ANSWER:
Given that,
a)
First we need to find the R chart and see whether the process is in control with respect to the R chart.
Lower Control Limit for R chart
Upper Control Limit for R chart
where
and
is the range of the
subgroup.
Here,
Lower Control Limit for
chart
Upper Control Limit for chart
where is the
sample mean of
subgroup
The data is given as:

The chart is
given as:

The R chart is given as:

(Table 5.1 required to complete the problem)
The process is out of control because for both the chart and R
chart some of the points fall out of the control limits.
Now, remove the subgroups which do not comply to the Western
Electric Rules with respect to the R chart. Again compute the value
for and hence
the upper and lower limit with less number of subgroups. Check if
the process is in control according to the R chart then move
forward to find the xbar chart, if it is not then remove subgroups
again. Repeat procedure till R chart is in control.
When R chart is in control, plot the chart by
finding the values of
and
then
forming the control limits for the modified dataset. If the
chart is in
control complying to the Western Electric Rules, then it can be
said that the process is in control for the modified dataset, else
remove subgroups not complying to the rules.
b)
When both R-chart and chart is in
control, move forward for the following calculations:
Estimate of mean =
Estimate of standard deviation =
where d2 (n =6) =2.534
c)
Take the entire values of the revised process and plot a histogram along with a normal curve. If the normal curve fits the histogram well, then it can be said that the revised process is normally distribution.
d)
Upper Specification Limit (USL) = 9+1.5 = 10.5
Lower Specification Limit LSL) = 9 - 1.5 = 7.5
Process Capability =
Take the estimate of process standard deviation of as the value
of .
The data represents the copper concentration in a plating process. Copper concentration in a plating pool...
Cork price: 16 10 15 10 17 11 14 13 11 14 11 16 18 16 10 17 14 14 16 7 10 12 19 15 16 14 9 12 21 13 10 16 12 16 13 17 17 13 14 18 11 12 15 16 13 18 16 17 12 12 14 9 11 14 19 13 11 17 11 13 15 14 18 18 18 12 10 11 13 14 11 14 18 13 13 19 17 14...
Problem 3 20 points A bank has compiled the data in the following table showing the count of nonconformities for 80.000 accounting transactions per day during December and January. Determine the trial c line and control limits and the revised central line and control limits, assuming that out-of. control points have assignable causes. (use c chart) Subgroup 13 Subgroup 14 Subgroup 15 Subgroup 16 Subgroup 17 Subgroup 18 19 Subgroup Subgroup 2 Subgroup 3 19 20 Sub 18 2. Subgroup...
Cork price: 16 10 15 10 17 11 14 13 11 14 11 16 18 16 10 17 14 14 16 7 10 12 19 15 16 14 9 12 21 13 10 16 12 16 13 17 17 13 14 18 11 12 15 16 13 18 16 17 12 12 14 9 11 14 19 13 11 17 11 13 15 14 18 18 18 12 10 11 13 14 11 14 18 13 13 19 17 14...
1 question is this choose mcq quickly
10 p The following data represent the total number of years of formal education for 40 employees of a bank. 13 17 13 14 12 17 19 13 15 13 16 18 13 11 19 19 14 15 13 15 17 18 17 14 13 17 12 17 17 16 16 17 15 13 13 14 12 14 1313 Construct a frequency distribution for the number of years of education. Number of years...
Use the Venn diagram to list the elements of the set in roster form. 11 14 13 17 12 15 16 18 19 A' {11, 13, 14, 17} {11, 14, 18, 19} O {12, 15, 16} {12, 15, 16, 18, 19}
For the data listed(assume sample). a.) Find the following: Mean Mode Median Midrange Range Quartiles Variance Standard Deviation BoxPlot b.) Create a frequency distribution When creating classes use the formula from the Notes on how classes to create. 17 23 14 16 12 26 20 22 14 15 22 18 18 21 21 19 15 21 18 17 15 25 14 30 16 10 20 12 16 17.44 16 14 15 20 20 16 17 16 15 15 19 48...
vv==v=v=a. report the descriptive statistics for each sample b. report and analyze the ANOVA test for the three cities Florida New York North Carolina 13 14 10 12 9 12 17 15 15 17 12 18 20 16 12 21 24 14 16 18 17 14 14 8 13 15 14 17 17 16 12 20 18 9 11 17 12 23 19 15 19 15 16 17 13 15 14 14 13 9 11 10 14 12 11 13...
Use the Venn diagram to list the elements of the set in roster form. U B 11 14 13 17 12 15 16 18 19 A {12, 15, 16, 18, 19) {11, 14, 18, 19) {12, 15, 16) (11, 13, 14, 17)
Are all disciplines in the University equally boring or there are some more boring than others? To answer that question, a study performed at Columbia University counted the number of times per 5-minute interval when professors from three different departments said “uh” or “ah” during lectures to fill gaps between words. These counts were used as a proxy (approximation) for the measure of class boredom. The data from observing one hundred of 5-minute intervals from each of three departments’ professors were recorded in...
data: (copy and paste in excel to view columns in alignment)
Sample Repair Time (days)
1 12
2 17
3 9
4 16
5 10
6 18
7 12
8 14
9 15
10 14
11 14
12 8
13 11
14 10
15 8
16 8
17 14
18 12
19 14
20 13
21 12
22 15
23 15
24 10
25 24
26 17
27 13
28 15
29 13
30 15
31 36
32 40
33 ...