![GIVEN DATA SPECIFIC GRAVITY OF OIL = 0.80 DENSITY OF OIL [8] = 0-80x100 kg/m3 F = 500kg/m VISCOSITY OF OIL [u] =50=5 a 500 se](http://img.homeworklib.com/questions/accac180-c5bd-11ea-881e-6d048522b373.png?x-oss-process=image/resize,w_560)

Please show work step by step. Thanks 0.80-specific gravity oil flows through a 24/64-inch choke. The...
subject is Heat Transport
Plz show all steps and write neatly
(b) The oil flows through the annuli, which are connected in two parallel banks ot lour halrpins each. (4.10) 50,000 lb/h of a fluid having a density of 53 Ibm/ft' and a viscosity of 1.5 cp will flow in the annulus of a double-pipe heat exchanger. The hairpins are 30 ft long with 3-in. schedule 40 outer pipe, 1.5-in. schedule 40 inner pipe, internal return bends and 1.5-in. schedule...