1. D. tracking signal times MAD = 0

when we consider a MAD value of 0, We consider the positive and negative aspects of prediction which means that while the value of MAD would be 0, some months would have a positive deviation while some would have a negative deviation. But, when we use tracking signal, first of all a positive tracking signal would mean that there is more demand, a negative tracking signal would mean that the forecasted values are bigger, therefore a tracking signal of 0, would represent the best forecast when we consider tracking signal times MADm since it would make use of values at every stage , not just the final value.

Add a comment
Know the answer?
Add Answer to:
Which of these forecasts is the BEST? The one with a MAD of zero. The one...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Consider the following data. We want to monitor the forecasts. Period..............Demand...........

    Consider the following data. We want to monitor the forecasts. Period..............Demand............Forecasts ......1...................274....................-- ......2...................261....................274 ......3...................294....................261 ......4...................294....................294 ......5...................307....................294 Calculate the UCL and LCL for the appropriate control chart? Calculate the cumulative error, MAD, and tracking signals. -Error of period 2 -Error of period 3 -Error of period 4 -Error of period 5 -Overal MSE: -UCL to monitor the magnitude of the errors -LCL to monitor the magnitude of the errors - Are the errors in control? Yes or No -Cumulative error up...

  • Question 12 (1 point) A tracking signal was calculated for a particular set of demand forecasts....

    Question 12 (1 point) A tracking signal was calculated for a particular set of demand forecasts. This tracking signal was positive. This would indicate that b demand is greater than the forecast. demand is less than the forecast. demand is equal to the forecast. the MAD is negative. d

  • NO HANDWRITTEN ANSWERS PLEASE! INCLUDE FORMULAS FOR BOTH MAD AND MSE PLEASE! The forecasts generated by...

    NO HANDWRITTEN ANSWERS PLEASE! INCLUDE FORMULAS FOR BOTH MAD AND MSE PLEASE! The forecasts generated by three forecasting methods and actual demand for the Torrance Company are as follows: Month        Demand        Forecast 1        Forecast 2      Forecast 3 1                 269                 275                   268                  280 2                 289                 266                   287                  295 3                 294                 290                   292                  290 4                 278                 284                   298                  280 5                 268                 270                   274                  270 6...

  • Calculate MAD and fill out table for the forecast: A forecasting method resulted in the following forecasts shown by the data in the following table a) Use the data to calculate the MAD for this fore...

    Calculate MAD and fill out table for the forecast: A forecasting method resulted in the following forecasts shown by the data in the following table a) Use the data to calculate the MAD for this forecast. Use the regression equation (given below) to forecast demand for period 11. And calculate the MAD for this regression method Is the regression method preferred over the method used? Why or why not? b) c) PeriodDemand Forecast A-F 54 48 68 36 68 45...

  • please i need asap answer 1. Given the data below, compute for the following: a) Forecasts...

    please i need asap answer 1. Given the data below, compute for the following: a) Forecasts for P5 to P12 using a 4-period simple moving average b) Forecasts for P5 to P12 using a 4-month weighted moving average with the following weights: Most recent period = 0.40 2nd most recent period = 0.30 3rd most recent period = 0.20 4th most recent period = 0.10 Assuming a forecast of 5,000 units for Period 4 and a = 0.30, compute for...

  • 1. Calculate mean absolute deviation (MAD), mean absolute percent error (MAPE), and tracking signal (TS) based...

    1. Calculate mean absolute deviation (MAD), mean absolute percent error (MAPE), and tracking signal (TS) based on below information. MAD Period Error Absolute Error 1 lor 2 3 4 5 Demand 155 145 160 151 143 Forecast 130 155 145 160 151 MAD= MAPE Period 1 2 3 4 5 Demand 155 145 160 151 143 Forecast 130 155 145 160 151 Ave Demand MAPE=

  • Which one is the best model for sales data and why? Method MAPE MAD MSE Naïve...

    Which one is the best model for sales data and why? Method MAPE MAD MSE Naïve 12,5 1174,1 3910351 Naïve-Seasonal 4,5 359,9 219893 Moving Average k = 12 11 1011 2588085 Single Exponential Level = 0.1 11 1049 2770820 Holt’s Level = 0.1 Trend = 0.1 12 1123 2862244 Additive Winter’s Level = 0.3 Trend = 0.1 Seasonal = 0.5 2,7 223,2 93724,5 Multiplicative Winter’s Level = 0.4 Trend = 0.1 Seasonal = 0.5 2,2       186,7 72648,6 Additive( trend...

  • 5. Which one of the following concepts is not involved when implementing total quality control? Workers being given responsibility Enforce compliance Fail-safe methods Automatic inspection Level sche...

    5. Which one of the following concepts is not involved when implementing total quality control? Workers being given responsibility Enforce compliance Fail-safe methods Automatic inspection Level schedule the factory 14. Which one of the following are suggestions for developing a focus forecasting system? Use a seasonality index. Keep rules simple. Keep the people using the forecasts separate from those who make the forecasts. The faster the growth, the higher the tracking signal. Set control limits that will keep the forecasters...

  • Which of the following conclusions can be drawn based on the following data? Month Actual Forecast...

    Which of the following conclusions can be drawn based on the following data? Month Actual Forecast Sales January 68 40 February 48 50 March 50 60 April 30 30 Tracking signal is 1.6 so the forecast method does not need to be reviewed Tracking signal is 1.6 so the forecast method needs to be reviewed Tracking signal is 10 so the forecast method does not need to be reviewed Tracking signal is 10 so the forecast method needs to be...

  • Exercise # 1-0M6322-week 4-Forecasting using Exponential Smoothing The first five periods of demand data are shown...

    Exercise # 1-0M6322-week 4-Forecasting using Exponential Smoothing The first five periods of demand data are shown in the following table Let the smoothing coefficient, alpha, equal 0.2.Compute the exponentially smoothed forecasts for periods one through four Initialize the procedure with a forecast value for period one of 37 Period Aggregate Demand Forecast demand 38 42 40 36 42 37 Determine the Running Sum of Forecast Errors (RSFE), the Mean Absolute Deviation, MADt Land the Tracking Signal(TS) at the end of...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT