Please look through the attached image and rate if of
help.
B=3
, L= 4
please close this question i don’t know how it is submitted two
times ,Thank you
4. A plan of a foundation B*L is shown in Figure below. Estimate the total settlement of the foundation five years after the completion of the primary consolidation settlement. (Note: Time for completion of primary consolidation settlement is 1.3 years) 90-| 50 KN/m2 (net stress increase) 8000 kN/m. BX Sand y.e 16.5 kN/m] 5 m Groundwater table .5m 17.5 kN/m Normally...
Q1 (10 marks) You have been asked to examine the bearing capacity of several different rectangular pad footings. The width of each of the footings is to remain constant wil vary. In order to reduce the number of calculations, you have decided to plot the ultimate bearing capacity against the length of the footing. The properties of the underlying soil profile are given in Table 1.1. The base of the footing is to be located 1 m below ground level...
settlement calculation
confused as how the settlement per soil layer was obtained in
mm, not getting the unit conversion right. For example, when I
apply for formula s for first layer I obtain s=97.6 but the answer
is 9.76
mv= 0.8 m^2/MN
ness Terzaghi's method S- depth below L'/z foundation 9.8 61 0.24 5 6.6 4.2 2 41 0.16 0.101 1.67 0.67 2 26 18 0.4 5 2.9 2 0.29 0.22 0.069 0.71 0.56 1.9 12 0.045 25.4 It is...
Question 2 [Marks: 15 +10=25] 200kPa of construction stress was applied on top of the soil layers as shown in the figure below. (1) Calculate the settlement in the clay layer due to the construction (minimum of 2 sub layers is to be used). (W) If the soil went through 90% average degree of consolidation in 1 year, calculate the coefficient of consolidation (C.). 个 Sand Y = 20kN/m 4m Water table Clay (over consolidated) y = 16kN/m 100 4m...
Question 8 , need help with part (a), (b), (c) values are
highlighted
Sandgrous e Co. has hired you as Junior Engineer. Your first task as engineer is to help in the design of an electrical hoist-winch capable to hoist V8 engines at constant sp design is show motor, located at A; a shaft passing thro points C and D; a shaft passing through the points D-E-F; two mating spur gears, locate windlass, located at G; and three bearings, located...