(a) using the excel we get the final iteration table
since
| X1 = 5.64 |
| X2 = 4.57 |
| X3 = 8.60 |
and objective function Z = 36776/351 =104.7749
b) machine 1 - 6 hr
machine 2- 8 hr
machine 3 -4 hr
c) 8.60 $
Kalyan Singhal Corp. makes three products, and has three machines available as resources as given in...
Better Products, Inc., manufactures three products on two machines. In a typical week, 40 hours are available on each machine. The profit contribution and production time in hours per unit are as follows: Category Product 1 Product 2 Product 3 Profit/unit $36 $58 $19 Machine 1 time/unit 0.5 2.5 1.5 Machine 2 time/unit 1 1.5 1.5 Two operators are required for machine 1; thus, 2 hours of labor must be scheduled for each hour of machine 1 time. Only one...
Problem 3-23 (Algorithmic) Vollmer Manufacturing makes three components for sale to refrigeration companies. The components are processed on two machines: a shaper and a grinder. The times (in minutes) required on each machine are as follows: Machine Shaper Grinder Component 1 4 2 5 3 2 The shaper is available for 130 hours, and the grinder is available for 85 hours. No more than 350 units of component 3 can be sold, but up to 1050 units of each of...
Use Excel/Solver add in for accurate answers.
Problem 3-19 (Algorithmic) Better Products, Inc., manufactures three products on two machines. In a typical week, 40 hours are available on each machine. The profit contribution and production time in hours per unit are as follows: Category Product 1 Product 2 Product 3 Profit/unit $39 $51 $18 Machine 1 time/unit 1.5 Machine 2 time/unit Two operators are required for machine 1; thus, 2 hours of labor must be scheduled for each hour of...
A craftsman named William Barnes builds two kinds of birdhouses, one for wrens and a second for bluebirds. Each wren birdhouse takes 4 hours of labor and 4 units of lumber. Each bluebird house requires 2 hours of labor and 12 units of lumber. The craftsman has available 72 hours of labor and 120 units of lumber. Wren houses yield a profit of $6 each and bluebird houses yield a profit of $15 each. The aim of the objective function...
Need A-D
Vollmer Manufacturing makes three components for sale to
refrigeration companies. The components are processed on two
machines: a shaper and a grinder. The times (in minutes) required
on each machine are as follows:
Machine
Component Shaper Grinder
1 6 4
2 4 5
3 4 2
The shaper is available for 120 hours, and the grinder for 110
hours. No more than 200 units of component 3 can be sold, but up to
1,000 units of each of...
A company that manufactures three products, A. & and using three machines, M1, M2, and M3, wants to determine the optimal production schedule the maximizes the total profit. Product A has to be processed by machines M1, M2, and M3, product B requires M1 and M3, while product requires M1 and M2. The unit profits on the three products are $5,54 and 56, respectively. The following linear program is formulated to determine the optimal product mic Maximize S. Z-5x -...
Redner, Inc. produces three products. Data concerning the selling prices and unit costs of the three products appear below: Product J K L Selling price $ 95 $ 75 $ 105 Variable costs $ 80 $ 70 $ 85 Fixed costs 25 4 22 Granding machine time (minutes) 15 4 5 Fixed costs are applied to the products on the basis of direct labor hours. Demand for the three products exceeds the company's productive capacity. The grinding machine is the...
Redner, Inc. produces three products. Data concerning the selling prices and unit costs of the three products appear below: Product J K L Selling price $ 75 $ 55 $ 85 Variable costs $ 40 $ 30 $ 45 Fixed costs 15 8 12 Granding machine time (minutes) 10 5 5 Fixed costs are applied to the products on the basis of direct labor hours. Demand for the three products exceeds the company's productive capacity. The grinding machine is the...
Benny's Arcade has five video game machines. The average time between machine failures is 50 hours. Jimmy, the maintenance engineer, can repair a machine in 15 hours on average.The machines have an exponential failure distribution, and Jimmy has an exponential service-time distribution. a. Jimmy's utilization is . (Enter your response rounded to three decimal places.) b. The average number of machines out of service, that is, waiting to be repaired or being repaired is nothing machines. (Enter your response rounded...
Comfy Fit Company manufactures two types of university sweatshirts, the Swoop and the Rufus, with unit contribution margins of $5 and $15, respectively. Regardless of type, each sweatshirt must be fed through a stitching machine to affix the appropriate university logo. The firm leases seven machines that each provides 1,000 hours of machine time per year. Each Swoop sweatshirt requires 6 minutes of machine time, and each Rufus sweatshirt requires 20 minutes of machine time. Assume that a maximum of...