Installing a muffler at Barut Garage, Inc. involves a five work
tasks. Azra has timed workers performing these tasks seven times,
with the results (in minutes) shown in the following
table.
|
No |
Tasks |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
PR |
|
1 |
Select correct mufflers |
5 |
4 |
6 |
3 |
4 |
5 |
5 |
120 |
|
2 |
Remove old muffler |
8 |
8 |
8 |
6 |
8 |
7 |
6 |
85 |
|
3 |
Install new muffler |
15 |
13 |
15 |
14 |
12 |
15 |
13 |
85 |
|
4 |
Inspect the work |
4 |
4 |
3 |
3 |
3 |
3 |
3 |
110 |
|
5 |
Complete paperwork |
9 |
8 |
9 |
8 |
10 |
7 |
10 |
110 |
Given that Azra does not want an error of more than 0.07 and a
confidence level less than 0.85 answer the following:
Provide the z-score: Round to the nearest hundredth, for
example 4.22
Does the number of observations for the following tasks warrant
such confidence level?
Enter YES or NO.
Task # 3 Install new
muffler :
Task # 5 Complete paperwork :
What are the required numbers of observations for these tasks?
Enter the number.
Task # 3 Install new
muffler :
Task # 5 Complete paperwork :
Assume that the number of observations for the following tasks
justifies the confidence level and accuracy mentioned above. Also
note that Azra factors in a total of fatigue and personal allowance
of 0.15 applied to job time. Provide the following results from
your solution:
|
Task |
Normal Time* |
Standard Time* |
|
# 2 Remove old muffler |
min |
min |
|
# 4 Inspect the work |
min |
min |
Provide the total standard time* for the whole
job: minutes.
*Round to the nearest hundredth, for example 8.45 minutes
| Task | 1 | 2 | 3 | 4 | 5 | 6 | 7 | PR | mean | NT |
| 1 | 5 | 4 | 6 | 3 | 4 | 5 | 5 | 120 | 4.571429 | 5.485714 |
| 2 | 8 | 8 | 8 | 6 | 8 | 7 | 6 | 85 | 7.285714 | 6.192857 |
| 3 | 15 | 13 | 15 | 14 | 12 | 15 | 13 | 85 | 13.85714 | 11.77857 |
| 4 | 4 | 4 | 3 | 3 | 3 | 3 | 3 | 110 | 3.285714 | 3.614286 |
| 5 | 9 | 8 | 9 | 8 | 10 | 7 | 10 | 110 | 8.714286 | 9.585714 |
for 0.85 confidence level, z score will be 0.935
Number of observations needed for a task =[ z xSD / h x Mean]2
where h is the tolerance level
for task 3 N= [ 0.935 x1.2149 / 0.07x13.857]2 = 1.37 =2
hence the process does not warrant such high confidence level,since current number of observations is 7
For task 5 N = [ 0.935 x 1.1126 / 0.07x8.7142]2 = 2.9
Hence the process does not warrant such high confidence level, since current number of observations is 7
Task 2 normal time = rating * mean time = 6.1928
Task 2 standard time = 6.1928 /1- fatigue allowance = 6.1928 /1-0.15 =7.2856
Task 4 normal time = 3.6142
Task 4 standard time = 3,6142 / 1- 0.15 =4.252
Normal time for complete task = 36.657
Standard time for complete task = 36.657 /1-0.15 = 43.1258
Installing a muffler at Barut Garage, Inc. involves a five work tasks. Azra has timed workers...
Please solve in MS Excel only Installing a muffler at Barut Garage, Inc. involves a five work tasks. Azra has timed workers performing these tasks seven times, with the results (in minutes) shown in the following table. No Tasks 1 2 3 4 5 6 7 PR 1 Select correct mufflers 3 3 6 3 5 3 3 85 2 Remove old muffler 8 5 7 5 7 5 8 120 3 Install new muffler 13 11 11 12 14...
John is installing a production line in the kitchen of his successful restaurant “Light of the World” to make vanilla soufflé with caramel sauce. He figures his layout can be broken down into the following tasks: A. Egg separation – 8.5 min. B. Flour, milk, vanilla, egg yolk and sugar blend – 6.5 min. C. Fold egg whites into blend – 2.0 min. D. Bake – 8.9 min. E. Remove from oven, apply topping, garnish, stage, deliver – 8.0 min....
Consider the following tasks that must be assigned to four workers on a conveyor--paced assembly line (i.e., a machine--‐paced line flow). Each worker must perform at least one task. Time to Complete Task (seconds): Task 1: 26 Task 2: 25 Task 3: 15 Task 4: 24 Task 5: 15 Task 6: 20 Task 7: 47 Task 8: 15 Task 9: 20 Task 10:25 Task 11: 15 Task 12: 20 The current conveyor--paced assembly-‐line configuration assigns the workers in the following...
Consider the following tasks that must be assigned to four workers on a conveyor-paced assembly line (i.e., a machine-paced line flow). Each worker must perform at least one task. There is unlimited demand. Time to Complete Task (seconds) Task 1 20 Task 2 20 Task 3 10 Task 4 15 Task 5 10 Task 6 15 Task 7 40 Task 8 10 Task 9 15 Task 10 20 Task 11 10 Task 12 15 The current conveyor-paced assembly-line configuration assigns...
1. Consider the following table providing the needed tasks to completing a successful project. The first column provides the name of the task, the second column states the time to complete that task and the third column tells when a task can begin. Task Time to Condition to start task complete #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 7 days None 5 days 8 daysNone 4 days 3...
5). Corrective maintenance task times were observed and tabulated in the table below. Task Time (min) Frequency Task Time (min) Frequency 41 2 37 4 39 3 25 10 47 2 36 5 35 5 31 7 23 13 13 3 27 10 11 2 33 6 15 8 17 12 29 8 19 12 21 14 What is the range of observations? Range of observations = max task time – min task time = 47 – 11 = 36...
The task times of 12 independent tasks T1 to T12 are given, in minutes, as 2, 7, 4, 10, 10, 3, 3, 6, 11, 5, 8, 9 Use the list processing algorithm to schedule these tasks on three processors, #1, #2, and #3. The tasks are prioritized in the order written above. (a) Which of these tasks does processor #1 complete? T1 T2 T3 T4 T5 T6 T7 T8 T9 T10 T11 T12 (b) Which of these tasks does processor...
Information regarding tasks in an assembly line run for an 8-hour shift each day is provided: Task Proceeding Task (s) Tme (min) A - 5 B - 3 C - 2 D A 1 E B 4 F C 6 G D,E 7 H G 5 I F,G 6 J H,1 4 K I 3 a)What is the theoretical minimum number of stations for a shift output of 40 units? B)if the line is balanced according to the desired cycle...
1 - [30 pts] Scheduling Algorithms Comparison Assume that we have 5 independent and aperiodic tasks (T1, ... , Ts) and they arrive to the system at times indicated below. Each task will run for the amount of execution time listed and is assigned a priority ranging from 0 (highest) to 10 (lowest), i.e. lower value means higher priority. There are no other tasks scheduled to arrive to the system until T1, ... , Ts complete. Task Arrival Time Execution...
I want the soloution without excel
2. In a hospital the task done by the staff to discharge the patient from the hospital is studied to determine the standard time. The detailed timing for discharging the each patient is given below. Tasks Observations (Minutes) 2 3 Take the details of the patients 14 16 17 Prepare a report 17 18 20 Consultation with the doctor 20 25 23 Handle the payment 19 22 20 4 15 19 30* 18 5...