9) Electrical power is to be generated by installing a hydraulic turbine-generator at a site 70...

9) Electrical power is to be generated by installing a hydraulic turbine-generator at a site 70 m below the free surface of a large water reservoir that can supply water at a rate of 1500 kg/s steadily. If the mechanical power output of the turbine is 800 kW and the electric power generation is 350 kW, determine the turbine efficiency and the combined turbine-generator efficiency of this plant. Neglect losses in the pipes. (10pts).

9) Electrical power is to be generated by installing a hydraulic turbine-generator at a site 70 m below the free surface of a large water reservoir that can supply water at a rate of 1500 kg/s steadily. If the mechanical power output of the turbine is 800 kW and the electric power generation is 350 kW, determine the turbine efficiency and the combined turbine-generator efficiency of this plant. Neglect losses in the pipes. (10pts).
0 0
Report
Answer #1

olucion Given eat Given data eg Powa turbine ,» w Y conven ence. C. e cans egpes ut Mansbecomes (OoD tee raio ot Poes lades loturbine (024 ·Tae turbine effalu ubi . e Combin ineae C Dowes Welect-out Wmed o 2 turbine-gem

Know the answer?
Add Answer to:
9) Electrical power is to be generated by installing a hydraulic turbine-generator at a site 70...
Your Answer: Your Name: What's your source?
Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 9. The absolute pressure in water at a depth of 5 m is 145 kPa. What...

    9. The absolute pressure in water at a depth of 5 m is 145 kPa. What is the absolute pressure in a liquid whose specific gravity is 1.34 at the same depth? Hint: Determine the atmaspheric pressure first 10. Water is pumped from a lake to a storage tank 30 m above at a rate of 55 L/s, while consuming 22.6 kW of electrie power to run the motor. Detemine the overall efficiency of the motor-pump unit. .A hydraulic power...

  • WGTC η.cn = 95% Gas turbine cycle (GTc) e,I = 100 kW Compressor Turbine Generator 께,- Combustor ...

    wGTC η.cn = 95% Gas turbine cycle (GTc) e,I = 100 kW Compressor Turbine Generator 께,- Combustor Pi 100 kPa Regenerator Evaporator Turbine Generator Vapor turbine cycde (VTC) T, = T, + 20 K Condenser 10 Pump Saturated liquid A combined cycle plant operates with a topping gas turbine and a bottoming vapor turbine cycle. The working fluid in the vapor turbine cycle is water. The gas turbine cycle (GTC) electric generator produces 100kW of electric power For air use...

  • hydroelectric power plant problem provided in a standby plantr Tme enceCythe hyuidelectiic lali wiii The demand for electric power is usually much lighter during the day than it is at night, and u...

    hydroelectric power plant problem provided in a standby plantr Tme enceCythe hyuidelectiic lali wiii The demand for electric power is usually much lighter during the day than it is at night, and utility companies often sell power at night at much lower prices to encourage consumers to use the available power generation capacity and to avoid building new expensive power plant that will be used only a short time during peak periods. Utilities are also to purchase power produced during...

  • ENGR 320 Exam2 Name 1: (15+5 pts) A hydroelectric power plant takes in 25 m's of water through it...

    ENGR 320 Exam2 Name 1: (15+5 pts) A hydroelectric power plant takes in 25 m's of water through its turbine and discharges it to the atmosphere at V2-I m/s. The head loss in the turbine and penstock system is 10 m. Assuming turbulent flow, a -1.12, (a) What it the power in MW extracted by the turbine? () If the efficiency of the turbine and electrical generator is 85% what is the net power (in MW) generated by this plant?...

  • Please help me thanks. The vertical drop of water in a hydroelectric power plant is 125m...

    Please help me thanks. The vertical drop of water in a hydroelectric power plant is 125m (See figure below). Water flows through the plant and into the lower river at the rate of 325m/s. Assume the overall efficiency n of the plant as 80%. Density of water d is equal to 1000kg/mº. Acceleration due to gravity g is equal to 9.81m/s2. Ignore the viscous losses in the flowing water. Dam Water Reservoir Hm Turbine Generator River Figure: Schematic diagram of...

  • The vertical drop of water in a hydroelectric power plant is 155m (See figure below). Water...

    The vertical drop of water in a hydroelectric power plant is 155m (See figure below). Water flows through the plant and into the lower river at the rate of 425m/s. Assume the overall efficiency of the plant as 80%. Density of water d is equal to 1000kg/m3 Acceleration due to gravity g is equal to 9.81m/s2. Ignore the viscous losses in the flowing water. Dam Water Reservoir Hm Turbine Generator River Figure: Schematic diagram of the hydroelectric power plant (a)...

  • Mechanical Power of water exiting the Penstock

    A man owns a land that includes a low head water fall and wants to build a small hydroelectric plant. He used a tube of 3 m length and 1 m diameter as a penstock. Hecomputed the speed of the water inside the penstock by dropping a small ball at the entrance of the tube and measuring the time it took to reach the other end of thetube. The ball traveled the penstock in 2 s.A)Compute the mechanical powerB)If the...

  • A combined cycle power plant consists of two gas turbines; cach produces a net power of...

    A combined cycle power plant consists of two gas turbines; cach produces a net power of 160 MW, and a 70 MW steam power cycle. The combustion of the fuel in the combustion chamber produces hot gases at 1400°C. The hot gases leaving the gas turbines are used to generate steam through the heat recovery steam generator (Boiler). The hot gases enter the heat recovery steam generator at 880°C and leaves at 660°C. Water enters the isentropic pump as saturated...

  • Combined cycle power plants are common because of their high efficiency and scalability. They typically combine a gas turbine cycle (the Brayton Cycle) with a steam turbine cycle (the Rankine Cycle) [...

    Combined cycle power plants are common because of their high efficiency and scalability. They typically combine a gas turbine cycle (the Brayton Cycle) with a steam turbine cycle (the Rankine Cycle) [1]. The goal of this project is to determine the operating efficiency and profitability of a realistic combined cycle power plant. The power plant is as follows: 1. A natural gas-fired Brayton cycle with mÛ air,Br = 1.25 kg s−1 . (a) Ambient air at 1 bar and 300...

  • The figure shows a schematic of a power plant that has two steam turbines. The water...

    The figure shows a schematic of a power plant that has two steam turbines. The water (the working fluid for the plant) leaves the high pressure turbine (HPT) as saturated vapour at 1000 [kPa]. Part of this flow is diverted to an insulated heat exchanger, which we hot airstream to create superheated steam that enters the low pressure turbine (LPT). The air mas flow rate is 19.5 k/s and the air temperature drops from 1100 to 6001 as it goes...

Free Homework App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.