Let,
xi = yards of fabric i to produce on Jaquard loom
yi = yards of fabric i to produce on Northop loom
pi = yards of fabric i to be purchased from external supplier
Objective is to minimize cost = Min 0.53x1 + 0.6x2 + 0.71x3 + 0.6y2 + 0.71y3 + 0.81p1 + 0.85p2 + 0.84p3
Subject to following constraints,
1. Demand Constraints
x1+p1 = 50000 (Demand should be exactly matched)
x2+y2+p2 = 62000 (Demand should be exactly matched)
x3+y3+p3 = 35000 (Demand should be exactly matched)
2. Capacity constraints
available hours for Jaquard = 24 hours/day * 7 days/week* 12
weeks*2 looms = 4032
capacity of Jaquard for fabric 1 = 5.6 yards/hour we can say per hour capacity = 1/5.6 per hour
1/5.6 x1 + 1/5.2 x2 + 1/4.8 x3 <= 4032
or,0.17857x1 + 0.19230X2 + 0.20833X3 <= 4032 -----(1)
available hours for Northorp = 24 hours/day * 7 days/week* 12
weeks*10 looms = 20160
1/4.8Y2 + 1/4.5Y3 <= 20160
OR, 0.20833Y2 + 0.22222Y3 <= 20160
xi,yi,pi >= 0 (non-negativity constraints)
Solving in excel solver we get,
x1 = total amount of fabric 1 to be produced on Jaquard = 22579.38
Correct answer is 22579.2 (Ans)

QUESTION 80 Use the table below to answer the following question(s). Remington Textiles has a mill that produces three types of fabrics on a make-to-order basis. The mill operates on a 24/7 basis. Th...
Remington Textiles has a mill that produces three types of fabrics on a make-to-order basis. The mill operates on a 24/7 basis. The key decision facing the plant manager is about the type of loom needed to process each fabric during the coming 12 weeks to meet demands for the three fabrics and not exceed the capacity of the looms in the mill. Two types of looms are used: Jaquard and Northrop. Jaquard looms can be used to make all...
Use the table below to answer the following question(s). Remington Textiles has a mill that produces three types of fabrics on a make-to-order basis. The mill operates on a 24/7 basis. The key decision facing the plant manager is about the type of loom needed to process each fabric during the coming 12 weeks to meet demands for the three fabrics and not exceed the capacity of the looms in the mill. Two types of looms are used: Jaquard and...