tii) Speed delivery of special accessories by 3 days CASE STUDIES Southwestern University: (A) Southwesterm University (SWU), a large state college in Stephenville season opening game. The contractor, Hill Construction (Bob Hill Texas, 30 miles southwest of the Dallas/Fort Worth metroplex, being an alumnus, of course), signed his contract. Bob Hill looked at enrolls close to 20,000 stadents. In a typical town-gown relationship. the tasks his engineers had outlised and looked President Wiseer in the school is a dominant force in the small city, with more students the cye. I guarantee the team will be able to take the field on sched- during fall and spring than permanent residents. ule next year. he sald with a sense of coafidence. 1 sure hope so, A longtime football powertiouse, swU is a member of the Big replied Wisner. The contract penalty of $10,000 per day for running Eleven conference and is usually in the top 20 in college football late is nothing compared to what Coach Flamm will do to you if our rankings. To bolster its chances of reaching the elusive and long opening game witch Pemn State is delayed or canceled. Hill, sweat desired number-one ranking, in 2006, SWU hired the legendary Phil ing slightly, did not need to respond. In football-crary Texas, Hill Flamm as its head coach. Construction would be mad if the 270-day target was missed. One of Flamms demands on joining SWU had been a new sta- dium. With attendance increasing, SWU administrasors began to face the issue head.。. After 6 months of gudy, much political arm wres- tling, and some serlous financial analysis, Dr. Joel Wisner, presides of Southwestern University, had reached a decision to expand the capacity at its on-campus stadium. Back in his office, Hill again reviewed the data (see Table 6) and noted that optimistic time estimates can be used as crash times. He then gathered his foremen Folks, if were not 75% sore well finish this stadiom in less than 270 days,I want this project crashed! Give me the cost figures for a target date of 250 days-also for 240 days.I want to be early, not just on timef Adding thousands of seats, including dozens of luxury skyboxes, would not please everyone. The influential Flarmm had argued the Discussion Questions nced for a first-class stadium, one with built-in dormitory rooms for 1. Develop a network drawing for Hill Constraction and determise his players and a palatial office appropriate for the cosch of a fuoure NCAA champion team. But the decision was made, and everyone, 2. What is the probablity of finishing ia 270 days? including the coach, would learn to live with it. the critical path. How long is the project expected to take? 3. If it is necessary to crash to 250 or 240 days, bow would Hill do The job now was to get construction going immediately after the 2012 season ended. This woold allow exactly 270 days until the 2013 so, and at what costs? As noted in the case, assume that optimistic time estimates can be used as crash times. ABLE 6 Southwestern University Project IME ESTIMATES (DAYS PREDECESSORIS) OPTIMISTIC MOST LIKELY PESSIMISTIC CRASH COSTIDAY 1,500 3,500 4,000 1,900 9,500 ACTIVITY DESCRIPTION Bonding insurance, tax structuring Foundation, concrese footings for boses Upgrading skybox stadium seating Upgrading walkways, stairwells, elevators interlor wiring lathes rspection approvals 0.1 0.1 D, F 2.500 2,000 2,000 Hardware ACimetal workings 0.1 0.1 500 Final detail workidleanup

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Activi Optimistic Most likel Pessimistic Expected time B2+4*C2+D2)/6 (B3+4*C3+D3)/6 B4+4*C4+D4)/6 B5+4*C5+D5)/6 (B6+4*C6+D6)/Aciuy Ogeinetec oected tines Vanance 20 20 30 65 60 30 60 65 섹) a) 100 100 35 0.1 35 30 60 12 0.1 60 100.0000 69.4444 30 30 0e(36)2 one 449-9 30 h (30) 30 9S H (20) 2ヂ 210 230 2OD 229-9 2bo 230 Es ldThe completion time is 260

The critical path is A-C-D-G-H-I-L as the floats of all these activities are Zero

b)

To find the probability we need to find Z value

Z= (Expected time- Critical path time)/ Stddevcp

Expected time = 270

Critical path time = 260

Stddevcp is standard deviation along critical path

Stddevcp = Sqrt(Vcp)

Vcp- variance along critical path which is sum of variances of critical activities

Vcp = 11.1111+ 69.4444+136.1111+2.7778+11.1111+44.4444+44.4444= 319.4444

Stddevcp= Sqrt(319.4444) = 17.873

Z= (270-260)/17.873

Z= 0.5595

Corresponding probability is 0.712 which is 71.2%

c) If project has to be reduced to 250 units , then first A has to be crashed for 10 days at a cost of 1500*10 = 15000

Expected time is 30 and optmistic is 20. Therefore a maximum of (30-20)=10 days can be crashed for A,

If the project has to be further crashed to 240, then next least cost activity D has to be crashed at 10*1900 = 19000

Therefore total cost for crashing project to 240 days = 15000+19000 = 34000

The critical activities have to be crashed first. The activities with least crash cost per day are crashed first.

Add a comment
Know the answer?
Add Answer to:
tii) Speed delivery of special accessories by 3 days CASE STUDIES Southwestern University: (A) Southwesterm University...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • ISE 361 2019 Spring Homework Southwestern University Southwestern University (SWU), a large state college in Stephenwille,...

    ISE 361 2019 Spring Homework Southwestern University Southwestern University (SWU), a large state college in Stephenwille, Texas, 30 miles southwest of the Dallas/Fort Worth metroplex, enrolls close to 20,000 students. In a typical town-gown relationship, the school is a dominant force in the smalil city, with more students during fall and spring than permanent residents. A longtime football powerhouse, SWU is a member of the Big Eleven conference and is usually in the top 20 in college footbal rankings. To...

  • Case Studies Case Studies 99 Southwestern University: (A)* southwestern University (SWU), a large state college in...

    Case Studies Case Studies 99 Southwestern University: (A)* southwestern University (SWU), a large state college in Stephenville. 30 miles southwest of the Dallas/Fort Worth was made, and everyone, including the couch, woald learn to live metroplex, enrolls 0tudents. In a typical towa-gown relationship, the close to 20,000 with it is a dominant force in the small city, with more students The job now was to get constraction going immediately after during the 2007 season ended. This would alow exactly 270...

  • only number 3 3 Southwestern University South Day Sweate AL One of m' demanding Wha wad....

    only number 3 3 Southwestern University South Day Sweate AL One of m' demanding Wha wad. With dance. WU to face the head on. Althoch alarm wing and some seriously Wisner, president of Southwester Unity deci to Adding thods of all, including of boxes, would not please everyone. The went argued the foreftad tory for his players and a place App the couch of a fare NCAA champion Bondag pobability of 1 The bow to get to de 2015 eded....

  • just need 2 and 3 Southwestern University (A) Southwester Unity Swage wat AL dom ACTIVE Bonde...

    just need 2 and 3 Southwestern University (A) Southwester Unity Swage wat AL dom ACTIVE Bonde . One of a demandej ad With dance w to face the head on Auch cal armwrestling and some seriously Wisme president of Southwestern University, decision to expand the capacity at Adding thods of all, including of boxes, would not please everyone. The argued them for a festa di un tory for his players and a paleta office app the couch of a future...

  • 1. Develop a network drawing for Hill Construction and determine the critical path. How long is...

    1. Develop a network drawing for Hill Construction and determine the critical path. How long is the project expected to take? 2. What is the probability of finishing in 270 days? 3. If it is necessary to crash to 250 or 240 days, how would Hill do so, and at what costs? As noted in the case, assume that optimistic time estimates can be used as crash times. Southwestern University: (A)* Southwestern University (SWU), a large state college in Stephenville,...

  • Chapter 3 – Program Management Case Study Minnesota State University (MSU), a large state college in...

    Chapter 3 – Program Management Case Study Minnesota State University (MSU), a large state college in Mankato, Minnesota, 30 miles southwest of the Dallas/Fort Worth metroplex, enrolls close to 15,000 students. In a typical town–gown relationship, the school is a dominant force in the small city, with more students during fall and spring than permanent residents. A longtime Division II football powerhouse, MSU is a member of the Northern Sun Intercollegiate conference and is usually in the top 20 in...

  • Fast Creek is a city in south central Saskatchewan located along the Trans-Canada Highway. Fast Creek...

    Fast Creek is a city in south central Saskatchewan located along the Trans-Canada Highway. Fast Creek has a population of just over 27 000 residents and is a regional hub for the many smaller towns and hundreds of farms in the surrounding area. Fast Creek is a transportation and industrial centre, and has several federal and provincial government offices. Fast Creek is also a sports centre, and its junior hockey team, the Fast Creek Lightning, have a long history of...

  • Location Strategies:   Southwestern University’s Location Decision With the steady growth in attendance at Saturday home football...

    Location Strategies:   Southwestern University’s Location Decision With the steady growth in attendance at Saturday home football games, Southwestern University’s president, Dr. Joel Wisner, had reached a decision. The existing stadium, with seating capacity of 54,000, simply would not suffice. But the choice of what to do was anything but clear to President Wisner. His vice president of development, Leslie Gardner, had presented three options: (1) expand the existing stadium to 75,000 seats, adding numerous luxury skyboxes and upgrading most of...

  • solve it with step by step please and how each number is calculated Southwestern University (SWU),...

    solve it with step by step please and how each number is calculated Southwestern University (SWU), a large state college in Stephenville, Texas enrolls close to 20,000 students. It is the dominant force in the small city, with more students during fall and spring than permanent residents. A longtime football powerhouse, the University s a member of the Big Eleven conference and is usually in the top 20 in college football rankings. To bolster its chances of reaching the elusive...

  • Southwestern University (SWU), a large state college in Stephenville, Texas enrolls close to 20,000 students. It...

    Southwestern University (SWU), a large state college in Stephenville, Texas enrolls close to 20,000 students. It is the dominant force in the small city, with more students during fall and spring than permanent residents. A longtime football powerhouse, the University s a member of the Big Eleven conference and is usually in the top 20 in college football rankings. To bolster its chances of reaching the elusive and long-desired number-one ranking, in 2013 the University hired the legendary Billy Bob...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT