Question

(15pts) Answer each of the following with a TRUE (T) or (1) Data in SRAM will be lost without refreshing frequently or FALSE (F) 9. (2) A cache is a small fast memory that stores a subset of the informatio (3) In set associative cache, ory block can be placed in only (4) The unit of data transfer between cache and main memory is a w (5) When CPU requests a word and cannot find it in cache, it a given mem ord. is called a miss. In this case, the requested word will need to be delivered directly from the main memory to the CP (6) Virtual memory is a technique of using main memory as a cache (7) If you can find a value x in the cache, you can find it in the main memory too. (8) Set associative caches decrease the miss rate but are slow when the associativity is increased. (9) for hard drive. Keeping everything else constant, increasing the block size always decreases the miss rate. (10) Write-Back and Write-Through differ in whether data will be ultimately written to the main memory or not Idea pipelined processor has a CPI-1, which is the same as single cycle processor. So they have the same performance. (12) The clock cycle time of a single cycle microprocessor is determined the critical path (w instruction) (13) We need to put the most recently used item in cache according to spatial locality. (14) Structural hazard is caused by data dependence and data hazard is caused by hardware conflict. (15) A major approach for reducing miss penalty is to use split cache.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

1.FALSE:SRAM:Static Random Access Memory does not need to be refreshed
2.TRUE,cache memory is used to store the program instructions which are frequently used,cache memory is faster than Random access memory
3.FALSE,in set-associative given memory block can be placed in one of n different locations in the cache.
4.FALSE,The unit of data exchanged between the cache and main memory is Block size
5.TRUE,cache allocates a new entry and copies data from main memory
6.TRUE, Virtual memory is created by OS when your computer is hanging while using bigger software or any other things, it can be created by combining space in your computer Ram and hard disk space
7.TRUE,the data which is stored in cache memory fetched from the main memory so you can find
8.TRUE,as the associativity increases performance will be decreased

Add a comment
Know the answer?
Add Answer to:
(15pts) Answer each of the following with a TRUE (T) or (1) Data in SRAM will...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A short program loop goes through a 16 kB array one word at a time, reads...

    A short program loop goes through a 16 kB array one word at a time, reads a number from the array, adds a random number, and stores the result in the corresponding entry in another array that is located in the memory immediately following the first array. An outer loop repeats the above operation 100 times. The 64-bit processor, operating at a clock frequency of 4 GHz, is pipelined, has 48 address lines, three levels of caches with a 64...

  • Question 9 Which of the following statements is true about memory system? Put the answer in...

    Question 9 Which of the following statements is true about memory system? Put the answer in the box. A. Cache memories are usually built by SRAMs, which have higher density and faster access speed than DRAM-based main memories. B. Secondary storages such as hard disk drive and solid-state drive are typically volatile memories. C. Compared to the associative cache mapping function, direct mapping function has more flexibility. D. Due to locality of reference, the basic transfer unit between cache and...

  • 1. (4 pt) Circle True or False. Each is 2 pts. t Recently Used (LRU) replacement...

    1. (4 pt) Circle True or False. Each is 2 pts. t Recently Used (LRU) replacement policy generates better miss penalty than FIFO for fully- associative caches ngger b me rna 2. (8 pt) Find the Average Memory Access Time (AMAT) for a machine with following configuration: The machine has the hit rate of 95% with the hit time of 2 ns. A miss costs 30 ns to fetch the desired ume that the read and write miss penalties are...

  • The Pentium 4 microprocessor have two 8 Kbyte, Level 1 caches – one for data and...

    The Pentium 4 microprocessor have two 8 Kbyte, Level 1 caches – one for data and one for instructions.          However, a design team is considering another option – a single, 16 Kbyte cache that holds both instructions and data. Additional specs for the 16 Kbyte cache include: - Each block will hold 32 bytes of data (not including tag, valid bit, etc.) - The cache would be 2-way set associative - Physical addresses are 32 bits - Data is...

  • Q4. CISC/RISC and Cache Memory (24pts) Q4-1. Assume that UltraSpark-like processor has an L1 cache with...

    Q4. CISC/RISC and Cache Memory (24pts) Q4-1. Assume that UltraSpark-like processor has an L1 cache with the following specifications: 40-bit wide address and 64-bit wide data busses On-chip instruction cache Cache is 16K bytes, organized as a 2-way set associative Cache line (block) size = 64 bytes 200 MHz clock frequency Average cache hit rate = 90% Instructions located in cache execute in 1 clock cycle Instructions that are not found in the on-chip cache will cause the processor to...

  • Each of the following questions is either True or False. Place a T (True) if the...

    Each of the following questions is either True or False. Place a T (True) if the answer is True on the answer sheet beside the question; otherwise place a F (False) if the answer is False on the answer sheet beside the question. 21. Variable-length instructions are easier to decode than fixed-length instructions.       T                                        F 22. Fixed-length instructions always have the same number of operands.       T                                        F 23. The two types of cache write policies are write-through and write-back.       T                                        F 24. When...

  • T F Xilinx's SDK assembler supports both FOR statements, but not wHILE statements T F In the ARM processor, immediate operands are stored in data memory, and not in the opcode T F In ARM proc...

    T F Xilinx's SDK assembler supports both FOR statements, but not wHILE statements T F In the ARM processor, immediate operands are stored in data memory, and not in the opcode T F In ARM processor instructions, one but not both operands can come from main T F In the ARM processor, a single load/store instruction T F It is possible for a microprocessor to use a virtual TCache memory is typically much faster and much larger than main memory...

  • 1 Overview The goal of this assignment is to help you understand caches better. You are...

    1 Overview The goal of this assignment is to help you understand caches better. You are required to write a cache simulator using the C programming language. The programs have to run on iLab machines. We are providing real program memory traces as input to your cache simulator. The format and structure of the memory traces are described below. We will not give you improperly formatted files. You can assume all your input files will be in proper format as...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT