A dam is put on a river that has a unblocked flow rate of 2 meter/second. The new dam then blocks the water and forces it through a generation system. If 1,000,000 cubic meters of water flowed each hour in the river before the dam went in, how much electric power ( Energy / time) can be expected to be grabbed from this water once the dam is in place? Use a 50% effective conversion of the kinetic energy of the water flow to electricity.
The kinetic energy is given by K.E. = (1/2)mv2
K.E. = (1/2)*(1000000*1000Kg/hour)*(2m/s)2
K.E. = 2 x 109 J/hour
As electricity produced is 50% of kinetic energy, Electric Energy = 0.5*K.E.
Hence, Electric Energy produced = 109 J/hour
I hope i was able to answer your question. If you need anymore explanation, please ask in comments. I would be happy to help.
Please rate the solution if you are satisfied with the solution.
A dam is put on a river that has a unblocked flow rate of 2 meter/second....
a) The following figure shows a water dam built for a hydroelectric power project running constantly round the year. During a dry season, it acts as water reservoir of constant height 80 m. Meanwhile rainy season, water flow of 3 m/s is added to the system. (Water density 10x10 kg/m' and volume flow, V = 45x10 m/s respectively and the gravitational acceleration is about 9.8 kg/m for both seasons). Evaluate the followings: Ravet afsec RE Figure 2: Water flow utilization...
water 248 m 945 ml 2 Water Pipe GENERATOR TURBINE 1) A dam in somewhere with a height of 248 m, is one of the tallest dam in the world. Water flows with a volumetric flow rate of 65 m'ls to a turbine, where electric power is generated. The total irreversible head los in the piping system from point 1 to point 2 (excluding the turbine unit) is determined to be 95 m. The pressure difference due to elevation cannot...
Summary should briefly analyze the central problems and issues of the case and provide some analysis and suggestions. Thank you. Lean Initiatives and Growth at Orlando Metering Company It was late August 2002 and Ed Cucinelli, vice president of Orlando Metering Company (OMC), sat in his office on a late Saturday morning. He had come in to prepare for some strategic planning meetings that were scheduled for the upcoming week. As he noticed the uncommon silence in the building, Ed...
I have this case study to solve. i want to ask which
type of case study in this like problem, evaluation or decision? if
its decision then what are the criterias and all?
Stardust Petroleum Sendirian Berhad: how to inculcate the pro-active safety culture? Farzana Quoquab, Nomahaza Mahadi, Taram Satiraksa Wan Abdullah and Jihad Mohammad Coming together is a beginning; keeping together is progress; working together is success. - Henry Ford The beginning Stardust was established in 2013 as a...