how to graph this?
is this correct?
The aim of the objective function for Par Inc., should be to Maximize the objective value
Objective function
Max Z = 5S + 8D
Subject to:
(1/2)S + 1D <= 300 (C1)
1S + (2/3)D <= 420 (C2)
a) The optimum solution is
S = 330
D =135
b) Optimal solution value 'z' = 2730
how to graph this? is this correct? The aim of the objective function for Par Inc., should be to Maximize the objective value Objective function Max Z = 5S + 8D Subject to: (1/2)S + 1D <= 300 (C1)...
% Problem B.12 Brief Par, Inc.produces a standard golf bag anda deluxe golfbag on a weekly basis. Each golfbag requires time for outing and dyeing and time for sewing and finishing, as shown in the following table Product Standard Bag Deluxe Bag Hours Required per Bag Cutting and Sewing and Dyeing 1/2 The profts per bag and weekly hours available for cutting and dyeing and for sewing and finishing are as follows: Proper Unt (5) Product Sandrag Deluxe Bag Weekly...
Below is the Sensitivity Report for Par Inc. In which departments would you not investigate whether it was possible to increase the available hours? Variable Cells Final Reduced Objective Allowable Allowable Cell Name Value Cost Coefficient Increase Decrease $B$14 Bags Produced Standard 540 0 10 3.5 3.7 $C$14 Bags Produced Deluxe 252 0 9 5.286 2.33 Constraints Final Shadow Constraint Allowable Allowable Cell Name Value Price R.H. Side Increase Decrease $B$19 Cutting and Dyeing Hours Used 630 4.375 630 52.364...
Below is the Sensitivity Report for the Par Inc. What would be the increase in the objective function if 10 additional hours were available in the Finishing Department? Enter your answer without a dollar sign and rounded to two decimal places. Microsoft Excel 16.0 Sensitivity Report Worksheet: [Par.xlsx]Model Report Created: 3/1/2018 4:16:53 PM Variable Cells Final Reduced Objective Allowable Allowable Cell Name Value Cost Coefficient Increase Decrease $B$14 Bags Produced Standard 540 0 10 3.5 3.7 $C$14 Bags Produced Deluxe...