The preliminary system design (conceptual design) begins with the system level requirements that are documented in the A-specification (system level specification) and the support concept documents. These system level requirements are translated into detailed qualitative and quantitative design requirements through the processes of functional analysis and requirements allocation.
Required:
Carry out a preliminary system design of a product or service you wish to invent of your choice. Illustrate the concepts noted above. (20)
PRELIMINARY DESIGN
A preliminary design is of an entire treatment facility , carried out in insufficient detail to enable accurate estimation of the costs for constructing and operating treatment facility.
Design process
It is regarded as creative problem solving through a series of steps or a sequences of activities , which lead from initial concept to realization.
Example of preliminary design
CONSTRUCTION OF HOME
1. Conceptual or preliminary design
The first step or phase of the design process is to create a preliminary design by understanding your idea . The best way to create preliminary concepts is by having a meeting in which you can review your wish list with your home builder and designer.
preliminary research
* Examine your current home and lifestyle
*Developing your design brief
*Deciding baseline budget.
*Exploring sources of professional advice for stage of decision
*Familiarizing yourself with the advise in this guide to inform your brief
Create a construction activity diagram

Choose designer
Choosing the right designer for your project is arguably most important step on the path to your new home.Architectures and building designers.
Site analysis
Visit the sight with your designer to do a SWOT analysis ( strength , weakness, opportunities ,threats )
on the site consider :
* Climate responsive design and site specification .
*orientation
*solar access.
* Views
* Storm water drainage
*Slope
*Access and transport
* Services
* Soil type.
* Water availability.
Then make a concept plan and site analysis after the first site visit.
Brief development, fee proposal and design contract
After brief discussion about site analysis and fee proposal design a contract.Review your preliminary budget and your brief with designer.
|
Opinion of probable cost - Initial design has been based on total square meter cost of $1000/ square meter. This figure is based on " on off " production . The modular design will be produce significant cost savings if applied to large volume runs produced in a factory environment . - Opinion one has floor area of 105 sq.m and our opinion of probable cost is in the order of $115,000. - other costs include: * 3kw photovoltaic array =$ 30000 *Water tank and pumps = $ 7000 * native landscaping and site workers =$7000 * waste tank = $ 5000 |
Design development
The second step in your custom in fill home's design process will be preparing your drawings to obtain development permit.
In this phase , developers develops the structural design in detail base don your selection for exterior material and finishes.

Building permit
After obtaining your development permit , design can proceed to the third step of the design process for your custom infill home. Once DP is approved , the design team can prepare site plans and drawing needed for the building permit .This essential detailed floor plans, detailed exterior elevations , roof plans and electrical plans. Team creates a building permit package and take care of everything required to proceed with the construction process.
Interior design
Finally , in this last step ,team will work with you to cover all interior details , work on elevations all based on your interior material selections , lightning , plumbing , hardware , glass ,finishes and so on.
The preliminary system design (conceptual design) begins with the system level requirements that are documented in...
Reliability requirements, such as MTBF, are normally determined during __________. A. Conceptual design B. Preliminary system design C. Detail design and development D. System functional analysis
Case Study 12: Hong Kong Police’s Project Management B Chuah Background In the 1990’s, Hong Kong Police (HKP) was responsible for the public safety and internal security of Hong Kong. She came under the umbrella of the Security Bureau of the Government of Hong Kong. It had more than 34,000 employees, of these, over 26,000 were disciplinary staff. This was the largest department within the hierarchy of the Government of Hong Kong. The organization structure of HKP was rather complicated....
Question 5: Conceptual Design (25 marks) The Felicity Stillwell Hospital (FSH) is a small hospital located in the southern suburbs of Perth, specialising in the health care of elderly patients. As the first phase of a complete information systems redevelopment, you have been contracted to design the database that will support its data and processing requirements. Depending on how well you perform, you may be asked to implement the design at some later time. Detailed information on the data recorded,...
A new version of the operating system is being planned for installation into your department’s production environment. What sort of testing would you recommend is done before your department goes live with the new version? Identify each type of testing and describe what is tested. Explain the rationale for performing each type of testing. [ your answer goes here ] Would the amount of testing and types of testing to be done be different if you were installing a security...
How can we assess whether a project is a success or a
failure?
This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...
THE NEED FOR health information management (HIM) professionals in long-term and post-acute care (LT-ÉAC) settings has grown exponentially in the past decade. With the implementation of setting-specific reimbursement models and quality initiatives, the skill sets that HIM professionals bring to the table are invaluable to any healthcare organization. 'Ihey are a source of expertise in data analysis, documentation, privacy and security, quality, compliance, coding, and information systems. Organizations and HIM professionals from the various LTPAC settings have reached out to...
Please help writing a well structured document using the below Agile Runbook - Our Overall Delivery Process How do we initiate a Project? Any project is a response to a pain point or desire expressed by either customers, internal stakeholders, employees, or regulatory authorities. In short, a project is a time bound and specific goal oriented task-system that is born out of an ask from any stakeholder. Project initiation is laying down a new project by defining its goals, objectives,...
please read instructions on the first picture and follow
it
Discussion Board: Chapter 1 Due: Jun 28, 2019 at 11:59 PM Please read the article titled Evolution of Operations Planning and Control: from production to supply chains In at least three paragraphs, describe how and why the focus of operations planning and control has changed over time. While one might argue that answers consisting of sentences quoted from articles do not represent plagiarism, I do not consider them acceptable, and...
please read instructions on the first picture and follow
it
Discussion Board: Chapter 1 Due: Jun 28, 2019 at 11:59 PM Please read the article titled Evolution of Operations Planning and Control: from production to supply chains In at least three paragraphs, describe how and why the focus of operations planning and control has changed over time. While one might argue that answers consisting of sentences quoted from articles do not represent plagiarism, I do not consider them acceptable, and...
First, read the article on "The Delphi Method for Graduate Research." ------ Article is posted below Include each of the following in your answer (if applicable – explain in a paragraph) Research problem: what do you want to solve using Delphi? Sample: who will participate and why? (answer in 5 -10 sentences) Round one questionnaire: include 5 hypothetical questions you would like to ask Discuss: what are possible outcomes of the findings from your study? Hint: this is the conclusion....