Q7: True, Machine Hour is allocation base for predetermined overhead rate calculations
Q8: estimates, predetermined overhead rate is uses estimated data to to drive hourly rate
D | Question 7 2 pts machine hours is an allocation base for pre determined rate...
Question 9 3 pts overhead applied to a job is which of the following pre determined rate x actual hours predetermined rate x estimated hours none of the above O D Question 10 2 pts applying overhead to a job using pre determined rates is prevalent in a normal costing system O True O False
The predetermined overhead rate is determined as: Estimated overhead costs divided by estimated allocation base (eg direct labor hours) Actual overhead cost divided by estimated allocation base (eg direct labor hours) Estimated overhead Costs divided by actual allocation base (eg actual direct labor hours) actual overhead costs divided by actual allocation base (eg actual direct labor hours) Do not cost their services using job costing techniques True O False The beginning in Finished Goods Inventory is $50,000, the ending balance...
2. The formula for pre-determined overhead rate is: a. Estimated allocation base divided by estimated overhead b. Estimated allocation base minus estimated overhead c. Estimated overhead minus estimated allocate base d. None of the above 3. If Product T requires highly skilled employees to make it and Product Pis labor intensive and if machine hours is 20% of the non-overhead cost, then a. The allocation base for Product P should be direct labor cost and the allocation base for Product...
Given the following data, answer the questions below the table: ------------------------------------------------------------------------------------------------------------------------ Data Allocation base Machine-hours Estimated manufacturing overhead cost $220,800 Estimated total amount of the allocation base 46,000 machine-hours Actual manufacturing overhead cost $240,100 Actual total amount of the allocation base 42,000 machine-hours ------------------------------------------------------------------------------------------------------------------------ a) What is the pre-determined overhead rate? b) By how much is the manufacturing overhead underapplied or overapplied? c) Change the estimated total amount of allocation base to 48,000 machine hours, now by how much is...
D Question 3 3 pts The breakeven point in sales is the fixed cost divided by the contribution margin per unit. True O False D Question 4 3 pts The margin of safety equal actual sales-breakeven sales O True O False 3 pts D Question 5 D Question 5 3 pts machine hours can be used as an allocation base for calculating the pre determined rate True ○ False 3 pts D Question 6 rates are assigned to An unfavorable...
D Question 9 3 pts overhead applied to a job is which of the following O pre determined rate x actual hours O predetermined rate x estimated hours none of the above 2 pts D Question 10 applying overhead to a job using pre determined rates is prevalent in a normal costing system True O False
Data Allocation base Machine-hours Estimated manufacturing overhead cost $300,000 Estimated total amount of the allocation base 75,000 machine-hours Actual manufacturing overhead cost $290,000 Actual total amount of the allocation base 68,000 machine-hours Computation of the predetermined overhead rate Estimated manufacturing overhead cost ? Estimated total amount of the allocation base ? machine-hours Predetermined overhead rate ? per machine-hour Computation of underapplied or overapplied manufacturing overhead Actual manufacturing overhead cost ? Manufacturing overhead cost applied to Work in Process during the...
4. Change the estimated total amount of the allocation base back to 39,000 machine-hours, so that the data area of you worksheet looks exactly the same as in Requirement 2. Now change the actual manufacturing overhead cost from $184,800 to $193,500. The data area of your worksheet should now look like this: 1 Chapter 3: Applying Excel 4 5 6 7 8 Data Allocation base Estimated manufacturing overhead cost Estimated total amount of the allocation base Actual manufacturing overhead cost...
Salmon Company uses a pre-determined overhead rate based on machine hours to apply overhead costs to jobs. At the beginning of 2019, the company estimated the following costs would be incurred: direct materials ....... .... direct labor .......... advertising expense ..... utilities ..................... rent on factory building .......... maintenance on factory equipment ... depreciation on factory equipment .. indirect materials ................. sales commissions .................. production supervisor's salary ..... $ 70,000 90,000 20,000 16,000 35,000 29,000 12,000 25,000 39,000 41,000 70%...
D Question 12 4 pts Hayne Corporation bases its predetermined overhead rate on the estimated machine-hours for the upcoming Data for the most recently completed year appear below: Estimates made at the beginning of the year: Estimated machine hours 19,000 Estimated variable manufacturing overhead $7.89 per machine-hour Estimated total fixed manufacturing overhead $465.880 Actual machine-hours for the year 20.200 The predetermined overhead rate is... O $7.89 O $30.95 $24.52 O $3241