As a chemical engineer, it is your job to fully neutralize the H2SO4waste being generated by a manufacturing plant. Your goal is to do this usingthe least amount of NaOHrequired in orderto save costs. Ifthe plant generates 1.0 ton (1.0 × 103kg) of sulfuric acid per day, how much NaOH willyou need to purchase to fully neutralize the H2SO4for next week (7 days)?
The balanced equation is : H2SO4 + 2 NaOH
Na2SO4 + 2 H2O
mass H2SO4 per day = 1.0 x 103 kg/day
total mass of H2SO4 = (mass H2SO4 per day) * (7 days)
total mass of H2SO4 = (1.0 x 103 kg/day) * (7 days)
total mass of H2SO4 = 7.0 x 103 kg
moles of H2SO4 = (total mass of H2SO4 ) / (molar mass H2SO4)
moles of H2SO4 = (7.0 x 103 kg) / (98.08 kg/kmol)
moles of H2SO4 = 71.37 kmol
moles NaOH required = 2 * (moles of H2SO4)
moles NaOH required = 2 * (71.37 kmol)
moles NaOH required = 142.74 kmol
mass NaOH required = (moles NaOH required) * (molar mass NaOH)
mass NaOH required = (142.74 kmol) * (40.0 kg/kmol)
mass NaOH required = 5709.7 kg
mass NaOH required = 5.7 x 103 kg
As a chemical engineer, it is your job to fully neutralize the H2SO4waste being generated by...
Assume you are working in a plant as a chemical engineer. One of your tasks is to monitor pH of a specific process. Each day, you record the pH of the process at three different time of the day. The data for the past few days is presented in the following table. we know that standard deviation of the pH of the process is 0.1. Based on the collected data, construct two control charts that monitor the average and variability...
Assume you are working in a plant as a chemical engineer. One of your tasks is to monitor pH of a specific process. Each day, you record the pH of the process at three different time of the day. The data for the past few days is presented in the following table. we know that standard deviation of the pH of the process is 0.1. Based on the collected data, construct two control charts that monitor the average and variability...
You are a field engineer for a construction services
testing firm. Your current job assignment is
to evaluate fill placement for a new roadway being constructed in
Tg, Lumpur, Pahang. The
project specifications for the roadway require fill compaction to
98% of the ASTM D1557
compaction test results. Your lab manager sends you the results of
the Standard and Modified
Proctor compaction testing on the fill being placed. These results
are presented in Figure 2. Your
field compaction test results...
Fresh out of school, you take a job with a small injection-molding shop with two machines (25 ton and 250 ton. On any given shift, there are two workers assigned to each machine one is concerned with setting/loading and unloading while the other packages the final product for shipping. You have been asked to investigate whether you can improve the process, potentially with automation. Having recently re-read The Goal, you are quite aware that adding robots does not necessarily mean...
1) UMGC Industries capital-asset procurement policy requires the board of directors (BOD) approve any single acquisition over $500,000. If the BOD approves a project, then the treasurer will transfer the funds to the respective plant. Within one year, the internal auditing function is charged with reviewing each acquisition to check the propriety of the purchase and disbursal of funds. UMGC Industries plant controller prepared the first proposal for a DEK cutting machine. Other plants were told to wait until internal...
What is the theoretical yield (in grams) and percent yield of your
triphenylmethanol product in this experiment? (Weight of
triphenylmethanol: 0.060g)
BACKGROUND AND THEORY The Grignard reaction was one of the first organometallic reactions discovered and is still one of the most useful synthetically. By reacting an organohalide (usually a bromide) with magnesium in ethereal solvent, carbon becomes a nucleophile. Grignard reagents are the starting points for the syntheses of many alkanes, primary, secondary, and tertiary alcohols, alkenes, and carboxylic...
How can we assess whether a project is a success or a
failure?
This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...
Write down your analysis of this case on factors like the interests involved, context and power PACIFIC OIL COMPANY (A)* "Look, you asked for my advice, and I gave it to you," Frank Kelsey said. "If I were you, I wouldn't make any more concessions! I really don't think you ought to agree to their last demand! But you're the one who has to live with the contract, not me!" Static on the transatlantic telephone connection obscured Jean Fontaine's reply....
Write down your analysis of this case on factors like 1. the negotiation process, strategy and tactics PACIFIC OIL COMPANY (A)* "Look, you asked for my advice, and I gave it to you," Frank Kelsey said. "If I were you, I wouldn't make any more concessions! I really don't think you ought to agree to their last demand! But you're the one who has to live with the contract, not me!" Static on the transatlantic telephone connection obscured Jean Fontaine's...
Summary should briefly analyze the central problems and issues of the case and provide some analysis and suggestions. Thank you. Lean Initiatives and Growth at Orlando Metering Company It was late August 2002 and Ed Cucinelli, vice president of Orlando Metering Company (OMC), sat in his office on a late Saturday morning. He had come in to prepare for some strategic planning meetings that were scheduled for the upcoming week. As he noticed the uncommon silence in the building, Ed...