Question

Search Optimize the operation of a Power Plant to minimize costs. The plant must produce 1000 MWh of electricity while emitting no more than 2500 g of sulfur (to prevent acid rain). Regular coal or low sulfur coal can be used. Regular coal costs $4 coal can be burned with the scrubber oft, in which case regular coal results in the emission of 12 g/MWh of sulfur and low sulfur coal results in 4 g/MWh. NOTE: none of the amounts or costs used are meant to reflect actual conditions at a power plant. With the additional data given below, use the simplex algorithm to solve the problem (e.gusing the Excel Solver Add in). Given produced by the plant. A scrubber can be used to clean stack gasses, but is used with regular coal only Both regular and low sulfur The cost of operating the scrubber is: The fractional reduction in sulfur emissions with the scrubber on (regular coal only) is: RF 0.925 (Unitless) The cost of low sulfur coal is CL-1.4$ MWh Question(s) 1. What is the cost of producing power using regular coal with the scrubber ON? Figures 2) 2. How many grams of sulfur are released per MWh of power produced when regular coal is burned with the scrubbe 3. How many decision variables are used in the objective functioni? 4. How many constraint equation are used in the linear programming model (NOT including non-negathvy)? 5. In the optimal solution, how much energy is produced using regular coal with the scrubber 6. in the optimal solution, how much energy is produced using low sulfur coal? 7. In the optimal solution, how much energy is produced using regular coal with the scrubber ON? 8. What is the minimum cost of operating the power plant?
0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
Search Optimize the operation of a Power Plant to minimize costs. The plant must produce 1000...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 1. Steam power plant (a) The boiler of a power plant operates at a maximum temperature...

    1. Steam power plant (a) The boiler of a power plant operates at a maximum temperature of 750oC. The condenser of the power plant draws in cooling water at 20oC. What is the theoretical maximum efficiency of the plant? (b) Now suppose that a real power plant is built to have an efficiency that is 80% of the theoretical efficiency. The power plant needs to generate 1GW (giga-watt) of power. How much energy (per second) needs to be supplied by...

  • Please answer Questions e-f-g-h: (a) The boiler of a power plant operates at a maximum temperature...

    Please answer Questions e-f-g-h: (a) The boiler of a power plant operates at a maximum temperature of 750oC. The condenser of the power plant draws in cooling water at 20oC. What is the theoretical maximum efficiency of the plant? (b) Now suppose that a real power plant is built to have an efficiency that is 80% of the theoretical efficiency. The power plant needs to generate 1GW (giga-watt) of power. How much energy (per second) needs to be supplied by...

  • in 1986 an electrical power plant in Taylorsville, Georgia, burned 8376726 tons of coal, a national...

    in 1986 an electrical power plant in Taylorsville, Georgia, burned 8376726 tons of coal, a national record at that time. Part A Assuminf that the coal was 80% carbon and 2.9% sulfur and that combustion was complete, calculatw the number of tons of carbon dioxide produced by the plant during the year. CO2= tons Part B Assuming that the coal was 80% carbon and 2.9% sulfur and that combustion was complete, calculate the number of tons of sulfur dioxide produced...

  • ethanol is 190 g E a 3) A coal-fired power plant is designed to produce 12...

    ethanol is 190 g E a 3) A coal-fired power plant is designed to produce 12 MW of electricity. (This is a small unit that might be used to power a pulp-and-paper mill or other relatively energy intensive factory.) The coal is used to heat steam to a temperature of 560 C. After running through the turbines; the steam has been condensed and the liquid water cooled to 38 °C. (a) Calculate the minimum amount of heat that must be...

  • An environmental engineer is sampling the stack gas produced by a coal-burning power plant. The stack...

    An environmental engineer is sampling the stack gas produced by a coal-burning power plant. The stack gas (a mixture of carbon dioxide, sulfur dioxide, and water) is pumped into a 20.0 liter cylinder at a pressure of 1.20 atm, and a temperature of 325 K. It is determined that the sample contains 0.315 mol of C02 and 0.494 mol of H20 a) How many moles of sulfur dioxide were present in the sample? b) What is the partial pressure (in...

  • A nuclear power plant has an electrical power output of 1000 MW and operates with an...

    A nuclear power plant has an electrical power output of 1000 MW and operates with an efficiency of 33%. If the excess energy is carried away from the plant by a river with a flow rate of 1.4e6 kg/s, what is the rise in temperature of the flowing water? Hint: Consider the flow of energy during one second. During that second, the power plant does 1000 MJ of work ?. Knowing the work and the efficiency, you can calculate the...

  • Exotic materials in a large power plant A new state-of-the-art coal-fired power plant was to be...

    Exotic materials in a large power plant A new state-of-the-art coal-fired power plant was to be built at a newly developed site. There, it would be connected to plants that would also provide biological waste as fuel, in return for high-pressure steam and energy.The power plant reaches high efficiencies, filters its exhaust gas and particles, and is able to compress and back CO2 into subterranean reservoirs of old gas fields. The project showcases the latest technology concerning coal-fired plants, including...

  • 4. CIP has three electric power plants that supply the power needs of four cities. Each power plant can supply the following numbers of kilowatt-hours (kwh) of electricity: plant 1, 35 million; pl...

    4. CIP has three electric power plants that supply the power needs of four cities. Each power plant can supply the following numbers of kilowatt-hours (kwh) of electricity: plant 1, 35 million; plant 2, 50 million; plant 3, 40 million. The peak power demands in these cities, which occur at the same time (2:00 P.M.), are as follows (in kwh): city A, 20 million; city B, 20 million; city C, 30 million; city D, 30 million. The costs of sending...

  • Q.8: An electrical power plant operates on the basis of thermal energy generated in a pressurized...

    Q.8: An electrical power plant operates on the basis of thermal energy generated in a pressurized water reactor. The electrical power output of the plant is 1 GW, and its efficiency is 30% (a) Find the total power generated by the reactor. (b) How much power is discharged to the environment as waste heat? (c) Calculate the rate of fission events in the reactor core (Let the energy produced per fission event be 200MeV) (d) Calculate the mass of 235U...

  • In the first several questions we will walk through the steps of a typical grams to moles--> moles to moles -...

    In the first several questions we will walk through the steps of a typical grams to moles--> moles to moles --> moles to grams calculation. Here is the overall question. We will estimate answers to each subsequent step, but by the time you've done these questions you should have a good sense of how to do these problems. How much SO2 in metric tonnes is produced by one day of coal burning at the Rawhide Power Plant north of Wellington,...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT