(a) The type of system model is feedback control system with the source
(b) Design of the controller:


Boiler is a major equipment in the palm oil mill industry to provide steam for heating and power ...
A palm oil mill plant owned by Slime Karby Plantations Sdn Bhd has been operating under low efficiency and performance of its boiler and turbine. Its Chief Technical Officer has employed you to review the plant and submit a proposal on how the performance of the plant can be improved. Currently, the plant operates in a simple Rankine cycle manner. The source of raw water for boiler is pumped from the Klang River to a reserve pond. Superheated steam generated...
A steam power plant is intended to be used for heating as well as power generation. The net power required from this installation is 5 MW and the heating power is 12 MW. While the steam produced at 4 MPa, 440 degrees Celsius in the boiler expands in the isentropic turbine, the steam to be used in heating is drawn from the turbine at 140 kPa and it is condensed in the heating installation and mixed with water from the...
Thermo Final Exam open book open notes 2hrs 1. (10pts) A power plant can be described by an ideal Rankine cycle without any irreversibility's. he boiler produces superheated steam at a pressure of 200 bars and temperature of 600c (1). The steam expands adiabatically (and isentropicly) thru a turbine exiting as a saturated vapor/liquid mixture at pressure of 0.1bar (2). The mixture passes thru a condenser (P-0.1bar) until it is all saturated liquid (3). It is then pumped adiabatically to...
Question 2: A steam power cycle operates such that the steam exits boiler at 4 MPa, 400C and the condenser pressure is 10 kPa. The efficiency of the turbine and pump is 85% and 90% respectively. a. Draw the process on a Ts diagram and calculate the thermal efficiency. b. If the plant produces 100MW of net power, - what is the steam flowrates in kg/hr? - If the plant uses natural gas as a fuel, determine the flowrate of...
10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...