Question

A red train traveling at 72km/h and a green train traveling at 144km/h are headed towards...

A red train traveling at 72km/h and a green train traveling at 144km/h are headed towards each other along a straight, level track. When they are 950m apart, each engineer sees the other's train and applies the breaks. The breaks slow each train at the rate of 1.0m/s^2. is there a collision? if so, give the speed of the red train and the speed of the green train at impact, respectively. If not, give the separation between the trains when they stop.

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
A red train traveling at 72km/h and a green train traveling at 144km/h are headed towards...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • P13 A passenger train is traveling at 29 m/s when the engineer sees a freight train...

    P13 A passenger train is traveling at 29 m/s when the engineer sees a freight train 360 m ahead, traveling in the same direction on the same track. The freight train is moving at a speed of 6.0 m/s. The reaction time of the engineer is 0.40s What is the distance between the trains when the engineer applies the brakes? What is the minimum (constant) rate at which the passenger train must lose speed if a collision is to be...

  • The engineer of a passenger train traveling at 25.0m/s sights a freight train whose caboose is...

    The engineer of a passenger train traveling at 25.0m/s sights a freight train whose caboose is 200m ahead on the same track. The freight train is traveling at 15.0 m/sin the same direction as the passenger train. The engineer of the passenger train immediatly applies the brakes causing a constant acceleration of .100m/s^2 in adirection opposite to the trains velocity, while the freight train continues with constant speed. will there be a collision?

  • When a high-speed passenger train traveling at vP = 158 km/h rounds a bend, the engineer...

    When a high-speed passenger train traveling at vP = 158 km/h rounds a bend, the engineer is shocked to see that a locomotive has improperly entered onto the track from a siding and is a distance D = 692 m ahead (see the figure). The locomotive is moving at vL = 30 km/h. The engineer of the passenger train immediately applies the brakes. Assume that an x axis extends in the direction of motion. What must be the constant acceleration...

  • As two trains move along a track, their conductors suddenly notice that they are headed toward...

    As two trains move along a track, their conductors suddenly notice that they are headed toward each other. The figure gives their velocities v as a function of time t as the conductors slow the trains. The figure's vertical scaling is set by vs = 37 m/s.The slowing process begins when the trains are 168.00 m apart. What is their separation when both trains have stopped? 0 t (s) (8c2p39) As two trains move along a track, their conductors suddenly...

  • As two trains move along a track, their conductors suddenly notice that they are headed toward...

    As two trains move along a track, their conductors suddenly notice that they are headed toward each other. The figure gives their velocities v as a function of time t as the conductors slow the trains. The figure's vertical scaling is set by vs = 23.0 m/s. The slowing processes begin when the trains are 122 m apart. What is their separation when both trains have stopped? 6 4 2 0

  • 6. An airplane has a speed of 120 km/h degrees east of north when a wind start 2: Long Answer (15...

    6. An airplane has a speed of 120 km/h degrees east of north when a wind start 2: Long Answer (15 points) Two trains, both traveling at 30 m/s, are headed toward each other on the same track. When they are 4.0 km apart they see each other and slam on the brakes a) If their decelerations are constant and equal, what must be the magnitudes of these accelerations if the trains are to barely avoid collision? b) How many...

  • As two trains move along a track, their conductors suddenly notice that they are headed toward...

    As two trains move along a track, their conductors suddenly notice that they are headed toward each other. The figure gives their velocities v as functions of time t as the conductors slow the trains. The figure's vertical scaling is set by Vs 44.0 m/s. The slowing processes begin when the trains are 220 m apart. What is their separation when both trains have stopped? 0 240() Number 138 UnitsT m

  • As two trains move along a track, their conductors suddenly notice that they are headed toward...

    As two trains move along a track, their conductors suddenly notice that they are headed toward each other. The figure gives their velocities v as functions of time t as the conductors slow the trains. The figure's vertical scaling is set by vs 48.0 m/s. The slowing processes begin when the trains are 240 m apart. What is their separation when both trains have stopped? t (s) Number TT96 Units m

  • Please show all work! 1. A train is traveling down a straight track at 20 m/s...

    Please show all work! 1. A train is traveling down a straight track at 20 m/s when the engineer applies the brakes, resulting in an acceleration of 21.0 m/s2 as long as the train is in motion. How far does the train move during a 40-s time interval starting at the instant the brakes are applied? 2.A balli thrown vertically upward with a speed of 25.0 m/s.(o) How high does it rise? (b) How long does it take to reach...

  • An automobile is traveling on a long, straight highway at a steady 75.0 mi/h when the...

    An automobile is traveling on a long, straight highway at a steady 75.0 mi/h when the driver sees a wreck 190 m ahead. At that instant, she applies the brakes (ignore reaction time). Between her and the wreck are two different surfaces. First there is 100 m of ice, where the deceleration is only 1.30 m/s2 . From then on, it is dry concrete, where the deceleration is a more normal 8.00 m/s2 . a). What was the car’s speed...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT