Question

Which of the following is not a prevention cost? a. operator training b. preventive maintenance c. testin...

Which of the following is not a prevention cost?

a.

operator training

b.

preventive maintenance

c.

testing finished products

d.

design engineering

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Option C is the answer

Testing finished goods

The costs which are incurred by management to reduce number of defective units from the beginning are known as prevention costs.
Add a comment
Know the answer?
Add Answer to:
Which of the following is not a prevention cost? a. operator training b. preventive maintenance c. testin...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • a)Classify each of the following costs of quality as either a prevention cost, appraisal cost, internal...

    a)Classify each of the following costs of quality as either a prevention cost, appraisal cost, internal failure cost or external failure cost. . Heat testing each finished product $40,000/year Yearly maintenance on production equipment $20,000/year Inspection of Raw Materials $10,000/year Warranty Claims $50,000/year Production loss due to machine breakdowns $8,000/year Training Manufacturing Employees $15,000/year Losses of products destroyed in heat test $25,000/year b) Prepare a cost of Quality Report, listing The costs by category and including the percentage of total...

  • Required A Required B Calculate the ratio of the prevention, appraisal, internal failure, and external failure...

    Required A Required B Calculate the ratio of the prevention, appraisal, internal failure, and external failure costs to sales for March and April. (Enter your answers as a percentage rounded to 1 decimal place (i.e., 32.1).) March April Prevention Appraisal Internal failure External failure % % % % % % % % The following represents the financial information for Domingo Corporation for two months. March $515,000 April $440,000 Sales revenue Costs Process inspection Scrap Quality training Warranty repairs Product testing...

  • Schedule of Activity Costs Quality Control Activities Activity Cost Process audits $50,000 Training of machine operators...

    Schedule of Activity Costs Quality Control Activities Activity Cost Process audits $50,000 Training of machine operators 28,000 Processing returned products 19,000 Scrap processing (disposal) 25,000 Rework 8,000 Preventative maintenance 30,000 Product design 46,000 Warranty work 12,000 Finished goods inspection 23,000 From the above schedule of activity costs, determine the prevention costs. a.$30,000 b.$74,000 c.$104,000 d.$76,000

  • i cant figure out 3c. percentage change in total prevention costs 2019 to 2020. i tried...

    i cant figure out 3c. percentage change in total prevention costs 2019 to 2020. i tried 210-400=-190. -190/210=0.90 and the answer is not correct. also i need to answer those two essay questions. please help me thanks Required information [The following information applies to the questions displayed below) Acme Materials Company manufactures and sells synthetic coatings that can withstand high temperatures. Its primary customers are aviation manufacturers and maintenance companies. The following table contains financial information pertaining to cost of...

  • A preventive maintenance program has been conducted to replace a polymer gear with a required functional...

    A preventive maintenance program has been conducted to replace a polymer gear with a required functional stress level of 20 MPa every two years. The polymer material was tested to have an initial stress of 36 MPa, which was dropped to 30 MPa after a year usage at a constant strain. Provide your engineering reasoning whether the maintenance program for the polymer gear with respect to reliability and cost is correct or not.

  • The following represents the financial information for Domingo Corporation for two months. March April $360,000 Sales...

    The following represents the financial information for Domingo Corporation for two months. March April $360,000 Sales revenue $540,000 Costs $ 1,550 1,820 Process inspection 1,940 1,870 13,300 Scrap Quality training Warranty repairs Product testing equipment Customer complaints 20,600 4,300 6,700 2,500 16,000 15,100 6,400 9,800 4,800 7,500 3,100 20,000 9,400 4,700 Rework Preventive maintenance Materials inspection Field testing 13,500 Required: a. Classify these items into Prevention, Appraisal, Internal failure, or External failure costs. b. Calculate the ratio of the prevention,...

  • MAINTENANCE AND RELIABILITY

    A firm had bought 15 machines with the price of RM 20000 per unit excluded the maintenance cost. Recently, these machines often suffer damage and this result in increasing the cost of repair and maintenance cost for each machine is RM10 per unit, while the repair cost is RM30 per unit. Table Q4 shows record that indicates this breakdown history on the machines.Frequency of Preventive Maintenance: 1 2 3 4 Probability of breakdown machine: 0.1 0.2 0.3 0.4 a.) The expected number...

  • MAINTENANCE AND RELIABILITY

    A firm had bought 15 machines with the price of RM 20000 per unit excluded the maintenance cost. Recently, these machines often suffer damage and this result in increasing the cost of repair and maintenance cost for each machine is RM10 per unit, while the repair cost is RM30 per unit. Table Q4 shows record that indicates this breakdown history on the machines.Frequency of Preventive Maintenance: 1 2 3 4 Probability of breakdown machine: 0.1 0.2 0.3 0.4 a.) The expected number...

  • Schedule of Activity Costs Quality Control Activities Activity Cost Process audits $48,800 Training of machine operators...

    Schedule of Activity Costs Quality Control Activities Activity Cost Process audits $48,800 Training of machine operators 27,000 Processing returned products 20,600 Scrap processing (disposal) 26,800 Rework 6,400 Preventative maintenance 28,700 Product design 44,100 Warranty work 6,900 Finished goods inspection 22,100 From the above schedule of activity costs, determine the appraisal costs. a.$118,300 b.$70,900 c.$48,800 d.$170,700

  • Schedule of Activity Costs Quality Control Activities Activity Cost Process audits $49,500 Training of machine operators...

    Schedule of Activity Costs Quality Control Activities Activity Cost Process audits $49,500 Training of machine operators 27,400 Processing returned products 18,100 Scrap processing (disposal) 25,300 Rework 7,900 Preventative maintenance 27,100 Product design 41,100 Warranty work 9,100 Finished goods inspection 23,300 From the above schedule of activity costs, determine the appraisal costs. Schedule of Activity Costs Quality Control Activities Activity Cost Process audits $49,200 Training of machine operators 28,200 Processing returned products 18,900 Scrap processing (disposal) 26,600 Rework 6,700 Preventative maintenance...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT