| Predetermined overhead rate | |||||||
| Fixed MOH | (155,000/50,000)= | 3.1 | |||||
| VMOH | 3.4 | ||||||
| Predetermined overhead rate | 6.5 | per machine hour | |||||
| Direct Materials cost | 645 | ||||||
| Direct labor cost | 2,300 | ||||||
| OH applied (6.5*100) | 650 | ||||||
| Total job cost | 3595 | answer | |||||
| Answer) | |||||||
| option a | 3,595 | ||||||
The unit product cost for Job M843 is closest to: (Round your intermediate calculations to 2...
5. What was the total manufacturing cost
assigned to Job Q? (Do not round intermediate
calculations.)
6. If Job Q included 30 units, what was its
unit product cost? (Do not round intermediate calculations.
Round your final answer to nearest whole dollar.)
7. Assume that Sweeten Company used cost-plus
pricing (and a markup percentage of 80% of total manufacturing
cost) to establish selling prices for all of its jobs. What selling
price would the company have established for Jobs P...
5. What was the total manufacturing cost
assigned to Job Q? (Do not round intermediate
calculations.)
6. If Job Q included 30 units, what was its unit product cost?
(Do not round intermediate
calculations. Round your final answer to nearest
whole dollar.)
7. Assume that Sweeten Company used cost-plus pricing (and a
markup percentage of 80% of total manufacturing cost) to establish
selling prices for all of its jobs. What selling price would the
company have established for Jobs P...
Job 910 was recently completed. The following data have been recorded on its job cost sheet: Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on the following data: Total direct labor-hours 85,000 Total fixed manufacturing overhead cost $ 306,000 Variable manufacturing overhead per direct labor-hour $ 6.00 Recently, Job P951 was completed with the following characteristics: Number of units...
6. What was the total manufacturing cost assigned to Job Q?
(Do not round intermediate calculations.)
a. What was the company’s plant wide predetermined overhead
rate? (Round your answer to 2 decimal places.)
b. How much manufacturing overhead was applied to Job P and how
much was applied to Job Q? (Do not round intermediate
calculations.)
12. If Job P included 20 units, what was its unit product cost?
(Do not round intermediate calculations. Round your final
answer to nearest...
Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data: Total machine-hours Total fixed manufacturing overhead cost Variable manufacturing overhead per machine- hour 32,300 $581,400 $ Recently, Job T687 was completed with the following characteristics: 10 Number of units in the job Total machine-hours Direct materials Direct labor cost 40 $ 630 $1,260 The total job cost for...
3. What was the total manufacturing cost assigned to Job P?
(Do not round intermediate calculations.)
4. If Job P included 20 units, what was its unit product cost?
(Do not round intermediate calculations. Round your final
answer to nearest whole dollar.)
5. What was the total manufacturing cost assigned to Job Q?
(Do not round intermediate calculations.)
6. If Job Q included 30 units, what was its unit product cost?
(Do not round intermediate calculations. Round your final
answer...
TB MC Qu. 2-133 (Algo) Lupo Corporation uses a job-order... Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data: Total machine-hours Total fixed manufacturing overhead cost Variable manufacturing overhead per machine-hour Recently, Job T687 was completed with the following characteristics: 30,400 $425,600 $ 5 10 Number of units in the job Total machine-hours Direct materials Direct labor...
5. What was the total manufacturing cost assigned to Job Q? (Do
not round intermediate calculations.)
6. If Job Q included 30 units, what was its unit product
cost?
7. Assume that Sweeten Company used cost-plus pricing (and a
markup percentage of 80% of total manufacturing cost) to establish
selling prices for all of its jobs. What selling price would the
company have established for Jobs P and Q? What are the selling
prices for both jobs when stated on...
TB MC Qu. 2-135 Lupo Corporation uses a job-order costing ... Lupo Corporation uses a job order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based Its predetermined overhead rate for the current year on the following data: Total machine-hours Total fixed manufacturing overhead cost Variable manufacturing overhead per machine- hour 32,600 $195,600 $ 4.00 Recently, Job T687 was completed with the following characteristics: Number of units in the 10 Job Total machine-hours Direct...
Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data: Total machine-hours Total fixed manufacturing overhead cost Variable manufacturing overhead per machine- hour 31,000 $310,000 $ 4.00 Recently, Job T587 was completed with the following characteristics: 10 Number of units in the job Total machine-hours Direct materials Direct labor cost 30 $ 730 $1,460 The total job cost...