Question

A company is considering drilling a development well. Wellsite preparation, drilling and testing ...



A company is considering drilling a development well. Wellsite preparation, drilling and testing of the well is expected to cost $2.2 million. Completion of the well and the field equipment necessary to get the well ready for production (wellhead, tubing, flowline, etc.) would cost $1.4 million. Company geologists have suggested that there is a 20% probability that the well will be dry. If that is the case, abandonment and reclamation costs would be $150,000. In the event the well is successful (80% probability), it is anticipated that it would have an initial production rate of 80 barrels/day with production declining by 17% per year and an economic life of 13 years. A $150,000 abandonment and reclamation cost would have to be incurred at the end of the well’s economic life. Operating costs are expected to be $250,000 per year. Oil prices in the first year of production are expected to be $70/barrel and are expected to rise by 2% annually thereafter. Given a marginal opportunity cost of investment for the company of 18%, use the expected monetary value (EMV) criterion to determine whether this well should be drilled. Assume all capital costs occur in the present period (time 0) and production and operating costs begin in year 1.

Question 2

With respect to the previous question, suppose that, after drilling, testing reveals that the initial production rate would be 40 barrels/day instead. If capital costs, abandonment/reclamation costs, initial prices, operating costs and growth/decline rates all remain the same, would the company complete the well ? Note that the well’s economic life under the assumptions used here would be 9 years.

PLEASE ONLY ANSWER QUESTION 2, I DO NOT NEED QUESTION 1.
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Conclu/on。 gconomicatty viable as Company Shouk wetl b have las seneair astun ens chanrs bba minion 木number of opratlyg cbysScenario-1 Alondonent costs (r501000) THalt vauo (3,50.000)sobabn or Scenar) o 오 ErMV tIC

Add a comment
Know the answer?
Add Answer to:
A company is considering drilling a development well. Wellsite preparation, drilling and testing ...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 5 years savez 3. An oil drilling company purchased a large compressor with an initial cost...

    5 years savez 3. An oil drilling company purchased a large compressor with an initial cost of $125,000, which is being depreciated by MACRS depreciation. The company pays in the 34% tax bracket with an anticipated yearly benefit of $300,000 from this investment. Expected yearly operating and maintenance costs are estimated at 30,000 for the first year and a compounded 10% increase per year Define the expected cash flow before taxes, the yearly tax payments, and the resulting cash flow...

  • Novak Drilling Company has leased property on which oil has been discovered. Wells on this property...

    Novak Drilling Company has leased property on which oil has been discovered. Wells on this property produced 17,330 barrels of oil during the past year that sold at an average sales price of $62 per barrel. Total oil resources of this property are estimated to be 232,200 barrels. The lease provided for an outright payment of $565,000 to the lessor (owner) before drilling could be commenced and an annual rental of $35,595. A premium of 5% of the sales price...

  • nr 110 Equipment used in testing and completing a development well cost sao. has a 10-year...

    nr 110 Equipment used in testing and completing a development well cost sao. has a 10-year life with a salvage value of $5,000. The equipment is a support equipment and facilities. The equipment was used for fourm drilling Kelly #1. Ignore the wells-in-progress account and use the a final account. 1 cost $50,000 and nent is classified as ed for four months in nt and use the appropriate REQUIRED: Record depreciation.

  • Consider Two drilling Site, A and B. First, consider site B alone. The estimated drilling cost...

    Consider Two drilling Site, A and B. First, consider site B alone. The estimated drilling cost is $40 million. For simplicity, assume that if you drill at this site, there are two possible outcomes: either there is oil at the site or there is no oil. Based on the available data, your geologists assign a 20% chance that there is oil at the site (the site is "wet"). If there is oil, your geologists believe that the expected present value...

  • The management of Devine Instrument Company is considering the purchase of a new drilling machine, model...

    The management of Devine Instrument Company is considering the purchase of a new drilling machine, model RoboDril 1010K. According to the specifications and testing results, RoboDril will substantially increase productivity over AccuDril X10, the machine Devine is currently using. The AccuDril was acquired 8 years ago for $110,000 and is being depreciated using the straight-line method over a 10-year expected life and an estimated salvage value of $30,000. The engineering department expects the AccuDril to keep going for another 3...

  • Suppose an oil company is considering whether to develop production facilities for a newly discovered oil...

    Suppose an oil company is considering whether to develop production facilities for a newly discovered oil field on lands owned by a state government. If the firm spends $2 billion in present value in capital costs, it could install facilities capable of producing 80,000 barrels per day. Annual operating costs for the oil field are anticipated to be $30 per barrel produced. The company expects production from the field to start at 80,000 barrels per day but then decline at...

  • Exercise 2 (6 marks) ENOV Oil has the following data in connection with lease Oud Maitha: $200,000 600,000 650,000 75 35 596 1/8 Proved Drilling cost Estimated completion cost Estimated selling p...

    Exercise 2 (6 marks) ENOV Oil has the following data in connection with lease Oud Maitha: $200,000 600,000 650,000 75 35 596 1/8 Proved Drilling cost Estimated completion cost Estimated selling price per barrel Estimated lifting cot per barrel State severance tax rate cost Royalty interest The company is sole owner of the working interest Required ed to be 2000 barels,is the well profitable? Explain. tal production would it take to cover completion costs? 1) If reserves are determin 2)...

  • Wildhorse Drilling Company has leased property on which oil has been discovered. The oil wells on this property produced 16,300 barrels of oil during the past year that sold at an average sales price of $61 per barrel. Total oil resources of this property

    Wildhorse Drilling Company has leased property on which oil has been discovered. The oil wells on this property produced 16,300 barrels of oil during the past year that sold at an average sales price of $61 per barrel. Total oil resources of this property are estimated to be 272,000 barrels.The lease provided for an outright payment of $557,600 to the lessor (owner) before drilling could be commenced and an annual rental of $27,710. A premium of 5% of the sales price of every barrel of oil removed is...

  • Comparison of Payback, NPV, and IRR Question 4: Exxon is considering drilling for oil in the...

    Comparison of Payback, NPV, and IRR Question 4: Exxon is considering drilling for oil in the gulf coast near Texas. The proposed drilling site has the following information: (a) A rig will need to be setup which costs $1,200,000,000 in Year 0. (b) It will actually cost $100,000,000 for Exxon to shut down the rig and comply with EPA regulations at the end of its useful life in Year 20). (c) The rig will produce operating cash flows of $150,000,000...

  • 4. Exendine Oil, an exploration and development company located in Okesa, Oklahoma plans to bid for...

    4. Exendine Oil, an exploration and development company located in Okesa, Oklahoma plans to bid for a one-year option to horizontally drill and fracture the old Drummond oil field. The option gives Exendine the right to drill the well anytime during the next year. The option expires at the end of one year if the firm fails to begin drilling. The total costs of drilling and fracturing the well would be $3.10 million. The well is certain to produce 20,000...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT