Question

The 2-hr unit hydrograph is given in the table. Determine the 4-hr unit hydrograph. Use the given table. The last column of y


A water resources problem. Please answer with clear steps.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Solution he d hoe Uait Hydrogrcaph is given in toble Io orde have to togged each by 2hr and than dividing i n s shouop below

Add a comment
Know the answer?
Add Answer to:
A water resources problem. Please answer with clear steps. The 2-hr unit hydrograph is given in...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The one-hr unit hydrograph is given in the table. Determine the 2-hr unit hydrograph. Use the...

    The one-hr unit hydrograph is given in the table. Determine the 2-hr unit hydrograph. Use the given table. The last column of your data count as your final answer 1-hr time UH (hr) (cfs) 0.5 1.5 2.5 3.5

  • 2. (20pts) The discharge rates for an 1-hr unit hydrograph are given (see Table 1). Develop...

    2. (20pts) The discharge rates for an 1-hr unit hydrograph are given (see Table 1). Develop a 3-hr hydrograph with 2 in prepicitation (a rough sketch is optional) Table 1. 1-hr UH Time, hr Runoff (cfs) 0 0 100 2 250 3 150 4 0 1 Working table:

  • Question J. (2010 ) A 2-hour unit hydrograph for a drainage area is given below. a)...

    Question J. (2010 ) A 2-hour unit hydrograph for a drainage area is given below. a) Derive the streamflow hydrograph for a storm that produces 0.5 in. and 1.0 in. of excess precipitation over two consecutive 2-hour periods. Assume the baseflow is negligible. b) What is the peak rate of the streamflow and time to peak? Present all steps of your calculations. UH Time (hr) (cfs) 0 12 26 12 8 0 14

  • The 4-hr unit hydrograph for a watershed is given as below. Time (hr) 2 4 6...

    The 4-hr unit hydrograph for a watershed is given as below. Time (hr) 2 4 6 8 10 12 14 Unit hydrograph (m3/s/10 mm) A design storm has 1.5 cm/hr in first 2 hr and 1.0 cm/hr in the second 2 hr. The abstraction rate is 0.5 cm/hr. Base flow is 10 m/s. Calculate the total runofi hydrograph.

  • 2. A 10-minute unit hydrograph (UH) of a catchment is given in the table below. What...

    2. A 10-minute unit hydrograph (UH) of a catchment is given in the table below. What is the catchment area? (5 marks) Time step (10 minutes) 1 2 3 4 Discharge (mº/{s.cm)) 8 18 30 10 For a storm partern given in the table below, determine and plot runoff hydrograph at a 5-minute interval using the above 10-minute UH. Determine the time of concentration of the catchment. Assume the o index value for the catchment to be 12 mm/hr, and...

  • Please solve the following problem and show all work. Thank you! Determine the 4-hr unit hydrograph using the following...

    Please solve the following problem and show all work. Thank you! Determine the 4-hr unit hydrograph using the following data for a watershed having a drainage area of 200 km2, assuming a constant rainfall abstraction rate and a constant baseflow of 20 m'/s. Present your results in tabular and graphical forms. Four-hour period Rainfall (cmQ(m/s) 1.0 2.5 4.0 2.0 20 30 60 95 130 170 195 175 70 25 20 10

  • 2. [10 points] Determine the 4-hr unit hydrograph using the following data for a watershed having...

    2. [10 points] Determine the 4-hr unit hydrograph using the following data for a watershed having a drainage area of 200 km, assuming a constant rainfall abstraction rate of 1 cm per time period and a constant baseflow of 20 m3's. The ordinates of the unit hydrograph are in units of m s cm Four-hour period | 1 | 2-1 3 i 41 5 6 7 8 9 10| 11 Rainfall (cm) Streamflow (m s) 20 35 60 95 130...

  • Problem 2: The storage-outflow relationship of a reservoir is given below. Determine a) the outflow hydrograph...

    Problem 2: The storage-outflow relationship of a reservoir is given below. Determine a) the outflow hydrograph of this reservoir for the given inflow hydrograph. b) the attenuation and translation (106 m3) mos 5 60 10 120 15 180 20 240 25 300 30 360 35 420 40 480 Time imiony 0 7 2 14 4 36 6 45 8 35 10 25 12 19 14 15 16 13 18 11 20 9 22

  • 3 and 4 3. Discharge rates for a flood hydrograph passing the outlet of a 600-acre...

    3 and 4 3. Discharge rates for a flood hydrograph passing the outlet of a 600-acre drainage basin is given below. The flood was produced by a uniform rainfall rate of 2.75 in/hr, which started at 9 am and ended abruptly at 11 am. Time (hr)Q (cfs) 8:00 AM100 9:00 AM100 10:00 AM 300 11:00 AM 500 12:00 PM 700 1:00 PM800 2:00 PM600 3:00 PM400 4:00 PM 300 5:00 PM 6:00 PM 100 7:00 PM100 200 a) At what...

  • please help me , show all steps , please make your font clear.. Problem 1: A...

    please help me , show all steps , please make your font clear.. Problem 1: A project to move packed earth requires you to decide whether to use a dozer/scraper operation or excavator/truck operation. Determine the most economical operation based on the dozer/scraper operation estimated at S6.25/lcy All equipment carries a rated heaped capacity, has a fill factor of 105%, and works 45-min hours. Excavators costs $95/hr (including operator), cycle time is 0.28 min, and bucket heaped capacity is 3...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT