Question

1.When applied to service, lean: a. Is a very new idea b. Can be very effective...

1.When applied to service, lean:

  • a. Is a very new idea
  • b. Can be very effective
  • c. Does not use TPS
  • d. All of the above are true
  • e. None of the above are true

2.Because lean is so strict with inventory management:

  • a. A very fast rework process is needed
  • b. Quality needs to be perfect or near perfect coming into production
  • c. Pre-production inspection is essential
  • d. All of the above are true
  • e. Only b and c are true

3. In a pull system:

  • a. Demand is pulled through the system
  • b. There are high inventories in anticipation of customer demand
  • c. Production is pulled though the system to meet customer demand
  • d. Batches are sized based on Kaizen
  • e. All of the above

4. You should stick to using the proper symbols for value stream mapping to improve your lean results.

True or False

0 0
Add a comment Improve this question Transcribed image text
Answer #1

1) B

The lean system focuses on minimizing waste in the system and can be effective in service industry also

2) E

The aim should be to have zero rework and perfect quality item to minimize waste

3) E

In Pull system, there are high inventories maintained to meet customer demand as and when required. Moreover, demand is pulled through system

4) True

The symbols are generic and help to easily understand the flow

Add a comment
Know the answer?
Add Answer to:
1.When applied to service, lean: a. Is a very new idea b. Can be very effective...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Hello, could you help me solve this question, please? Thank you very much! Question: (a) A...

    Hello, could you help me solve this question, please? Thank you very much! Question: (a) A project has EIGHT (8) activities listed in the following table: Activity Immediate Predecessor (s) Time (Weeks) Activity Immediate Predecessor (s) Time (Weeks) A - 2 E C 3 B A 5 F C 7 C A 3 G D, E 2 D B 4 H F 3 (i) Use the GRAPH PAPER provided to construct a Gantt chart for the above project. [Note: You...

  • rue False 6. Going lean if done properly will increase quality defects. True False 7. Price...

    rue False 6. Going lean if done properly will increase quality defects. True False 7. Price is not a factor in the basic EOQ formula. True False ate ue Fals 13. A process that exhibits random variability would be judged to be out of control. True False 14. A p-chart is used to monitor the fraction of defectives in the output of a process True False 15. Run tests are useful in helping to identify nonrandom variations in a process....

  • 2. Cost information is very useful to: a. Manufacturing organizations b. Service organizations c. Not-for-profit organization...

    2. Cost information is very useful to: a. Manufacturing organizations b. Service organizations c. Not-for-profit organization d. All of the above e. None of the above

  • 1,2,3,4,5,6 1. Most inventory models are based on A) profit maximization. B) optimum influence on demand....

    1,2,3,4,5,6 1. Most inventory models are based on A) profit maximization. B) optimum influence on demand. C) minimizing setup times. D) cost minimization. E) minimizing lead time. 2. Lean operations are known for their: a. employee development. b. supplier education. c. supplier partnerships. d. challenging jobs. e. All of the above are attributes of lean operations. 3. A graphic technique for defining the relationship between customer desires and product/service characteristics is: a. Product Lifecycle Management graph b. the moment of...

  • I have very weak taste buds; I cannot detect small differences in sweetness. So I cannot...

    I have very weak taste buds; I cannot detect small differences in sweetness. So I cannot tell the difference between one spoon of sugar and one and half spoons of sugar in my coffee, and hence I am indifferent between the two. However, I can detect the difference in sweetness between one and two spoons of sugar and I prefer my coffee less sweet. Which of the following statements about my preferences is true: a) My preference relation is not...

  • 1. Smallest cycle (iteration) in Agile project management is called a. Prince b. Lean c. Sprint...

    1. Smallest cycle (iteration) in Agile project management is called a. Prince b. Lean c. Sprint d. Waterfall 2. The most stable and dynamic PM methodologies are: (choose as many applies) a. Prince2 b. Kanban c. PMBOK d. Scrum 3. Which of the following methodologies are similar to each other? Make two sets. a. Prince2 b. Scrum 1 ______________ & ________________ c. Lean d. Kanban 2 ______________ & _________________ e. PMBOK f. Agile 4. PMBOK is a universal standard of...

  • 1) Which of the following does not result from the effective use of group technology? a)reduced...

    1) Which of the following does not result from the effective use of group technology? a)reduced tooling setup time b)better electronic communication between team members c)reduced raw materials and purchases d)simplified production planning and control e)improved layout, routing, and machine loading 2) Which of the following is true about business strategies? a)An organization should stick with its strategy for the life of the business. b)All firms within an industry will adopt the same strategy. c)Well defined missions make strategy development...

  • A healthcare system that offers free flu shots to all insured patients is meeting which strategic...

    A healthcare system that offers free flu shots to all insured patients is meeting which strategic quality priority? a. Safety b. Patient and family engagement c. Coordination of care d. Effective prevention and treatment practices e. Use of best practices A clinic that utilizes nurse navigators to ensure patients are scheduled in a timely fashion for necessary appointments, understand their medications, and monitor their symptoms is succeeding at which strategic quality priority? a. Safety b. Patient and family engagement c....

  • 1. Cycle counting: a) means that we count all articles after a specified time period b)...

    1. Cycle counting: a) means that we count all articles after a specified time period b) leads us to count A items more frequent then B items c) require all A items to be counted the same day d) is a legal requirement 2. Extra units in inventory to help reduce stockouts are called: a) reorder point. b) safety stock. c) just-in-time inventory. d) all of the above. 3. The EOQ model is a) not very useful in practice since...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT