Please show how you got the answer. Thank you!

Please show how you got the answer. Thank you! Given the lead time for continuous flow...
**86 at 40 not 88. please show how got Tr in calculations thank you 2) The following temperature-time data has been collected during UHT processing of a liquid food: Time (s) Temperature (°C) 10 69 15 83 20 90 35 90 40 86 Estimate the lethality (F80) for a microbial pathogen with z = 8°C. Determine the number of survivors at the end of this process for an initial population of 5.2 106 CFU and the D80 = 0.53...
Please explain how you got answer thank you Suburbia Company manufactures a product through a continuous single-step process. All materials are added at the beginning of processing. Production and cost data for the company for February 2016 are as follows: Production data: In process, beginning of month (20% converted) 1,000 units Started during February 5,000 units Completed and transferred to finished goods 4,500 units In process, end of month (60% converted) 1,500 units Manufacturing costs: Work in process, beginning (Direct...
please show how u got to ur
answer! thank u!!
If you turn on a water faucet so that the water flows smoothly, you should observe that the cross-sectional area of the water stream decreases as the stream drops. At a particular point, the flow speed is 40.0 cm/s and the stream has a cross-sectional area of 2.00 cm2. Use g 9.80 m/s2. At a point 7.00 cm below the first point, determine the following. (a) the flow speed 117.13X...
got this wrong, can someone please show solution to
it. thank you
13. How many liters of çhlorine gas at 25 °C and 0.950 atm can be produced by the reaction of 0.0460 mol of MnO2 with excess HCI(aq) according to the following chemical equation? MnC2(s)+ 4HCI(aq) → MnCl2(aq) + 2H:001)ỚCI2(g) eaces (A)36 × 103 L. B)0.138 L-C) 0:282 L . D) 1.18 L 3.55 L
Please show how you got to this answer. Thank you!
P5-43 Deposits to accumulate future sums For each case shown in the following tabie. determine the amount of the equal, end-of-year deposits necessary to the given sum at the end of the specified period, assuming the stated annual interest rate. accumulate Sum to bc Accumulation Interest Case accumulated pcriod (ycars) rate 12% $ 5,000 100,000 30,000 15,000 20 10 12
please show all work and steps
, thank you
Exercise 3. Consider the continuous-time signal (t) = sin(at) where a is a positive finite value. Let y(t) = zº(t). The following signals are sampled using a train of impulses with periodicity T, 8(t – kt): signal z(t) is sampled to obtain 2.(t), and signal y(t) is sampled to obtain yo(t). A) Determine the range of values for T that allows complete recovery of r(t) from .(t) [pt. 10]. B) Determine...
please show how you got this answer thank you!
Solve for x: log16 2 + log16(x + 6) = 1 If an answer does not work, enter DNE. Be sure to enter any numerical answers first. CE = Enter an integer or decimal number (more...)
Please assist with finding the variable and show how you got the answer. Thank you A manufactured product has the following information for June. Standard Actual Direct materials (5 lbs. @ $8 per lb.) 42,100 lbs. @ $8.10 per lb. Direct labor (2 hrs. @ $16 per hr.) 16,400 hrs. @ $16.50 per hr. Overhead (2 hrs. @ $11 per hr.) $ 188,500 Units manufactured 8,300 (2) Compute the total cost variance for June. Indicate whether the cost variance is...
Please show how you got the answers. Thank you very
much!
17. Consider CO2(g) + Hag) COlgt Ho,g) 艹 If there are 1.43 mols each of CO and H0,0.572 mols H and 4.572 mols CO,, in a 4.0 L container at equilibrium, what is Kc? A. 0.547 B. 0.782 C. 1.28 D. 0.137 E. None of these 18. Consider the reaction: 2 song) + Ogg) ←→ 2 SOgg) DH-:-96.6 kJ/mol The equilibrium is displaced to the left if A. B....
Please write out correct answer and whether it’s A, B, C or D.
Thank you.
Christmas Express makes wreaths in batch sizes of 12. The cutting & assembly process takes 8 minutes per wreath and the decorating process time is 10 minutes per wreath. It takes 12 minutes to move the wreaths from the cutting & assembly process to the decorating process. Compute the non-value-added lead time. 198 minutes 0216 minutes 228 minutes 210 minutes