Answer
--Correct Answer = Option #1: Number of custom designs.
--Under ABC costing, each activity is assigned an accurate cost driver.
--Here, the activity concerned is 'CUstom design process' and its accurate cost driver would be "No. of Custom designs".
i dont know what the answer is Which of the following would probably be the most accurate measure of activity to use...
i did the work but i dont know where i messed up can someone
please help?
Check my work Amberjack Company is trying to decide on an allocation base to use to assign manufacturing overhead to jobs. The company has always used direct labor hours to assign manufacturing overhead to products, but it is trying to decide whether it should use a different allocation base such as direct labor dollars or machine hours. Actual and estimated data for manufacturing overhead,...
Question 1: Choosing activity cost drivers Choose the best cost driver for each pool: Salaries of production labor supervisors: O direct labor hours O machine hours setup hours O number of setups O number of units O number of new product designs Salaries of machine technicians (they repair the machines; on average, machines break down every 500 hours): direct labor hours O machine hours setup hours number of setups number of units number of new product designs Salaries of production...
Klumper Corporation is a diversified manufacturer of industrial goods. The company's activity-based costing system contains the following six activity cost pools and activity rates: $ hour Activity Cost Pool Activity Rates Supporting direct per direct labor- labor Machine processing $ 4 per machine-hour Machine setups $ 35 per setup Production orders $170 per order Shipments $125 per shipment Product sustaining $850 per product Activity data have been supplied for the following two products: Number of units produced per year Direct...
please help me.. i dont know what to do with this “unit sales vc fc
are probably accurate with the +- 10%”.. please help me by giving
the precise amount of best worst base case.. thanks
19. Project Analysis (LO1, 2, 3, 4] You are considering a new product launch. The project will cost $1,700,000, have a four-year life, and have no salvage value: depreciation is straight-line to zero. Sales are projected at 190 units per year; price per unit...
5. Peter Company has the following pools, drivers and pool rates for its activity-based costing system: Pool Driver Rate Machining Machine Hours $60 per machine hour Ordering of Parts Number of Orders $180 per order Design Design Hours $600 per design hour Customer Customers $2,200 per customer Other n/a n/a Becca Company placed an order with Peter for 1,800 units of a custom product. The order required $90,000 worth of direct material and $36,000 worth of direct labor. The order...
Denard Inc. is considering the use of activity based costing. The following information was gathered: Activity Overhead Alloc. Base Set up 115.000 #set ups Machine maintenance $ 150,000 # mach hrs Product A Product B Direct labor hours 5,000 5,500 Number of setups 166,000 180,000 Number of machine hours 4,000 2,400 units produced 640 400 If Denard Inc. uses activity based costing, what is the indirect cost per unit (overhead per unit) for Product A?
ULI, DULISU Ndres custom-designed paragliders. Management has designed an activity-based costing system with the following activity cost pools and activity rates: Activity Cost Pool Supporting direct labor Order processing Custom design processing Customer service Activity Rate $ 22 per direct labor-hour $ 196 per order $ 265 per custom design $ 436 per customer Management would like an analysis of the profitability of a particular customer, Big Sky Outfitters, which has ordered the following products over the last 12 months:...
Requirement 1. Allocate Lakeview LawnLakeview Lawn USA's costs to the activity-cost pools and determine the activity rate for each pool. Start by allocating Lakeview LawnLakeview Lawn USA's costs to the activity-cost pools. (Enter zero in any cell if no amount should be allocated to the activity-cost pool.) Estimating Lawn Landscape jobs care design Other Total Wages and salaries Depreciation Supplies Other overhead Total Now select the formula used to determine the cost driver rates, then calculate the activity rate for...
cách). 1. Activity-based costing differs from a traditional costing system in all of the following aspects EXEPT: A) Direct materials, direct labor, and shipping costs are directly assigned to cost objects. B) Numerous overhead cost pools are used in ABC system. C) Most but not all manufacturing costs are assigned to products. D) Non-manufacturing as well as manufacturing costs may be assigned to products. 2. In activity-based costing, the activity rate for an activity cost pool is computed by dividing...
Under activity based costing, which of the following types of costs would most likely require analysis to determine an activity cost per measure? Direct material Direct labor Traceable None of the above