A job consists of three elements. Twenty observations for each element were timed, and the resulting data are shown in the following table. A performance rating has also been assigned for each element, as shown in the table. The job has an allowance of 15% of normal time. Performance Rating Element #1 #2 #3 70 110 90 Average Element Time (in minutes) 3.6 2.5 3.1 Use the information in Scenario 4.3. What is the normal time for job element #1? o a. Greater than or equal to 3 minutes o b.Less than 3 minutes but greater than or equal to 2.6 minutes c. Less than 2.6 minutes but greater than or equal to 2.2 minutes o d.Less than 2.2 minutes

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer: - Option "C" --- Less than 2.6 minutes but greater than or equal to 2.2 minutes

Explanation: - Formula to calculate Normal time = Average element time * Performance rating

Here, Average element time for job #1 = 3.6 minutes and Performence rating = 70% or 0.70

Normal time = 3.6 minutes * 0.70 = 2.52 minutes

The best suited Option to the obtained normal time is Option "C"

Add a comment
Know the answer?
Add Answer to:
A job consists of three elements. Twenty observations for each element were timed, and the resulting...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A time study was conducted on a job that contains four elements. The observed times and...

    A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. OBSERVATIONS (minutes per cycle) Element Performance Rating 1 2 3 4 5 6 1 80 % 0.51 0.56 0.46 0.46 0.46 0.46 2 75 1.51 1.51 1.46 1.46 1.46 1.51 3 120 0.86 0.86 0.76 0.81 0.86 0.81 4 105 1.11 1.16 1.11 1.16 1.16 1.21 a. Determine the average cycle time for...

  • 3 A job was timed for 60 cycles and had an average of 1.16 minutes per...

    3 A job was timed for 60 cycles and had an average of 1.16 minutes per piece. The performance rating was 86 percent, and workday percent. Determine each of the following: allowances are a. Observed time. (Round your answer to 2 decimal place.) Observed time minutes 5 polnts b. Normal time. (Round your answer to 2 decimal places.) Normal time minutes eBook c. Standard time. (Round your answer to 2 decimal places.) References Standard time minutes

  • Observations (minutes per cycle) Element Rating 1 2 3 4 5 6 7 1 100% 2.0...

    Observations (minutes per cycle) Element Rating 1 2 3 4 5 6 7 1 100% 2.0 1.9 1.8 2.1 2.0 2.2 1.8 2 110% 7.5 7.7 7.2 7.5 8.2 7.4 7.0 3 110% 3.4 4.7 3.7 4.4 3.3 3.5 3.6 4 90% 10.3 11.3 12.7 10.1 12.2 12.1 10.2 Assuming a 25% allowance factor for the process, find the standard time for this process

  • Please show a step by step answer to this problem with all possible calculations and show...

    Please show a step by step answer to this problem with all possible calculations and show pictures if any tables/graphs were used. Thanks! .. 10.22 A hotel housekeeper, Alison Harvey, was observed five times on each of four task elements, as shown in the following table. On the basis of these observations, find the standard time for the process. Assume a 10% allowance factor. ELEMENT Check minibar Make one bed Vacuum floor Clean bath PERFORMANCE RATING (%) 100 90 120...

  • What is a Therblig? Please specify and give exampie. 3) A time study was conducted on a job that ...

    What is a Therblig? Please specify and give exampie. 3) A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. Note that all units are in minutes 15 Element Performance 1 13 4 6 rating 85% 100% 110% 95% 0.5 258* 0.89 1.14 0.46 1.52 0.8 0.44 1.5 0.84 1.1 0.43 1.47 0.48 1.49 0.85 0.45 1.51 0.83 1.081.21.161.26 4 * Machine broke...

  • Installing a muffler at Barut Garage, Inc. involves a five work tasks. Azra has timed workers...

    Installing a muffler at Barut Garage, Inc. involves a five work tasks. Azra has timed workers performing these tasks seven times, with the results (in minutes) shown in the following table. No Tasks 1 2 3 4 5 6 7 PR 1 Select correct mufflers 5 4 6 3 4 5 5 120 2 Remove old muffler 8 8 8 6 8 7 6 85 3 Install new muffler 15 13 15 14 12 15 13 85 4 Inspect the...

  • Based on a careful work study in the Hofstetter? Corp., the results shown in the following...

    Based on a careful work study in the Hofstetter? Corp., the results shown in the following table have been? observed: a) The normal time for the "prepare daily reports" operation = ___ minutes (round your response to two decimal places). The normal time for the "photocopy results" operation = ___ minutes (round your response to two decimal places). The normal time for the "label and package reports" operation = ___ minutes (round your response to two decimal places). The normal...

  • a) The normal time for the "prepare daily reports" operation = _________ minutes (round your response...

    a) The normal time for the "prepare daily reports" operation = _________ minutes (round your response to two decimal places). The normal time for the "photocopy results" operation = __________ minutes (round your response to two decimal places). The normal time for the "label and package reports" operation = _________ minutes (round your response to two decimal places). The normal time for the "distribute reports" operation = _________ minutes (round your response to two decimal places). The normal time for...

  • Hello, I created this question myself and was able to use the excel OM software for...

    Hello, I created this question myself and was able to use the excel OM software for the answer. I was wondering if you could help me translate the information. what does this all mean? The question is in the upper right hand corner. Thanks in advance. AutoSave Group Project7.9.20 Kimberly Smith KE ER de Home Insert Page Layout Formulas Data Review Help Comments casti General 28 O 09- Α' Α' Wrap Test A-EE. Merge Center - BTW BE- Weas Sort...

  • The normal time for the "label and package reports" operation = minutes (round your response to...

    The normal time for the "label and package reports" operation = minutes (round your response to two decimal places). UU. VOLUP тогт" тоотроо UUUUUU. TIU, LLOILOPO % Problem 10.28 Question Help Based on a careful work study in the Hofstetter Corp., the results shown in the following table have been observed: Performance Observation (minutes per cycle) 2 3 Rating 5 34 40 Element Prepare daily reports Photocopy results Label and package reports Distribute reports 39 11 37 * 12 120%...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT