Formulate the following problems (taken from Rao's and RRR's texts) as system optimization problems. You do...
a) Formulate a cost function along with constraints, if any, for the following optimization problems. You don't need to solve any of these problems i) Two electric generators are interconnected to provide total power to meet the load. Suppose each generator's cost (C) is a function of its power output P (in terms of units), and costs per unit are given by: C2 = 1 + 0.6P2 + P22 (for Generator 2). -1-P -Pi2 (for Generator 1), If the total...