Question

From this pert chart, draw a gantt chart and be clear about start and finish times

Task PredecessorTme ES EFLF LS Slack(LF-EF) 5 9 9 5 9 13 139 13 191913 19 23 23 19 23 2727 23 19 | 21 | 29 | 27 21 23 31 29 27 31 31 27 19 25 27 21 25 29 31 |27 31 33 3331 4

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Gantt chart is following:

Gantt chart Task Time ES EFLF LS Slack 1 2 3 4567 8 9 1011 12 13 1415 1617 1819 20 21 22 23 2425 26 27 28 29 30 31 3233 5 0 5 5 0 0 4 5 995 0 4 9 13 13 9 0 6 13 1919 13 4 19 23 23 19 0 4 23 2727 23 0 2 19 21 29 27 8 2 21 23 31 29 8 4 27 31 31 27 0 6 19 25 27 21 2 4 25 29 31 27 2 2 3 L H,I,K 2 31 33 33 31 0

Add a comment
Know the answer?
Add Answer to:
From this pert chart, draw a gantt chart and be clear about start and finish times...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 4. A project manager calculated early and late start and finish times for all activities in...

    4. A project manager calculated early and late start and finish times for all activities in her eight-activity project but spilled her energy drink on the paper and the acid in the beverage wiped out some of the table entries. The remaining legible entries are correct. Activity Predecessor Duration ES EF LS LF Slack A -- B A 12 12 C A 5 18 D B 8 E C 9 0 F D,E 27 34 0 G E 6 33...

  • The ABC Manufacturing Co. has made a decision to replace an existing production line with new...

    The ABC Manufacturing Co. has made a decision to replace an existing production line with new equipment. This project will require several tasks (jobs) with precedence relationships and duration (days) as shown in the following table. The project will be finished when activities A-J are all finished. Activity predecessor Optimistic Most likely Pessimistic Expected A - 4 5 12 B A 3 4.5 15 C A 2 3 4 D C 6 8 22 E B 4 6 8 F...

  • also needs daves latest start and latest finish: Dave Fletcher was able to determine the activity...

    also needs daves latest start and latest finish: Dave Fletcher was able to determine the activity times for constructing his laser scanning machine. Fletcher would like to determine ES, EF, LS, LF, and slack for e activity. The total project completion time and the critical path should also be determined. Here are the activity times: Activity Time (weeks) Immediate Predecessor(s) Activity Time (weeks) Immediate Predecessor(s) C, E D, F Dave's earliest start (ES) and earliest finish (EF) are: Activity ES...

  • 21. Using the CPM method, calculate early start (ES), late start (LS), early finish (EF), late...

    21. Using the CPM method, calculate early start (ES), late start (LS), early finish (EF), late finish (LF) and total float (TF) for each activity in the following network and answer the questions 21-1. The ES of activity His: a) 18 b) 22C) 5 d) 2 21-2. The LF of activity B is: a) 20 b) 22c) 18d) 19 ) 13 d) 59 21-3. The TF of activity A is: a) 5 b ) 17 c) 18 21-4. The project...

  • Question 6 Gantt Chart (20 points) Develop the Gantt chart for the following network diagram. Ind...

    Please help with this civil engineering problem! I promise I'll rate your answer! Question 6 Gantt Chart (20 points) Develop the Gantt chart for the following network diagram. Indicate in the Gantt chart the total float value for each activity that is not part of the critical path by marking the corresponding cells of an activity with dash marks “ “ ESD Duration EFD Activity Name LSD| Float LFD 213 3 2 5 5 2 7 13 10 15 15...

  • 7. For the following schedule, draw the node network, perform the CPM calculations, mark the critical...

    7. For the following schedule, draw the node network, perform the CPM calculations, mark the critical path, and complete the table. Activity IPA Duration ES EF LS LF TF FF A - 3 0 3 3 6 3 5 B - 5 0 5 5 10 5 2 C A 6 3 9 9 14 5 4 D A, B 9 5 14 14 23 9 9 E A, B 4 5 9 9 12 7 4 F B 6...

  • CHAPTER 13 / Developing and implementing Effective Accounting Information Systems 431 14 FIGURE 13-11 PERT network...

    CHAPTER 13 / Developing and implementing Effective Accounting Information Systems 431 14 FIGURE 13-11 PERT network diagram for a systems implementation project. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 Activity Prepare the Physical site 3958 Determine functional changes Select and assign personnel Train personnel Acquire and install computer equipment Establish...

  • 39. Consider the following project, and answer the next 5 questions based on this data: Task...

    39. Consider the following project, and answer the next 5 questions based on this data: Task ID Duration (Days) Predecessors 2 70 - 3 30 2 4 120 3 5 120 2 6 120 5 7 120 3,6 8 150 3,6 9 115 3,6 10 130 7,9 11 90 7,9 12 30 7,9 13 120 7,9 14 75 10 15 30 14 16 85 6 17 165 16 18 90 16 19 90 17,18 20 20 8,11,13,15,19 What is the...

  • Pls help on filling out Tritraion of a Polyprotic acid chart Data from lab Titration #1...

    Pls help on filling out Tritraion of a Polyprotic acid chart Data from lab Titration #1 Titration #2 Titration #3 mL base added pH mL base added pH mL base added pH 1 0.7 1 0.7 1 0.7 2 1.1 2 1 2 0.9 3 1.5 3 1.4 3 1.3 4 1.7 4 1.6 4 1.5 5 1.9 5 1.8 5 1.7 6 2 6 2.1 6 2 7 2.2 7 2.2 7 2.2 8 2.4 8 2.3 8 2.2...

  • This type of dataset is best described as a ____ and a residual problem common with...

    This type of dataset is best described as a ____ and a residual problem common with this type of data is ___ Cross-sectional data; heteroscedasticity Time series data; heteroscedasticity Cross-sectional data; residual correlation Time series data; residual correlation Cross-sectional data; multicollinearity None of the above Age Temp Length 1 14 25 620 2 28 25 1,315 3 41 25 2,120 4 55 25 2,600 5 69 25 3,110 6 83 25 3,535 7 97 25 3,935 8 111 25 4,465...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT