Sunk costs are those costs that are incurred before in the past
even before the project has started and hence these costs cannot be
recovered by the firm's.
While variable costs, fixed costs and the Total revenue are
incurred and calculated at every point of time when a project
analysis is in place.
Hence, Sunk costs are usually not included in an engineering
economic analysis.