Question

The operations manager of a large production plant would like to estimate the mean amount of...

The operations manager of a large production plant would like to estimate the mean amount of time a worker takes to assemble a new electronic component. Assume that the standard deviation of this assembly time is 3.6 minutes. After observing 120 workers assembling similar devices, the manager noticed that their average time was 16.2 minutes. Construct a 95% confidence interval for the mean assembly time.

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
The operations manager of a large production plant would like to estimate the mean amount of...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The operation manager of a large production plant would like to estimate the mean amount of...

    The operation manager of a large production plant would like to estimate the mean amount of time a worker takes to assemble a new electronic component. Assume that the standard deviation of this assembly time is 3.6 minutes. b) How large should a sample be to estimate the population mean u with a = 0.05, so that the error not exceeds 0.5?

  • A chocolate factory is planning a new method to make its chocolate. the current method takes...

    A chocolate factory is planning a new method to make its chocolate. the current method takes 42.3 minutes on average to assemble a box of chocolate. The mean assembly time for a random sample of 24 boxes of chocolate using the new method was 40.6 minutes and the standard deviation for this sample is 2.7 minutes. Construct a 95% confidence interval for the mean time of assembly using the new method. Afterwards, determine if the new method is faster. Please...

  • Managers at an automobile manufacturing plant would like to estimate the mean completion time of an...

    Managers at an automobile manufacturing plant would like to estimate the mean completion time of an assembly line operation, The managers plan to choose a random sample of completion times and estimate via the sample. Assuming that the standard deviation of the population of completion times is 10.4 minutes, what is the minimum sample si d ed for the managers to be 95% confident that their estimate is within 1.7 minutes of Can your Wermediate computations to at least three...

  • Managers at an automobile manufacturing plant would like to estimate the mean completion time of an...

    Managers at an automobile manufacturing plant would like to estimate the mean completion time of an assembly line operation, . The managers plan to choose a random sample of completion times and estimate ji via the sample. Assuming that the standard deviation of the population of completion times is 10.3 minutes, what is the minimum sample size needed for the managers to be 95% confident that their estimate is within 2.2 minutes of u? Carry your intermediate computations to at...

  • [ 14 pts) A fast food company wants to estimate the mean amount of time that...

    [ 14 pts) A fast food company wants to estimate the mean amount of time that it takes for customers to receive their food at its take out window. A random sample of 35 customers has a sample mean of 178.7 seconds and a sample standard deviation of 14.8 seconds. a) (2 pts) Find a point estimate for the mean amount of time at a take out window b) (12 pts) Without using the T-interval feature on the calculator construct...

  • The owner of an oil change shop would like to know the mean time it takes...

    The owner of an oil change shop would like to know the mean time it takes to do an oil change at the shop. He takes a random sample of 16 cars that are serviced and finds a sample average of 20.5 minutes and a standard deviation of 7.4 minutes Construct a 90% confidence interval for the true mean time to do an oil change to a car. a) Lower Bound b) Upper Bound

  • An industrial designer wants to determine the average amount of time it takes an adult to...

    An industrial designer wants to determine the average amount of time it takes an adult to assemble an “easy to assemble” toy 10 points Save Answer QUESTION 4 An industrial designer wants to determine the average amount of time it takes an adult to assemble an "easy-to-assemble” toy. Use the following data (in minutes), a random sample, to construct a 95% confidence interval for the mean of the population sampled: 17 26 16 13 23 10 18 24 20 19...

  • An inexperienced on-line instructor would like to estimate the mean time that it takes her students...

    An inexperienced on-line instructor would like to estimate the mean time that it takes her students to complete one of her tests. She takes a random sample of 30 test times and finds that the mean in the sample is 36 minutes with a standard deviation in the sample of 3 minutes. Which of the following would be the appropriate calculation for constructing a 98% confidence interval to estimate the mean test time for all of her students? 2.34.726 <u...

  • An inexperienced on-line instructor would like to estimate the mean time that it takes her students...

    An inexperienced on-line instructor would like to estimate the mean time that it takes her students to complete one of her tests. She takes a random sample of 30 test times and finds that the mean in the sample is 36 minutes with a standard deviation in the sample of 3 minutes. Which of the following would be the appropriate calculation for constructing a 98% confidence interval to estimate the mean test time for all of her students? a. 34.726...

  • Managers at an automobile manufacturing plant would tke to estimate the mean completion time of an...

    Managers at an automobile manufacturing plant would tke to estimate the mean completion time of an assembly ine operation, The managers plan to choese a random sample of completion times and estimate via the sample. Assuming that the standard deviation of the population of completion times is 10.4 minutes, what the minimum sample size needed for the managers to be 95 % confdent that their estimate is within 1.7 minutes of p Cary your intermediate computations to at least three...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT