Problem 4-19 (Algorithmic) The Silver Star Bicycle Company will be manufacturing both mens and womens models of its Easy-PeInventory Schedule VMens X Womens 80 0 Month 1 V Mens Womens 35 35 Month 2 Labor Levels V hours 1000 Previous month X hou

Problem 4-19 (Algorithmic) The Silver Star Bicycle Company will be manufacturing both men's and women's models of its Easy-Pedal 10-speed bicycles during the next two months. Management wants to develop a production schedule indicating how many bicycles of each model should be produced in each month. Current demand forecasts call for 160 men's and 135 women's models to be shipped during the first month and 210 men's and 160 women's models to be shipped during the second month. Additional data are shown: Production Labor Requirements (hours) Current Manufacturing Model Assembly Inventory Costs Men's $130 1.5 2.0 30 Women's $100 1.3 1.3 40 Last month the company used a total of 10000 hours of labor. The company's labor relations policy will not allow the combined total hours of labor (manufacturing plus assembly) to increase or decrease by more than 100 hours from month to month. In addition, the company charges monthly inventory at the rate of 2% of the production cost based on the inventory levels at the end of the month. The company would like to have at least 35 units of each model in inventory at the end of the two months. a. Establish a production schedule that minimizes production and inventory costs and satisfies the labor-smoothing, demand, and inventory requirements. What inventories will be maintained, and what are the monthly labor requirements? If required, round your answers to the nearest whole number. Production schedule: of to produce men's model month n's in mon TI 2 X 210 165 95 195 X of the women's model in month 2 units of the women's model in month 1, and Total Cost $ 78120
Inventory Schedule VMen's X Women's 80 0 Month 1 V Men's Women's 35 35 Month 2 Labor Levels V hours 1000 Previous month X hours 983 Month 1 Vhours 1083 Month 2 b. If the company changed the constraints so that monthly labor increases and decreases could not exceed 50 hours, what would happen to the production schedule? If required, round your answers to the nearest whole number. Production schedule: x of the men's model in month 2, The optimal solution is to produce of the men's model in month 1, 218 158 95 units of the women's model in month 1, and of the women's model in month 2 195 Total Cost $ 78139 How much will the cost increase? 19
0 0
Add a comment Improve this question Transcribed image text
Answer #1

1.

Decision variables

Let

x11 =Number of men's model in month 1

x21 = Number of women's model in month 1

x12 = Number of men's model in month 2

x22 = Number of women's model in month 2

s11 = men's model inventory units at end of month 1

s21 = women's model inventory units at end of month 1

s12 = men's model inventory units at end of month 2

s22 = women's model inventory units at end of month

Objective

Minimize cost

Z=( 130x11 + 100x21 + 130x12 + 100x22) +

  

Constraints

Satisfy Demand in month 1

30+ x11 - s11 = 160

or

x11 - s11 = 130             ...1

40 + x21 - s21 = 135

or

x21 - s21 = 95   ...2

Satisfy Demand in month 2

s11 + x12 - s12 = 210               ...3

s21 + x22 - s22 = 160                ...4

Ending inventory at the end of month 2 constraints

s12 ≥ 35 ...5

s22 ≥ 35 ...6

Labor Hours constraints (month 1)

In the previous month 100 hrs are used .so in month 1, this can be either

  • 1000-100=900 or
  • 1000+100=1100

3.5 x11 + 2.6 x21 ≥ 900 ...7

3.5 x11 + 2.6 x21 ≤ 1100 ...8

Labour Hours constraints (month 2)

In the previous month (month 1), labour hrs used = 3.5 x11 + 2.6 x21

So in month 2,

The decrease can be up to 100

3.5 x11 + 2.6 x21 - 3.5 x12 - 2.6 x22 ≤ 100 ...9

The increase   can be up to 100

3.5 x12 + 2.6 x22 -3.5 x11 - 2.6 x21 ≤100

Or

-3.5 x11 - 2.6 x21 + 3.5 x12 + 2.6 x22 ≤ 100 ...10

Non-negativity constraint

x11, x12, x21, x22, s11, s12, s21, s22 > 0 ...11

solution

Production Schedule

Men's Model

Women's Model

Month 1

210.0

95.0

Month 2

165.0

195.0

Invnetory Schedule

Men's Model

Women's Model

Month 1

80.0

0.0

Month 2

35.0

35.0

labor hrs

Month 1

983.0

Month 2

1083

Security Warning Automatic update links has been disabled Options.. G9 H C E F G K 1 2 3 month 2 4 month 1 5 x11 x21 x22 x12

, Clean min z Connections Properties Reapply From From From From Other Refresh Model Solve Existing Connections Filter Text t

Paste U a Merge & Center Format Painter Alignment Clipboard Font Options... Security Warning Automatic update of links has be

as

2

2.

For the new policy

The RHS of constraints 7,8,9,10 Is changed to 950, 1050, 50, and 50 respectively.

Production Schedule

Men's Model

Women's Model

Month 1

218

95

Month 2

158

195.0

Cost increase =78138.5 – 78119.9=$18.6

AV GEdit Links Advar Access Web Text Sources Connections All Get External Data Connections Sort & Filter Security Warning Aut

ad

Add a comment
Know the answer?
Add Answer to:
Please help and show work for all steps! Everything marked with a red X is incorrect....
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • please answer all of B and my answers for part A are correct. The Silver Star...

    please answer all of B and my answers for part A are correct. The Silver Star Bicycle Company will be manufacturing both men's and women's models of its Easy-Pedal 10-speed bicycles during the next two months. Management wants to develop a production schedule indicating how many bicycles of each model should be produced in each month. Current demand forecasts call for 150 men's and 125 women's models to be shipped during the first month and 210 men's and 160 women's...

  • Problem 4-19 (Algorithmic) The Silver Star Bicycle Company will be manufacturing both men’s and women’s models...

    Problem 4-19 (Algorithmic) The Silver Star Bicycle Company will be manufacturing both men’s and women’s models of its Easy-Pedal 10-speed bicycles during the next two months. Management wants to develop a production schedule indicating how many bicycles of each model should be produced in each month. Current demand forecasts call for 150 men’s and 125 women’s models to be shipped during the first month and 220 men’s and 170 women’s models to be shipped during the second month. Additional data...

  • Problem 4-19 (Algorithmic) The Silver Star Bicycle Company will be manufacturing both men’s and women’s models...

    Problem 4-19 (Algorithmic) The Silver Star Bicycle Company will be manufacturing both men’s and women’s models of its Easy-Pedal 10-speed bicycles during the next two months. Management wants to develop a production schedule indicating how many bicycles of each model should be produced in each month. Current demand forecasts call for 150 men’s and 125 women’s models to be shipped during the first month and 200 men’s and 150 women’s models to be shipped during the second month. Additional data...

  • The Silver Star Bicycle Company will be manufacturing both men’s and women’s models of its Easy-Pedal...

    The Silver Star Bicycle Company will be manufacturing both men’s and women’s models of its Easy-Pedal 10-speed bicycles during the next two months. Management wants to develop a production schedule indicating how many bicycles of each model should be produced in each month. Current demand forecasts call for 170 men’s and 145 women’s models to be shipped during the first month and 210 men’s and 160 women’s models to be shipped during the second month. Additional data are shown: Production...

  • The Silver Star Bicycle Company will manufacture both men's and women's models for its Easy-Pedal bicycles...

    The Silver Star Bicycle Company will manufacture both men's and women's models for its Easy-Pedal bicycles during the next two months. Management wants to develop a production schedule indicating how many bicycles of each model should be produced in each month. Current demand forecasts call for 150 men's and 125 women's models to be shipped during the first month and 200 men's and 150 women's models to be shipped during the second month. Additional data are shown: Labor Requirements (hours)...

  • The Silver Star Bicycle Company will manufacture both men's and women's models for its Easy-Pedal bicycles...

    The Silver Star Bicycle Company will manufacture both men's and women's models for its Easy-Pedal bicycles during the next two months. Management wants to develop a production schedule indicating how many bicycles of each model should be produced in each month. Current demand forecasts call for 150 men's and 125 women's models to be shipped during the first month and 200 men's and 150 women's models to be shipped during the second month. Additional data are shown: Labor Requirements (hours)...

  • Aside from selling yarn skeins, the Yarn Barn also plans to sell men’s and women’s hand-knit...

    Aside from selling yarn skeins, the Yarn Barn also plans to sell men’s and women’s hand-knit scarves during the next 2 months. The company wants to develop a production schedule indicating how many scarves of each type should be produced each month. Current demand forecasts show that 150 men’s and 125 women’s scarves are needed during the first month and 200 men’s and 150 women’s scarves are needed for the second month. Additional data are shown in Figure 2: Labour...

  • Help please! work i Check my work mode : This shows what is correct or incorrect...

    Help please! work i Check my work mode : This shows what is correct or incorrect for the work y Requirea 1 Requirea 2 ********************************* Prepare a schedule of cost of goods manufactured for the month. ...............................***. Primare Corporation Schedule of Cost of Goods Manufactured $ 12,000 30,000 42,000 18,000 24,000 5,000 ololololo Direct materials: Beginning raw materials inventory Add: Purchases of raw materials Total raw materials available Less: Ending raw materials inventory Raw materials used in production Less: Indirect...

  • Please answer the question below. Plz show all ur work and steps. Thank you Class Quest,...

    Please answer the question below. Plz show all ur work and steps. Thank you Class Quest, Inc. uses a standard cost system for its product, Fruta. For the month of June, the company expects to produce 40,000 units of Fruta using 20,000 pounds of material, and 4,000 direct labor hours. The standard price of materials is $10.00 per pound while the labor standard rate is $15.00 per hour. Variable overhead is assigned to the product on the basis of direct...

  • PLEASE SHOW ALL STEPS AND HOW TO SOLVE.. Superior Company provided the following data for the...

    PLEASE SHOW ALL STEPS AND HOW TO SOLVE.. Superior Company provided the following data for the year ended December 31 (all raw materials are used in production as direct materials): $ 216,000 $ 270,000 Selling expenses Purchases of raw materials Direct labor Administrative expenses Manufacturing overhead applied to work in process Actual manufacturing overhead cost $ 157,000 $ 370,000 $ 359,000 Inventory balances at the beginning and end of the year were as follows: Raw materials Work in process Finished...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT