Q2     Afro Maintenance is a small aircraft wing maintenance facility located in Seattle, Washington. They...

Q2

    Afro Maintenance is a small aircraft wing maintenance facility located in Seattle, Washington. They decides to improve material flow in the facility, using the load-distance method.

    The current process layout of facility is shown in below. The distance between adjacent departments have 10 feet (ex: distance between Entrance office and Receiving room is 10 feet), and distance between diagonal departments are 20 feet (ex: Entrance and Assembly room is 20 feet). Also, nonadjacent departments, such as the Entrance and Parts Room are 20 feet apart, and nonadjacent rooms, such as entrance and Inspection Room are 30 feet apart.

Afro Maintenance Process Layout

Entrance Office, 1

Receiving Room, 2

Parts Room, 3

Metallurgy Room, 4

10

Breakdown Room, 5

Assembly Room, 6

Inspection Room, 7

Test Room, 8

10 feet

10

10

Number of Material movements (loads) between departments in one month.

1

2

3

4

5

6

7

8

100

100

0

0

0

0

0

1 Entrance

0

50

20

0

0

0

2 Receiving Room

30

30

0

0

0

3 Parts Room

20

0

0

20

4 Metallurgy Room

20

0

10

5 Breakdown Room

30

0

6 Assembly Room

0

7 Inspection Room

8 Test Room

Given the information, compute the total load-distance score in one month.

Node (Route)

Distance

Load

Load-Distance Score (D * L)

1-2

10

100

1,000

1-3

20

2-4

2-5

20

3-4

3-5

4-5

4-8

5-6

5-8

6-7

Total L-D Score

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
Q2     Afro Maintenance is a small aircraft wing maintenance facility located in Seattle, Washington. They...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 4. In an assembly plant, material handling between departments is performed using a uni-directional closed-loop conveyor....

    4. In an assembly plant, material handling between departments is performed using a uni-directional closed-loop conveyor. The figure below shows the layout for the modular facility, which consists of three equal-sized assembly modules (A, B, and D), one administrative module (C), and one warehouse module (E). Pick up/Drop off (P/D) points for each module are also shown in the figure. P/D#3 P/D#2 Warehouse module P/D#1 Conveyor flow P/D#4 P/D#5 The distance between P/D points and the number of pallet loads...

  • Q2. (50 pts) The architect for Ocean World is beginning to formulate plans for the development of property outside Waco...

    Q2. (50 pts) The architect for Ocean World is beginning to formulate plans for the development of property outside Waco, Texas, for a second marine theme park after the success of its Neptune’s Realm on the West Coast. Because of the hot and humid Texas weather during the summer months, ways to minimize the visitors’ total travel distance between attractions are being considered. They are planning to build six major attractions similar to Neptune’s Realm: A – Killer Whale, B...

  • Roy Creasey​ Enterprises, a machine​ shop, is planning to move to a​ new, larger location. The new building will be 60 f...

    Roy Creasey​ Enterprises, a machine​ shop, is planning to move to a​ new, larger location. The new building will be 60 feet long by 40 feet wide. Creasey envisions the building as having six distinct production​ areas, roughly equal in size. He feels strongly about safety and intends to have marked pathways throughout the building to facilitate the movement of people and materials. See the following building schematic. Room 1Room 2 Room 3 Room 4 Room 5 Room 6 His...

  • Roy Creasey Enterprises, a machine shop, is planning to move to a new, larger location. The...

    Roy Creasey Enterprises, a machine shop, is planning to move to a new, larger location. The new building will be 60 feet long by 40 feet wide. Creasey envisions the building as having six distinct production areas, roughly equal in size. He feels strongly about safety and intends to have marked pathways throughout the building to facilitate the movement of people and materials. See the following building schematic. Room Room Room Room Room Room 5 His foreman has completed a...

  • on the work are shown in the buty nithe number of loads of material that have...

    on the work are shown in the buty nithe number of loads of material that have moved from one process to another in the current building. This information is contained in the flow matrix an the left below. Finally, Cransay alsa davnoped a matrix ha indicate distances Roy Cressay Enterprises, a machine shop, is planning to move to a new larger location. The new building wil be 60 feet long by 40 feet wide. Creasey envisions the building as having...

  • The owners of Speedy Logistics are considering where to locate their new facility. They have narrowed...

    The owners of Speedy Logistics are considering where to locate their new facility. They have narrowed down their search to two locations and have decided to use a factor rating method to make their decision. They have listed the factors they consider important and assigned a factor score to each location based on the five-point scale shown in Table 4. Table 4 Factor Factor weight location 1 location2 Proximity to airport 40 5 3 Proximity to road access 30 4...

  • Homework i Saved Help Save & Exit Check The Sendai Co., Ltd., of Japan has budgeted...

    Homework i Saved Help Save & Exit Check The Sendai Co., Ltd., of Japan has budgeted costs in its various departments as follows for the coming year. Factory Administration Custodial Services Personnel Maintenance Machining-overhead Assembly-overhead Total cost $ 270, eee 68,762 28,840 45,200 376,388 175,900 $ 965, eee The company allocates service department costs to other departments in the order listed below. Department Factory Administration Custodial Services Personnel Maintenance Machining Assembly Square Total Feet of Direct Number of Labor- Space...

  • Summary: A car part manufacturing company currently produce a suspension assembly for Toyota Motor Corporation. Figure...

    Summary: A car part manufacturing company currently produce a suspension assembly for Toyota Motor Corporation. Figure 1 shows the breakdown structure of the suspension assembly and Figure 2 shows the final assembly and how to fit into a car. Table 1 shows the name of components, part numbers and number of components in each suspension assembly. Figure 1. Breakdown structure of Suspension Assembly Figure 2. Suspension Assembly Number in Figure 1 Part number Part name Amount per assembly 1 PA-T15-001...

  • Help Save Saw Homework Asas Inc. is a toy bicycle manufacturing company producing a five-inch small...

    Help Save Saw Homework Asas Inc. is a toy bicycle manufacturing company producing a five-inch small version of the bike that Lance Armstrong rode to win his first Tour de France. The assembly line at Atlas Inc. consists of seven workstations, each performing a single step. Stations and processing times are summarized here: • Step 1 (30 sec.) The plastic tube for the frame is cut to size. . Step 2 125 sec.) The tube is put together Step 3...

  • I need help with question 6 and 8, please. Thanks so much! :) wa 3 the...

    I need help with question 6 and 8, please. Thanks so much! :) wa 3 the 5. The combined weight of a motorboat and its load is 480 egu pounds. After starting from rest at t= 0, the motor exerts a dow constant force of 30 pounds on the boat in its linear direction of of s motion. If the total resistance (in pounds) that the boat encounters (bu as it moves along its path is numerically equal to 3v12,...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT