A pipe bending machine used to produce ship system components was operated as follows:

  • The period of operation was 25 days @ 10 hrs per day.
  • It produced 800 total pipe details, of which 40 were rejected by quality inspectors.
  • The total setup time for the machine during the 25 days was 22 hours.
  • The machine had 3 unplanned breakdown events
    • 1.5 hours for a power failure
    • 0.5 hours for computer network failure
    • 2.2 hours for lubricant pump failure
  • The theoretical cycle time for the parts averages 10 minutes per part.
  • 30 minutes of planned downtime was experienced when workers attended a Labor Union Meeting

(show calculations)

         a. What is the overall equipment efficiency (OEE) value? (show work)

         b. What are the quality; performance, and availability rates? (show work)

         c. Between Availability, Quality and Performance, which measure would you

             prioritize when beginning improvement efforts?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

OEE - Overall Equipment Effectiveness relies on 3 factors - Availability, Performance, and Quality.

i.e. OEE=Availability*Performance*Quality

Run Time = Planned Production Time − Stop Time = ((25*10)-0.5-22) - (1.5+0.5+22) = 203.5 hrs.

Availability is the takes into account the unplanned and planned stoppages

Availability =  Run Time / Planned Production Time
= 203.5/ (25*10)
= 0.814

i.e. Availability is 81.4%

Performance takes into account the slow cycle time.

Performance = (Ideal Cycle Time × Total Count) / Run Time
= (1/6 * 800)/ 203.5 Cycle time is 10mins per part i.e. 1/6 hr.
= 0.655

i.e. Performance is 65.5%  

Quality is regarding the defects(or errors) created or done  in the process

Quality = Good Count / Total Count = (800-40)/800 since, 40 out of 800 details are defective
= 0.95

i.e. Quality is 95%

Hence, OEE = 81.4%*65.5%*95% *100
= 50.65%

For improvement in the above mentioned case, priority to be given to improving the Performance of the equipment as there is a huge scope for improving this parameter.

Add a comment
Know the answer?
Add Answer to:
A pipe bending machine used to produce ship system components was operated as follows: The period...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A pipe bending machine used to produce ship system components was operated as follows: The perio...

    A pipe bending machine used to produce ship system components was operated as follows: The period of operation was 25 days @ 10 hrs per day. It produced 800 total pipe details, of which 40 were rejected by quality inspectors. The total setup time for the machine during the 25 days was 22 hours. The machine had 3 unplanned breakdown events 1.5 hours for a power failure 0.5 hours for computer network failure 2.2 hours for lubricant pump failure The...

  • OVERALL EQUIPMENT EFFICIENCY A CNC machine tool is used for single shift working, the machine tool...

    OVERALL EQUIPMENT EFFICIENCY A CNC machine tool is used for single shift working, the machine tool is operated for 8 hours per shift for 5 days per week. The CNC machine fool produces terminal blocks at a planned production rate of 60 units per hour Using the Availability, Performance and Quality losses given in the table below, (all values are in minutes per week) Calculate the average Overall Equipment Efficiency (OEE) for the machine tool over the three week period...

  • Summary should briefly analyze the central problems and issues of the case and provide some analysis...

    Summary should briefly analyze the central problems and issues of the case and provide some analysis and suggestions. Thank you. Lean Initiatives and Growth at Orlando Metering Company It was late August 2002 and Ed Cucinelli, vice president of Orlando Metering Company (OMC), sat in his office on a late Saturday morning. He had come in to prepare for some strategic planning meetings that were scheduled for the upcoming week. As he noticed the uncommon silence in the building, Ed...

  • I have this case study to solve. i want to ask which type of case study...

    I have this case study to solve. i want to ask which type of case study in this like problem, evaluation or decision? if its decision then what are the criterias and all? Stardust Petroleum Sendirian Berhad: how to inculcate the pro-active safety culture? Farzana Quoquab, Nomahaza Mahadi, Taram Satiraksa Wan Abdullah and Jihad Mohammad Coming together is a beginning; keeping together is progress; working together is success. - Henry Ford The beginning Stardust was established in 2013 as a...

  • SYNOPSIS The product manager for coffee development at Kraft Canada must decide whether to introduce the...

    SYNOPSIS The product manager for coffee development at Kraft Canada must decide whether to introduce the company's new line of single-serve coffee pods or to await results from the product's launch in the United States. Key strategic decisions include choosing the target market to focus on and determining the value proposition to emphasize. Important questions are also raised in regard to how the new product should be branded, the flavors to offer, whether Kraft should use traditional distribution channels or...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT