a)
| Overhead rate based on machine hours | 800,000 / 10,000 = 80 |
| Cost for 8000 units 2000* 80 | 160,000 |
b)
| Cost | Cost Driver | Activity Rate | Product X | ||
| Unit | 500,000 | 10,000 | 50 | 2,000 | 100,000 |
| Batch | 100,000 | 500 | 200 | 10 | 2,000 |
| Product | 200,000 | 25 | 8,000 | 1 | 8,000 |
| Total Cost | 110,000 |
| c) | Predicted X1 manufacturing overhead based on machine hours | 160,000 |
| Predicted X1 manufacturing overhead using cost hierarchy | 110,000 | |
| Over prediction of X1 manufacturing overhead costs with use of machine hours | 50,000 |
| d) | Batch - level rate per machine hour (100,000 / 10,000) = 10 Therfore 10 * 2,000 | 20,000 |
| Activity rate using batch level 200 * 10 batch | 2,000 | |
| Over - prediction of X1 batch - level costs with use of machine hours | 18,000 |
| e) | Product - level rate per machine hour (200,000 / 10,000) = 20 | 40,000 |
| Activity rate using batch level 8000 * 1 product | 8,000 | |
| Over - prediction of X1 batch - level costs with use of machine hours | 32,000 |
Multiple Cost Drivers Scottsdale Ltd. manufactures a variety of high-volume and low volume products to customer...
Multiple Cost Drivers Scottsdale Ltd. manufactures a variety of high-volume and low-volume products to customer demand. Presented is information on 2009 manufacturing overhead and activity cost drivers. Level Total Cost Units of Cost Driver Unit $500,000 20,000 machine hours Batch 200,000 1,000 customer orders Product 200,000 50 products Product X1 required 2,000 machine hours to fill 10 customer orders for a total of 8,000 units. (a) Assuming all manufacturing overhead is estimated and predicted on the basis of machine hours,...
Scottsdale Ltd. manufactures a variety of high-volume and low-volume products to customer demand. Presented is information on 2009 manufacturing overhead and activity cost drivers. Level Total Cost Units of Cost Driver Unit $400,000 20,000 machine hours Batch 200,000 1,000 customer products Product 200,000 50 products Product X1 required 1,000 machine hours to fill 20 customer orders for a total of 8,000 units. (a) Assuming all manufacturing overhead is estimated and predicted on the basis of machine hours, determine the predicted...
my
professor just wants part A answered
Aridge Business Publishers Module 15 Cost Behavior, Activity Analysis, and Cost Estimation Month Total Costs January February March April May Sales (Dozens) 6,800 7,800 5,500 1,000 6,100 4,500 $30,650 35,336 29,700 25,000 30,600 28,670 June Required 4. Using the high-low method, develop a cost-estimating equation for total monthly costs. b. 1. Plot the equation developed in requirement (a). 2. Using the same graph, develop a scatter diagram of all observations for the cookie...
Superindo Company manufactures a variety of high- and low-volume products, including Product 365, in its Bekasi-West Java plant. The following information pertains to the most recent year: Total for Product 365 Total for Bekasi-West Java Unit level overhead $ 200,000 Batch-Level Overhead 300,000 Product-Level Overhead 500,000 Plant-Level Overhead 400,000 Total Overhead $1,400,000 Unit produced 5,000 Direct Labor hours 20,000 Machine hours 10,000 Setups 120 Setup hours 500 Design changes 40 Design hours 280 4,000 Required: 1. If the Bekasi-West Java...
Two-Stage ABC for Manufacturing Merlot Company has determined its activity cost pools and cost drivers to be the following: Cost Pools Setup Material handling Machine operation packing Total indirect manufacturing costs $112,000 25,600 480,000 60,000 $677,600 Cost drivers Setups Material moves Machine hours Packing orders 350 640 20,000 1,200 One product made by Merlot, metal casements, used the following activities during the period to produce 500 units: Setups Material moves 80 Machine hours 1,900 Packing orders 150 20 a. Calculate...
Two-Stage ABC for Manufacturing Meridian Company has determined its activity cost pools and cost drivers to be the following: Cost pools Setup $63.000 Material handling 25,600 Machine operation 220,000 Packing 90.000 Total indirect manufacturing costs $398,600 Cost drivers Setups 350 Material moves 640 Machine hours 20,000 Packing orders 1.200 One product made by Meridian, metal casements, used the following activities during the period to produce 500 units: Setups 20 Material moves Machine hours 1,900 Packing orders 150 (a) Calculate the...
Two-Stage ABC for Manufacturing Meridian Company has determined its activity cost pools and cost drivers to be the following: Cost pools Setup $35,000 Material handling 12,800 Machine operation 280,000 Packing 30,000 Total indirect manufacturing costs $357,800 Cost drivers Setups 350 Material moves 640 Machine hours 20,000 Packing orders 1,200 One product made by Meridian, metal casements, used the following activities during the period to produce 500 units: Setups 20 Material moves 80 Machine hours 1,900 Packing orders 150 (a) Calculate...
Orange, Inc. has identified the following cost drivers for its expected overhead costs for the Cost Pools Setup Ordering Maintenance Power Budgeted Cost $70,000 35,000 87,500 17,500 Cost Driver Number of setups Number of orders Machine hours Kilowatt hours Cost Driver Level 350 1,750 8,750 17,500 Total direct labor hours budgeted = 3,500 hours. The following data applies to Product X, one of the products completed during the year. Direct materials Direct labor Units completed Direct labor hours Number of...
Orange, Inc. has identified the following cost drivers for its expected overhead costs for the year: Cost Pools Budgeted Cost Cost Driver Cost Driver Level Setup $ 220,000 Number of setups 1,100 Ordering 110,000 Number of orders 5,500 Maintenance 275,000 Machine hours 27,500 Power 55,000 Kilowatt hours 55,000 Total direct labor hours budgeted = 11,000 hours. The following data applies to Product X, one of the products completed during the year. Direct materials $ 5,500 Direct labor $ 6,600 Units...
Flynn Industries has three activity cost pools and two products. It expects to produce 3,110 units of Product BC113 and 1,530 of Product AD908. Having identified its activity cost pools and the cost drivers for each pool, Flynn accumulated the following data relative to those activity cost pools and cost drivers Expected Use of Cost Drivers per Product Annual Overhead Data Activity Cost Pools Machine setup Machining Packing Cost Drivers Setups Machine hours Orders Estimated Overhead $19,166 103,820 31,744 Expected...