Problems and Solns 1) 3-162E A semicircular 40-ft-diameter tunnel is to be built under a 150-ft-deep,...
Just 1,2and3
Then, h is computed as follows. cos-=- 154.5 2.0-h 2.0 (Answer) h= 1.56 ft. PROBLEMS T What is the pressure at the bottom of Sunfish Pond, which has a depth of 350 feet? 2. A swimming pool has depths of 4.0 feet and 12.0 feet at the shallow and deep ends, respectively. Find the pressure in lb/ft2 at each end. 3. A reservoir of water is connected to a 12-inch-diameter pipe that is 50 feet long and capped...
help please
A square footing is founded at 3-ft depth below ground surface as shown in Fig1, The factored axial load acting on the square footing is 140 kips, Determine the size of the footing (B x B) if the Factor of Safety (F.S.) is 3.0. Ground surface ЗА B-? Silty Sand Fig.1 A 68-ft long pre-stressed concrete pile with square cross section (14 inch) is driven into the soil profile shown in Fig. 2. Compute the ultimate compressive load...
Water is flowing through a horizontal pipe with diameter, D1, at
a velocity, V1, and under a pressure, P1. It enters a 900 reducing
bend (Shown in grey in Fig 2) that connects to a vertical pipe of
diameter, D2. The inlet of the bend is 50 cm above the exit of the
bend (as shown in Fig 2). Axes for positive directions of x and z
coordinates are provided. Figure 2 Side view of reducing bend from
horizontal to...
10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...