The Rover 6 is a new custom-designed sports car. An analysis of the task of building the Rover 6 reveals the following list.
This exercise contains only parts b, c, and d.
b) The activities on the critical path are (1)
The total project completion time for custom designed Rover 6 car is
(Round your response to one decimal place.)
c) For Rover 6 to be completed 2 days earlier, one should (2)
d) For reducing the project duration, resources from (3) activities should be borrowed to speed activities on the speed activities on the (4) path.
|
Job Letter |
Description |
Normal Time (days) |
Immediate Predecessor(s) |
|
A |
Start |
0.00.0 |
minus− |
|
B |
Design |
8.08.0 |
A |
|
C |
Order special accessories |
0.10.1 |
B |
|
D |
Build frame |
1.01.0 |
B |
|
E |
Build doors |
1.01.0 |
B |
|
F |
Attach axles, wheels, gas tank |
1.01.0 |
D |
|
G |
Build body shell |
2.02.0 |
B |
|
H |
Build transmission and drivetrain |
3.03.0 |
B |
|
I |
Fit doors to body shell |
1.01.0 |
G, E |
|
J |
Build engine |
4.04.0 |
B |
|
K |
Bench-test engine |
2.02.0 |
J |
|
L |
Assemble chassis |
1.01.0 |
F, H, K |
|
M |
Road-test chassis |
0.50.5 |
L |
|
N |
Paint body |
2.02.0 |
I |
|
O |
Install wiring |
1.01.0 |
N |
|
P |
Install interior |
1.51.5 |
N |
|
Q |
Accept delivery of special accessories |
5.05.0 |
C |
|
R |
Mount body and accessories on chassis |
1.01.0 |
M, O, P, Q |
|
S |
Road test car |
0.50.5 |
R |
|
T |
Attach exterior trim |
1.01.0 |
S |
|
U |
Finish |
0.00.0 |
T |
(1)
A - B - D - F - L - M - R - S - T - U
A - B - C - Q - R - S - T - U
A - B - J - K - L - M - R - S - T - U
(2)
buy preassembled transmissions and drivetrains
speed delivery of special accessories by 3 days
speed the building of body shell
none of the above
(3)
non critical
critical
(4)
non critical
critical
The critical path of a project is composed off activities with zero total slack. The critical path(s) is/ are the longest path(s) in a project network. The slacks for each activity can be computed by carrying out forward pass and backward pass in the project network.
Forward Pass:
Backward Pass:
Total slack (or, float) = LF - EF for each activity.
| Job Letter | Normal Time (days) | Immediate Predecessor(s) | ES | EF | LS | LF | Slack |
| A | 0 | - | 0 | 0 | 0 | 0 | 0 |
| B | 8 | A | 0 | 8 | 0 | 8 | 0 |
| C | 0.1 | B | 8 | 8.1 | 10.4 | 10.5 | 2.4 |
| D | 1 | B | 8 | 9 | 12 | 13 | 4 |
| E | 1 | B | 8 | 9 | 10 | 11 | 2 |
| F | 1 | D | 9 | 10 | 13 | 14 | 4 |
| G | 2 | B | 8 | 10 | 9 | 11 | 1 |
| H | 3 | B | 8 | 11 | 11 | 14 | 3 |
| I | 1 | G, E | 10 | 11 | 11 | 12 | 1 |
| J | 4 | B | 8 | 12 | 8 | 12 | 0 |
| K | 2 | J | 12 | 14 | 12 | 14 | 0 |
| L | 1 | F, H, K | 14 | 15 | 14 | 15 | 0 |
| M | 0.5 | L | 15 | 15.5 | 15 | 15.5 | 0 |
| N | 2 | I | 11 | 13 | 12 | 14 | 1 |
| O | 1 | N | 13 | 14 | 14.5 | 15.5 | 1.5 |
| P | 1.5 | N | 13 | 14.5 | 14 | 15.5 | 1 |
| Q | 5 | C | 8.1 | 13.1 | 10.5 | 15.5 | 2.4 |
| R | 1 | M, O, P, Q | 15.5 | 16.5 | 15.5 | 16.5 | 0 |
| S | 0.5 | R | 16.5 | 17 | 16.5 | 17 | 0 |
| T | 1 | S | 17 | 18 | 17 | 18 | 0 |
| U | 0 | T | 18 | 18 | 18 | 18 | 0 |
(b)
The critical path is composed of activities with zero slack. So, the critical path is:
A - B - J - K - L - M - R - S - T - U
(c)
The given three alternatives are activity H, Q, and G and none of them are on the critical path. Shortening them will not result in the early completion of the project. So, the correct answer should be none of the above.
(d)
For reducing the project duration, resources from the non-critical activities should be borrowed to speed activities on the speed up activities on the critical path.
The Rover 6 is a new custom-designed sports car. An analysis of the task of building...
F: The activities in the following table describe the construction of a new house. Activity Predecessor(s) Duration(days) A: Clear site B: Bring utilities to site Excavate D: Pour foundation E: Outside plumbing B, C Frame house D G: Do electric wiring H: Lay floor Lay roof F Inside plumbing E, H K: Shingling Outside sheathing insulation F.J M: Install windows and outside doors F Do brick work L, M 0: Insulate walls and ceiling GJ Cover walls and ceiling 0...
Roberts Auto Sales and Service (RASAS) consists of three car dealerships that sell and service several makes of American and Japanese cars, two auto parts stores, a large body shop and car painting business, and an auto salvage yard. Vicky Roberts, owner of RASAS, went into the car business when she inherited a Ford dealership from her father. She was able to capitalize on her knowledge and experience to build her business into the diversified and successful mini-empire it is...
Describe the project network to build a house from the data below. Calculate the time and critical path. Activity Description Predecessor Time (Days) A Clear the location - 1 B Bring the tool to the location - 2 C Conducting excavations A 1 D Pour the foundation C 2 E Plumbing installation from outside B, C 6 F Create a home frame D 10 G Installation of electric wire F 3 H Install the floor G 1 I Installing the...
THE WAR ON ALLERGIES SUPPOSE THAT 54.3 PERCENT of your country's population had cancer. That figure might set off a nationwide panic-a search for something wrong with people's diet, the environment, activity levels. In fact, that's the percentage of Americans who show a positive skin response to one or more allergens. A1 5 B The manifestations' of allergy-sneezing, itching, rashes-are signs of an une system running amok,2 attacking foreign invaders-allergens- that mean no harm. Allergens include pollen, dust mites, mold,...
QUESTION 3 The textbook discusses 3 types of environmental degradation affecting the environment. Below, please match each type of degradation discussed to the type of consequence suggested in the textbook. (Answer based on what the book says, not based on your personal opinion.) Air pollution A., is killinig humans 8,..isklin the earth Land poliution Water pollution address chiticar Watel Air Pollution Air pollution occurs when the release of materials to the atmosphere cannot be safelv disposed of by natural processes....
Discussion questions
1. What is the link between internal marketing and service
quality in the airline industry?
2. What internal marketing programmes could British Airways
put into place to avoid further internal unrest? What potential is
there to extend auch programmes to external partners?
3. What challenges may BA face in implementing an internal
marketing programme to deliver value to its customers?
(1981)ǐn the context ofbank marketing ths theme has bon pururd by other, nashri oriented towards the identification of...