A bridge is to be constructed now as part of a new road. Engineers have determined that current traffic volume on the new roa

required Pessimistic estimate Most likely estimate Optimistic estimate End of year2 End of year 4 End of year 9 view of these

Can someone show me how they got these numbers, show all the work please, thank you. Correct answers are shown in picture.

A bridge is to be constructed now as part of a new road. Engineers have determined that current traffic volume on the new road wil stfly a two-lane road and a bridge at the present time. Because of the uncertainty regarding future traffic, the time at which the I two lanes will be required is currently being studied Two alternatives are being considered Alternative 1 -One-stage construction: Build a four lane bridge right now for $379,000 ge construction Start with a two-lane bridgé now for $160,000 and widen to four lanes later when traffic justifies. The future cost of widening the bridge to four-lanes at that time will be $160.000 plus an extra $28,000 for every year that widening s delayed For example, i future widening is done at the end of year 4 the cost of widening at that time will be equal to The following estimates have been made of when widening to a four-lane bridge will be $160,000 + 4x($28.000)-$272000. required Pessimistic estimate Most likely estimate End of year2 End of year 4 (a) Calculate the PW of costs for the different scenarios of Alternative 2 , PWpessimistic (6%)-S-352 2thousand [Round to one decimal place ) PWmost likely (6%) t s-375.5. thousand (Round to one decimal place ) PWoptimistic(696)-s-4039, thousand (Round to one decimal place.) (b) Calculate the expected PW costs of Alternative 2 using the three-point estimation technique Expected PW s-376.4 thousand (Round to one decimal place.) (c) Based on these estimates, which alternative is more economical? A. Alternative 2 ХВ. Alternative 1
required Pessimistic estimate Most likely estimate Optimistic estimate End of year2 End of year 4 End of year 9 view of these estimates, which alternative would you recommend? The MARR used by the highway department is 6% per year
0 0
Add a comment Improve this question Transcribed image text
Answer #1

2- 2, 23G. 23 hant れしに。2.2 S 8

Add a comment
Know the answer?
Add Answer to:
Can someone show me how they got these numbers, show all the work please, thank you. Correct answ...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Please Calculate the expected PW value for building and widening a​ two-lane bridge. Will rate highly....

    Please Calculate the expected PW value for building and widening a​ two-lane bridge. Will rate highly. A bridge is to be constructed now as part of a new road. An analysis has shown that traffic density on the new road will justify a two-lane bridge at the present time. Because of uncertainty regarding future use of the road, the time at which an extra two lanes will be required is currently being studied. The estimated probabilities of having to widen...

  • Problem 12-2 (algorithmic) Question Help part of a new road. An analysis has shown that traffic...

    Problem 12-2 (algorithmic) Question Help part of a new road. An analysis has shown that traffic density on the new road will justify a two-lane bridge at the present time. Because of uncertainty regarding future use of the structed n fhaving to widen the bridge to four lanes at various times in the future are as follows: Probability d. the time at which an extra two lanes will be required is currently being studied. The estimated probabilities Widen Bridge In...

  • The answer is shown in the picture, i want to know how they got it, please show all your work and if you are using excel please show your formulas, Thank You and good luck. Toll lanes on a section of...

    The answer is shown in the picture, i want to know how they got it, please show all your work and if you are using excel please show your formulas, Thank You and good luck. Toll lanes on a section of the 1-40 freeway are being considered in order to reduce traffic congestion and travel times Since this is a government project, the B-C ratio method must be applied in the evaluation. Construction costs of the project are estimated to...

  • can someone help me with growth valuation? Please show all work so I know how to...

    can someone help me with growth valuation? Please show all work so I know how to correctly answer other examples. I am also using a BA 2 Plus business analyst calculator, thanks! Click here to read the eBook: Valuing Nonconstant Growth Stocks NONCONSTANT GROWTH VALUATION Holt Enterprises recently paid a dividend, Do, of $3.00. It expects to have no constant growth of 15% for 2 years followed by a constant rate of 4% thereafter. The firm's required return is 12%...

  • Can someone help me with part b? I can not seem to find the correct answer for present worth of B1 with 10 year plannin...

    Can someone help me with part b? I can not seem to find the correct answer for present worth of B1 with 10 year planning horizon or the present worth of B2 with 10 year planning horizon. Consider the two mutually exclusive projects in the table below. Salvage values represent the net proceeds (after tax) from disposal of the assets if they are sold at the end of each year. Both projects B1 and B2 will be available (or can...

  • please complete all parts to the problem including the graph section. added extra photos of the...

    please complete all parts to the problem including the graph section. added extra photos of the answer choices to choose from so its easier. 4. Expected dividends as a basis for stock values The following graph shows the value of a stock's dividends over time. The stock's current dividend is $1.00 per share, and dividends are expected to grow at a constant rate of 2.70% per year. The intrinsic value of a stock should equal the sum of the present...

  • please show all the work. if you use excel please show the screenshots. Thank you !...

    please show all the work. if you use excel please show the screenshots. Thank you ! Question 3 (10pts) As part of a research program for a new cholesterol drug, a pharmaceutical company would like to investigate the relationship between the ages and LDL (low-density lipoprotein) cholesterol of men. The accompanying data set shows the ages and LDL cholesterol levels of seven randomly selected men. Construct a 95% prediction interval to estimate the LDL cholesterol level of a 29-year-old man....

  • Please show any and all work or sub-calculations. A firm's EV / EBITDA ratio has most...

    Please show any and all work or sub-calculations. A firm's EV / EBITDA ratio has most recently (2018) been 7.8 but has grown as indicated in the below table since 2014. EBITDA over that same timeframe is given in the table also. An analyst wants to estimate the target price of the stock one year in the future. The analyst estimates the company's LT Debt in one year to be $1,400,000 and cash at $75,000. If 50,000 shares of stock...

  • hi, can you please show me how to work these out and show me the correct...

    hi, can you please show me how to work these out and show me the correct answers. thanks so much and have a great day Part U67 is used in one of Broce Corporation's products. The company's Accounting Department reports the following costs of producing the 15,300 units of the part that are needed every year. Direct materials Direct labor Variable overhead Supervisor's salary Depreciation of special equipment Allocated general overhead Per Unit $ 2.20 $ 3.20 $ 6.00 $...

  • Please show all work and clear steps as to how you got each solution!! Stocks A...

    Please show all work and clear steps as to how you got each solution!! Stocks A and B have the following historical returns: Year Stock A's returns Stock B's returns 2003 -19.00% - 15.50% 2004 32.00% 23.80% 2005 14.00% 29.50% 2006 -0.50% -8.60% 2007 28.00% 25.30% (a) Calculate the average rate of return and standard deviation of returns (as percents) for each stock during the 5-year period. (Round your standard deviations to two decimal places.) stock A average rate of...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT