A construction crew needs to pave a road that is 201 miles long. The crew paves...
Archer Contracting repaved 50 miles of two-lane county roadway with a crew of six employees. This crew worked 8 days and used $7000 worth of paving material. Nearby, Bronson Contracting repaved 35 miles of four-lane interstate roadway working 10 days with a crew of five employees using $9000 of paving material. Both Archer Contracting and Bronson Contracting rented the same paving equipment to complete their respective assignments, costing each $1500 a day, and labor cost per employee is $160 a...
with 17 and 18
ALGEBRA1-Alternate Exam 12-continued Student's Name Student Number On a 1287 mile long road trip in windy conditions, a family calculates their fuel economy to be 18 miles per gallon over the 2 days it takes to reach their destination. On their 2-day return trip, with a similar wind at their backs, their calculations show a fuel economy of 26 miles per gallon. 17. Calculate the expected fuel economy of their vehicle in ideal (non-windy) conditions ()...
Questions 21-23 10 points each-30 points total 21. Draw a bar chart for the following construction data Activity Preceding Activity Duration D, E 22. What is the critical path for the above construction data 23. A contractor has been awarded a project covering 14.35 miles of highway construction approximately 250 feet wide, with an average pavement width of 23 feet. The project contracted to be completed in 32 878,545 per mile of road way, profit is 9 % of the...
A company produces crushed limestone for the road construction industry. The rock is crushed in a quarry and then sent by trucks to the construction site. Each truck must be weighed before exiting the quarry. There is one weight scale. The trucks arrive at the weigh station and, if necessary, line up to be weighed on a first come, first-served (FIFO) basis. Truck arrivals are Poisson distributed with an average of 12.5 trucks per hour. The time needed to weigh...
1. Develop a network drawing for Hill Construction and
determine
the critical path. How long is the project expected to take?
2. What is the probability of finishing in 270 days?
3. If it is necessary to crash to 250 or 240 days, how would Hill
do
so, and at what costs? As noted in the case, assume that
optimistic
time estimates can be used as crash times.
Southwestern University: (A)* Southwestern University (SWU), a large state college in Stephenville,...
1. Convert 60 miles per hour into meters per second. 2. A student is trying to remember some formulas from geometry. In what follows, assume A is area, V is volume, and all other variables are lengths. Determine which formulas are dimensionally consistent. (c) V-0.5bh, (e) V nd 3. The length of a warchouse is measured to be 95.00m. The height of the roof is measured to be 1,350.00cm. The width is measured to be 0.0015km. Calculate the volume of...
12. A slab on grade measures 120 long x 60" wide x 2' 6" thick. What is the cost to form the slab if formwork costs S1 per square foot of contact area? A. $72 B.S90 C.S162 D.S180 13. A place concrete' activity requires the placement of 2,080 cubic yards. If the individual production rate is 2 cubic yards per workhour per person, with a 10-person crew and 8-hour workday, how many days are needed to complete this activity? A....
the light triangle shown in the figure Round lengths to one decimal place and express anges to the wth of a degree 18) 33 in A - 70.0 A) b12 in B 200 C35 in ob-31 20.0*. c-35 in B) b-01 200, 33 in D) 3.1 in B200.645 in 19) b=130 -150 A) A-158, B-742, a -412 A-73.6.3 -16.4. B) A-742 B-15.. D) A-736, B-16.4", 08 1.2 2011 Solve the problem 201 A radio transmission tower is 190 feet tall....
please check my homework, and let me know it right or wrong.
Thank you!
Chapter 4B: Schedule C Exercise 1. Which of the following does not count as self-employment income? a. Payment received for a taxpayer's coin collection b. $780 reported in box 7 of 1099-MISC c. Cash paid for helping neighbors clean their gutters d A and 2. True or false: An individual only needs to report income recorded on a tax form. If they received cash payments unreported...
The XYZ Company needs you to write a program that will allow them to enter the weekly sales for a salesperson and then the program will calculate things such as most sales (and what day on which they happened), least sales (and day on which they happened), total sales, and daily average. The program will need to do the following: • Validate the user input to ensure that it is not less than 0.0 (0.0 will be acceptable if there...