Create a High water level warning circuit with the reset button?
i have 24DC supply, Relay, Level Sensor (3 wires, 2 power input, one output), a Bulb and Normally Closed push button.
Bulb needs to stay on even when the level drops to normal and can only be reset by pressing push-button.
Create a High water level warning circuit with the reset button? i have 24DC supply, Relay,...
Could you please show me how I can drw those circuits.
please using (NI Multisim 14)
Optocoupler Objectives Use an ohmmeter to determine the condition of the optoisolator. Observe the operation of an optocoupler. Determine the maximum frequency response of the optocoupler. Required Materials (1) Dual DC power supply (1) Function generator (1) Oscilloscope (2) Multimeters (1) Optocoupler (ECG3040) (1) 3.9ΚΩ resistor (1) 220 resistor Introduction An optoisolator is a hybrid integrated circuit that contains an LED on one side...
Hi, I need some help with the a
Mealy and Moore Logisim circuit drawings for part of a project, the
details are below. Also here is an example of the mealy (I think)
circuit that should work if the gates are changed to two inputs. If
that is the case please confirme, then I really only need the
Moore...
The Clean Laundry Company (CLC) is interested in reducing the
risk of personal injury to their customers while operating their
washing...
I have this case study to solve. i want to ask which
type of case study in this like problem, evaluation or decision? if
its decision then what are the criterias and all?
Stardust Petroleum Sendirian Berhad: how to inculcate the pro-active safety culture? Farzana Quoquab, Nomahaza Mahadi, Taram Satiraksa Wan Abdullah and Jihad Mohammad Coming together is a beginning; keeping together is progress; working together is success. - Henry Ford The beginning Stardust was established in 2013 as a...
summatize the following info and break them into differeng key points. write them in yojr own words
apartus
6.1 Introduction—The design of a successful hot box appa- ratus is influenced by many factors. Before beginning the design of an apparatus meeting this standard, the designer shall review the discussion on the limitations and accuracy, Section 13, discussions of the energy flows in a hot box, Annex A2, the metering box wall loss flow, Annex A3, and flanking loss, Annex...