a reason why operations-based strategy leads to...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Two-step Process Utilization: A two- used to finish a product: painting and drying. There are 5 workers and each one ta...

    Two-step Process Utilization: A two- used to finish a product: painting and drying. There are 5 workers and each one takes an average of 60 minutes to paint each unit. Drying takes place in an oven that can hold up to 100 units and it takes 5 minutes to load each unit. Once all the units are loaded into the oven, it takes 6 hours to dry each load. Assume that the process is capacity constrained (so the demand rate...

  • 2. Consider the following batch flow process consisting of three process steps performed by three machines: Step 1 Step...

    2. Consider the following batch flow process consisting of three process steps performed by three machines: Step 1 Step 3 Step 2 Processing time 1 minute/part Processing time 1.5 minute/part Processing time 2 minute/part Setup time No Setup No Setup 20 minutes Work is processed in batch at each step. Before a batch is processed at step 1, the machine has to be set up. During There are no inventory buffers between steps. a setup, the machine is unable to...

  • Continuous Flow vs. Departmental Manufacturing Gumbrecht Company has the following departmental manufacturing layout for one of...

    Continuous Flow vs. Departmental Manufacturing Gumbrecht Company has the following departmental manufacturing layout for one of its plants: 12 minutes 6 minutes Wait time - 10 minutes Move and wait time - 15 minutes Casting Grinding Move and wait time - 25 minutes 10 minutes 2 minutes Move and wait time - 20 minutes Drilling Finishing A consulting firm has recommended a value stream with the following manufacturing cell: 6 minutes 12 minutes Grinding Casting Drilling Finishing 10 minutes 2...

  • Continuous Flow vs. Departmental Manufacturing Gumbrecht Company has the following departmental manufacturing layout for one of...

    Continuous Flow vs. Departmental Manufacturing Gumbrecht Company has the following departmental manufacturing layout for one of its plants: 12 minutes 6 minutes Wait time - 10 minutes Move and wait time - 15 minutes Casting Grinding Move and wait time - 25 minutes 10 minutes 2 minutes Move and wait time - 20 minutes Drilling Finishing A consulting firm has recommended a value stream with the following manufacturing cell: 6 minutes 12 minutes Grinding Casting Drilling Finishing 10 minutes 2...

  • 56) One employee is in charge of the following activities at a refreshment stand: Activity Greet...

    56) One employee is in charge of the following activities at a refreshment stand: Activity Greet customer Take order Process order Print receipt Activity Time per Customer 5 seconds 25 seconds 1.5 minutes 30 seconds If demand rate is 20 customers per hour, what are the flow rate (in customers per hour), utilization, and cycle time (in minutes per customer)? A) 20, 0.83, 0.05 B) 24, 1, 0.04 c)20,0.83, 3 D) 24, 1,25 57) Patients are arriving at a clinic...

  • Dunder Mifflin Company has the following departmental manufacturing layout for one of its plants: Wait time...

    Dunder Mifflin Company has the following departmental manufacturing layout for one of its plants: Wait time – 10 minutes ------ Casting 12minutes Move and wait time – 15 minutes -------Grinding 6 minutes Move and wait time – 25 minutes ------- Drilling 10 minutes Move and wait time – 20 minutes -------Finishing 2 minutes A consulting firm has recommended a value stream with the following manufacturing cell: Casting 12 minutes ---- Grinding 6 minutes -----Drilling 10 minutes ----- Finishing 2 minutes...

  • HSS Ltd. manufactures decorative tins that hold various food products such as popcorn, cookies, and candies....

    HSS Ltd. manufactures decorative tins that hold various food products such as popcorn, cookies, and candies. The finished tins are sold to food packaging companies that fill the tins. In making the actual tin, minus the lid, there are three steps involved: Step 1: Lithography, Step 2: Molding/Sealing, and Step 3: Assembly. Table 1 lists the required processing times and set up times at each of the steps. The demand greatly exceeds capacity for these decorative tins. There is unlimited...

  • Adam (with the same machine) performs tasks 1 and 2. After running a setup on the...

    Adam (with the same machine) performs tasks 1 and 2. After running a setup on the machine, he performs task 1 on every unit in a batch. Then, he runs another setup on the same machine before performing task 2 on every unit in the batch. After that, either Brad or Chloe performs task 3 on the units. Finally, Dorothee does task 4. Tasks 3 and 4 are done by the workers only so they do not require any setups....

  • Anderson Company has the following departmental manufacturing structure for one of its products: 7.5 minutes 15...

    Anderson Company has the following departmental manufacturing structure for one of its products: 7.5 minutes 15 minutes Wait time = 15 min. Move and wait time = 18 min. Molding Welding Move and wait time = 22.5 min. 12 minutes 7 minutes Move and wait time = 19.5 min. Polishing Assembly After some study, the production manager of Anderson recommended the following revised cellular manufacturing approach: 15 minutes 7.5 minutes Welding Molding Polishing Assembly 12 minutes 10.5 minutes Required: 1....

  • OVERWORKED INC has 3 resources (Resource A, Resource B and Resource C) in its production process....

    OVERWORKED INC has 3 resources (Resource A, Resource B and Resource C) in its production process. The production process involves 3 products (Product A, Product B and Product C) being processed through these 3 resources. Currently, there is demand for 800 units of Product A, 1,200 units of Product B and 200 units of Product C per day. The processing times for each product at different resource levels is given in the table below: Product A Product B Product C...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT