The cost of upgrading a section of Grand Loop Road in Yellowstone National Park is $1.7 million. Resurfacing and other maintenance are expected to cost $350,000 every 3 years. What is the capitalized cost of the road at an interest rate of 6% per year? Use manual equation and show steps
P = 1700000
i = 6% = 0.06
n = 3
Maintenance cost = 350000
Capitalized cost = -1700000-350000*(A/F,6%,3)/0.06
Use the following formula instead of A/F =
| i/((1 + i)^n-1) |
= -1700000-350000*0.3141/0.06 = -3532250
The cost of upgrading a section of Grand Loop Road in Yellowstone National Park is $1.7...
The cost of upgrading a section of Grand Loop Road in Yellowstone National Park is $2 million. Resurfacing and other maintenance are expected to cost $380,000 every 8 years. What is the capitalized cost of the road at an interest rate of 11% per year? The capitalized cost is determined to be $ .?
Chattanooga is constructing a park at in investment of $1,000,000. Annual maintenance cost are expected to be $10,000 for the first 30 years and $20,000 thereafter for an indefinite period of time. With an interest rate of 6%, what is the capitalized cost of this project? Ans. $xxxxxxx
Solve it by using Compounded Interest Factors
Tables
A local planning commission has estimated the first cost of a new city- owened amusement park to be $35,000. They expect to improve the park by adding new rides every year for the next 5 years at a cost of S6000 per year. Annual operating costs are expected to be $12,000 the first year; these will increase by $2000 per year until year 5. After that time, the operating expenses will remain...
20. An existing public park serving 1.8 Million visitor/year is to be improved. Initial cost is SR 2.25 Million and the annual operating and maintenance cost starts with SR 0.145 Million during the first year and increases 3%/year thereafter. The planning horizon is 20 years, the salvage value is 32% of the initial cost, and the interest rate is 12%. The minimum additional benefits/visit that will justify the facility improvement is closest to: a) SR 0.18 b) SR 0.30 c)...
cost $150,000 each. If the trust fund earns 8% inter- est, what is the developer's capitalized cost? 5.54 Use capitalized cost to determine which type of road surface is preferred on a particular section of highway. Use 12% interest rate. as onc (co 20 cap Initial cost Annual maintenance Periodic resurfacing Resurfacing interval lini is $32 $500,000 35,000 350,000 10 years $700,000 25,000 450,000 15 years will estin сара italiz 5-55 A new bridge project is being evaluated at i...
please answer #2 The Stratton Township Park The Stratton Township Park is located on a piece of property that contains two golf courses, a swimming pool, and 800 acres of woods and open spaces. Three years ago, the Stratton Parks Department (Stratton) carved out miles of trails to allow visitors to hike the property and enjoy nature. To make that experience more enjoyable for visitors and available to school groups, Stratton decided to offer guided tours that have proven popular....
please answer #5 The Stratton Township Park The Stratton Township Park is located on a piece of property that contains two golf courses, a swimming pool, and 800 acres of woods and open spaces. Three years ago, the Stratton Parks Department (Stratton) carved out miles of trails to allow visitors to hike the property and enjoy nature. To make that experience more enjoyable for visitors and available to school groups, Stratton decided to offer guided tours that have proven popular....
The answer is shown in the
picture, i want to know how they got it, please show all your work
and if you are using excel please show your formulas, Thank You and
good luck.
Toll lanes on a section of the 1-40 freeway are being considered in order to reduce traffic congestion and travel times Since this is a government project, the B-C ratio method must be applied in the evaluation. Construction costs of the project are estimated to...
Investment Evaluation Analysis Widget Company is considering upgrading its manufacturing equipment. The Vice-President of Production has identified three possible actions Widget could take to accomplish the upgrade, though none is required. One option would upgrade their current equipment and the other two options would replace the existing equipment with purchases of new equipment. The review committee has asked you to review each of the options to identify relevant cost data and to prepare a schedule comparing the three options to...