Which of the following is NOT an element of the project master plan (i.e., project charter)?
| A. |
schedules |
|
| B. |
PMBOK |
|
| C. |
resource requirements |
|
| D. |
personnel |
|
| E. |
potential risks |
What should the results of the project launch meeting include?
| A. |
finalizing the project team |
|
| B. |
finalizing the project’s schedule |
|
| C. |
finalizing the project’s budget |
|
| D. |
the project’s scope is understood |
|
| E. |
selecting the project sponsor |
Which of the following is NOT a characteristic of effective project team members?
| A. |
They are technically competent. |
|
| B. |
They are politically sensitive. |
|
| C. |
They have a strong orientation to their discipline. |
|
| D. |
They are goal oriented. |
|
| E. |
They have high self-esteem. |
What are the three primary areas between which the PM will make trade-offs during a project?
| A. |
profit, schedule, quality |
|
| B. |
schedule, budget, quality |
|
| C. |
specification, budget, schedule |
|
| D. |
specification, quality, schedule |
|
| E. |
budget, quality, profit |
Ans 1
| B. |
PMBOK |
Ans 2
| D. |
the project’s scope is understood |
Ans 3
| C. |
They have a strong orientation to their discipline. |
Ans 4
| B. |
schedule, budget, quality |
Which of the following is NOT an element of the project master plan (i.e., project charter)?...
#1 The Project Charter should include the following: a. background and purpose b. scope c. mission statement d. team composition e. operational framework f. performance measures g. all of the above #2 Advantages for using the CAHPS survey for assessing the VOC include the following (choose best answer) a. the survey is standardized and validated b. the survey can be administered at no cost c. comparative data is available at no cost d. all the above e. a and b...
9. A project manager spent some days to create a multi-page document, which he called project charter. The document should have been issued by the project sponsor.The sponsor found the document outsized and asked for a condensed document. Which of the following is usually not an element of the project charter? a. The authority level of the project manager b. Detailed control account and work package descriptions C. The business need that the project was undertaken to address d. High-level...
Which of the following documents discusses how requirements activities will be planned, tracked and changed? a. WBS b. Requirements management plan c. Change control plan d. Scope management plan You are developing the project charter. You should consider all of the following as inputs in the Develop Charter process EXCEPT: a. Enterprise Environmental Factors b. Business Case c. Project Management Plan d. Project Statement of Work Your initial list of identified risks will generally have all of the following information...
What does PMO mean? A. Performance Management Office B. Project Management Overview C. Performance Management Overview D. Project Management Office E. Project Management Objective Which of the following is an important project manager role? A. technical expert B. supervisor C. project sponsor D. micromanager E. communicator What is a milestone? A. a significant event in the project B. a mark on a chart that depicts project progress C. an activity on the critical path D. an activity with an uncertain...
Someone on your team is skeptical that the project is following the project's original requirements. Which document will you refer to in order to convince him/her that the project is indeed following the original requirements? a. Project Management Plan b. Project Scope Statement c. Project Charter d. Work Breakdown Structure
Table 1.1
Module Three covers refining your project schedule and fine-tuning resources. Table 1-1: Project Management Process Group and Knowledge Area Mapping (PMBOK Guide® on page 556) provides you with a very specific guideline concerning what task is due for each knowledge area throughout the five projec management process groups. As you can determine from Table 1-1, a large majority of the tasks are complete during the planning process group Describe and explain how sound industry standards or best practices...
Which of the following is NOT a characteristic of the Project Management Plan? a. Collection of subsidiary plans b. Formal, written communication c. A bar chart that shows the order of tasks and their resource assignments d. Must be approved by project sponsor
HU, Closed book, 13. Scope management for a project begins with: (53M) A) A work package. B) An organization breakdown structure. C) A statement of goals. D) A configuration statement. 14. A graphical display of costs against project schedule is called a(n): (5SS) A) S-curves. B) Gantt chart C) Project schedule chart D) Budget in phases 15. The lowest level in work breakdown structure contains the: (50V) A) Atoms. B) Activities. C) Finite elements D) Work packages. E) Sub-Task or...
Subject: End User Data Analysis Tools Project Charter Requirements The following are the requirements for your Project Charter. 1. The Project Charter should be 4-5 type written double spaced pages in length. Charter should be written in MSWord. 2. Your Project Charter should be based on one of the 3 following topics: a. Cloud Computing b. Solar energy c. Lease or Buy Computer Systems. 3. Your Charter should contain as a minimum: a. Which of the three projects you have...
1 In regard to Project Work, which activity refers to “reviewing the progress and capturing project performance data with reference to the project plan, developing performance measures, and communicating performance information?” a. controlling b. monitoring c. executing d. managing 3 Which of the following formulas represents the schedule performance index (SPI)? a. EV/PV b. EV PV c. EV AC d. EV/AC 4 If your sponsor asks for an estimate as to how much more money your team needs to complete...