only number 3
Southwestern University South Day Sweate AL One of m demanding Wha wad. With dance. WU to face the head on. Althoch alarm wi

3
Southwester University: (A)* Southwestern University (SWU), a large state college in Stephenville, Texas, 30 miles southwest
20 30 H 2.000 20 25 60 2.000 Hardware/AC/metal workings Tile carpet/windows Inspection Final detail work/cleanup H 8 10 K 12
0 0
Add a comment Improve this question Transcribed image text
Answer #1

1)

Step 1 Draw the project network diagram B >E —> F A G >H L C->D J -> Step 2 For each activity, find the expected time TE = (a

-----------------------------------------------

2)

For target time of 265 days, z value = (265-260)/17.87 = 0.28

P(z) = NORMSDIST(0.28) = 0.61

Probability of completing the project in less than 265 days = 0.61 or 61 %

-----------------------------------------------

3)

There are four paths in the network.

These paths and their respective duration are listed below:

Path Duration
A-B-E-F-G-H-I-L 230.1
A-B-E-F-G-H-J-K-L 210.2
A-C-D-G-H-I-L 260
A-C-D-G-H-J-K-L 240.1

Activity A is on critical path and has the lowest crash cost/day.

Crash time of activity A = 30-20 = 10 days, So, activity A is crashed by 10 days at a cost of $ 1500 per day

Activity D on critical path has the next lowest crash cost/day. Crash time of activity D = 55-30 = 25 days. So, activity D is crashed by 25 days at a cost of $ 1900 per day

Now, the project duration has been shortened by 10+25 = 35 days

Activity H or I has the next lowest crash cost/day. So, either of these activities is crashed by 5 days.

Let's say activity H is crashed by 5 days at a cost of $ 2000 per day

Summary: Activity A, D and H needs to be crashed by 10, 25 and 5 days respectively.

Project duration after crashing = 220 days

Total crash cost = 1500*10+1900*25+2000*5 = $ 72,500

Total savings in penalty = 10000*40 = $ 400,000

Add a comment
Know the answer?
Add Answer to:
only number 3 3 Southwestern University South Day Sweate AL One of m' demanding Wha wad....
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • just need 2 and 3 Southwestern University (A) Southwester Unity Swage wat AL dom ACTIVE Bonde...

    just need 2 and 3 Southwestern University (A) Southwester Unity Swage wat AL dom ACTIVE Bonde . One of a demandej ad With dance w to face the head on Auch cal armwrestling and some seriously Wisme president of Southwestern University, decision to expand the capacity at Adding thods of all, including of boxes, would not please everyone. The argued them for a festa di un tory for his players and a paleta office app the couch of a future...

  • ISE 361 2019 Spring Homework Southwestern University Southwestern University (SWU), a large state college in Stephenwille,...

    ISE 361 2019 Spring Homework Southwestern University Southwestern University (SWU), a large state college in Stephenwille, Texas, 30 miles southwest of the Dallas/Fort Worth metroplex, enrolls close to 20,000 students. In a typical town-gown relationship, the school is a dominant force in the smalil city, with more students during fall and spring than permanent residents. A longtime football powerhouse, SWU is a member of the Big Eleven conference and is usually in the top 20 in college footbal rankings. To...

  • tii) Speed delivery of special accessories by 3 days CASE STUDIES Southwestern University: (A) Southwesterm University...

    tii) Speed delivery of special accessories by 3 days CASE STUDIES Southwestern University: (A) Southwesterm University (SWU), a large state college in Stephenville season opening game. The contractor, Hill Construction (Bob Hill Texas, 30 miles southwest of the Dallas/Fort Worth metroplex, being an alumnus, of course), signed his contract. Bob Hill looked at enrolls close to 20,000 stadents. In a typical town-gown relationship. the tasks his engineers had outlised and looked President Wiseer in the school is a dominant force...

  • Case Studies Case Studies 99 Southwestern University: (A)* southwestern University (SWU), a large state college in...

    Case Studies Case Studies 99 Southwestern University: (A)* southwestern University (SWU), a large state college in Stephenville. 30 miles southwest of the Dallas/Fort Worth was made, and everyone, including the couch, woald learn to live metroplex, enrolls 0tudents. In a typical towa-gown relationship, the close to 20,000 with it is a dominant force in the small city, with more students The job now was to get constraction going immediately after during the 2007 season ended. This would alow exactly 270...

  • 1. Develop a network drawing for Hill Construction and determine the critical path. How long is...

    1. Develop a network drawing for Hill Construction and determine the critical path. How long is the project expected to take? 2. What is the probability of finishing in 270 days? 3. If it is necessary to crash to 250 or 240 days, how would Hill do so, and at what costs? As noted in the case, assume that optimistic time estimates can be used as crash times. Southwestern University: (A)* Southwestern University (SWU), a large state college in Stephenville,...

  • Chapter 3 – Program Management Case Study Minnesota State University (MSU), a large state college in...

    Chapter 3 – Program Management Case Study Minnesota State University (MSU), a large state college in Mankato, Minnesota, 30 miles southwest of the Dallas/Fort Worth metroplex, enrolls close to 15,000 students. In a typical town–gown relationship, the school is a dominant force in the small city, with more students during fall and spring than permanent residents. A longtime Division II football powerhouse, MSU is a member of the Northern Sun Intercollegiate conference and is usually in the top 20 in...

  • Fast Creek is a city in south central Saskatchewan located along the Trans-Canada Highway. Fast Creek...

    Fast Creek is a city in south central Saskatchewan located along the Trans-Canada Highway. Fast Creek has a population of just over 27 000 residents and is a regional hub for the many smaller towns and hundreds of farms in the surrounding area. Fast Creek is a transportation and industrial centre, and has several federal and provincial government offices. Fast Creek is also a sports centre, and its junior hockey team, the Fast Creek Lightning, have a long history of...

  • solve it with step by step please and how each number is calculated Southwestern University (SWU),...

    solve it with step by step please and how each number is calculated Southwestern University (SWU), a large state college in Stephenville, Texas enrolls close to 20,000 students. It is the dominant force in the small city, with more students during fall and spring than permanent residents. A longtime football powerhouse, the University s a member of the Big Eleven conference and is usually in the top 20 in college football rankings. To bolster its chances of reaching the elusive...

  • Southwestern University (SWU), a large state college in Stephenville, Texas enrolls close to 20,000 students. It...

    Southwestern University (SWU), a large state college in Stephenville, Texas enrolls close to 20,000 students. It is the dominant force in the small city, with more students during fall and spring than permanent residents. A longtime football powerhouse, the University s a member of the Big Eleven conference and is usually in the top 20 in college football rankings. To bolster its chances of reaching the elusive and long-desired number-one ranking, in 2013 the University hired the legendary Billy Bob...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT