Exercise 2: (7marks) um voltage three-phase line delivering St5MVA with cosp = 0.928 ogging. Teeds a...
A balanced three-phase source with a 208 V rms (line-to-line) is delivering power to a balanced Y-connected load with phase impedance Z1 = 4 + j 3 Ohms in parallel with a balanced delta-connected load with phase impedance Z2 = 7.5 + j 6 Ohms. Calculate the active (real) and reactive (imaginary) powers delivered by the source. Draw the power triangle. What is the power factor of the combined load?
A three phase line has an Impedance of 0.4+j2.7 Ω per phase. The line feeds two balanced three phase loads that are connected in parallel. The first load is absorbing 560.1kVA @ PF=0.707 lagging and the second load absorbs 132kW @ PF=1. The line-to-line voltage at the load side is 3810.5/_30° V. Determine: a) The magnitude of the line voltage at the source side b) Total active & reactive power loss in the line c) Active and reactive power at...
The impedance of a three-phase line is 0.3 + j 2.4 per phase. The line feeds two balanced three- phase loads connected in parallel. The first load takes 600 kVA at 0.7 p.f. lagging. The second takes 150 kW at unity power factor. The line to line voltage at the load end of the line is 3810.5 V. Find a) The magnitude of the line voltage at the source end of the line. b) The total active and reactive power...
Problem 3 Two parallel 3-phase loads are supplied from a 3-phase source with line-line voltage of 415.6922 V rms. The data of their power consumption are as follows. Load 1: 15 kVA at power factor of 0.75 lagging Load 2: 9 kW at power factor 0.82 lagging 1) 2) 3) 4) 5) Determine the complex power consumed by Load 1 Find the complex power consumed by Load 2 Calculate the total complex power consumed by the two loads. Determine the...
The following three-phase, balanced loads are connected across a three-phase, Y-connected 60 Hz source with a line-to-line voltage of 480 V. The loads are described below: • Load 1: ∆-connected, total three-phase apparent power is 30 kVA at 0.95 power factor lagging. • Load 2: ∆-connected, total three-phase active power is 20 kW at 0.7 power factor lagging. • Load 3: Y-connected, phase current is 30 A, and power factor is 0.9 pf leading. (a) Calculate the total complex power...
A 3-phase Y-connected motor is connected to a three phase Y-connected source with 440V line voltage. It draws a line current of 5A from the source. If the power factor of the motor is 0.8, calculate Active power and Reactive power absorbed by the load Total Apparent power
The per-phase impedance of a short transmission line is (0.3+j0.4) Ω. The sending end line-to-line voltage is 3300V, and the load at the receiving end is 300 kiloWatts per phase at 0.8 power factor lagging. Calculate: (a) The receiving end voltage (b) The line current (c) The sending end power factor (d) The power loss.
I. A balanced three-phase positive sequence wye-connected 60Hz source voltage has line-neutral voltage of V, 1000 V. It is connected to a three- phase wye connected load whose impedance is z 50+j37.7 2 a. Find line currents ia ib, ic and line-line voltages Vab, Vbo Vac b. Find the total complex power delivered to the load. c. Find delta-connected capacitor bank needed to bring the PF to 0.95 (lagging) of system. d. Re-calculate currents la, ib, io with Case c....
I. A balanced three-phase positive sequence wye-connected 60Hz source voltage has line-neutral voltage of V, 1000 V. It is connected to a three- phase wye connected load whose impedance is z 50+j37.7 2 a. Find line currents ia ib, ic and line-line voltages Vab, Vbo Vac b. Find the total complex power delivered to the load. c. Find delta-connected capacitor bank needed to bring the PF to 0.95 (lagging) of system. d. Re-calculate currents la, ib, io with Case c....
1. A renewable energy system delivers 120 kW of three-phase power at 400 V (line-line) to a load with a 0.9 lagging power factor. If each power line has a resistance of R = 0.03 Ω and reactance of X = 0.04 Ω, determine the sending end voltage (line-line) of the three-phase power line connected to the renewable energy system for supplying power to the load. 2. A network service operator found that the voltage rise in a network due...