d) Assign tasks to work station using this rule: Assign the tasks according to greatest number of following tasks. In case of a tie, use the tie breaker of assigning the task with the longest processing time first.
|
Task |
Immediate predecessor |
Task time (minutes) |
|
a |
-- |
0.2 |
|
b |
a |
0.4 |
|
c |
b |
0.2 |
|
d |
-- |
0.4 |
|
e |
d |
1.2 |
|
f |
c |
1.2 |
|
g |
e, f |
1 |
Sol: This is a classic case of critical path question. Here the key to the solution is charting the process flow of the tasks.
Let's Chart it out:
The chain of tasks is as provided above. The process flow has been prepared keeping in mind that the preceding tasks has to be completed for the next task to be taken up. eg:task-b has to be preceded by task-a or in other words task-b can happen only once task-a is completed.
We can observe that the total time periods for the 2 different task chains are:
1. a- b- c- f- g takes total of 3 minutes(0.2+0.4+0.2+1.2+1 minutes) to complete
2. d- e- f takes a total of 2.6 minutes(0.4+1.2+1 minutes) to complete
Hence the chain of tasks with the greatest number of tasks is a- b-c-f-g
d) Assign tasks to work station using this rule: Assign the tasks according to greatest number...
3. A manager wants to assign tasks to workstations in order to achieve an hourly output rate of four units. The depart- working time of 56 minutes per hour. ment uses a Assign the tasks shown in the following precedence network (times are on the nodes and are in minutes) to workstations using the following heuristic rules: (i) Assign the task with the largest positional weight. (ii) Tiebreaker: "Assign the task with the longest time." If a tie still exists,...
As part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 240 units per eight-hour day. Task times and precedence relationships are as follows: Task Duration (minutes) Immediate Predecessor a 0.2 - b 0.4 a c 0.2 b d 0.4 - e 1.2 d f 1.2 c g 1.0 e, f d. Assign tasks to workstations on the basis of greatest number of following...
2. Show all the steps for the question to be worth any
marks.
The following table presentss the tasks, durations, and immediate predecessors necessary to produce a particular Rroduct The required daily output is 320 units, and the working day is 8.0 hours on an assembly line. Immediate Predecessor Duration (in minutes) Activity A 0.9 B 0.7 C 0.8 Г E 0.4 В, с А, D E 0.5 0.4 G E 0.6 Н F, G 0.5 T 1.1 a. Draw...
4. A large manufacturer of pencil sharpeners is planning to add a new sharpener, and you have been asked to bal- ance the assembly line, given the following task times and precedence relationships. Assume that cycle time is 1.3 minutes per unit. Task Duration (minutes) 0.2 Immediate Follower 0.4 0.3 1.3 oooo s T 0.1 0.8 0.3 1.2 a. Do each of the following: i. Draw the precedence network. ii. Assign the tasks to workstations using the heuristic rule "Assign...
Consider the following tasks, times, and predecessors for an assembly of set top cable converter boxes: TASK ELEMENT TIME (MINUTES) ELEMENT PREDECESSOR A 3 — B 3 A C 2 B D 2 B E 1 C, D F 1 A G 3 F H 3 G I 1 E, H Given a cycle time of six minutes, what is the efficiency of your layout? Use the longest task time as primary criterion with largest number of following tasks as...
Consider the following tasks, times, and predecessors for an assembly of set-top cable converter boxes ELEMENT TASK ELEMENT (MINUTES) PREDECESSOR TIME C, D E. H Given a cycle time of four minutes, develop an assembly line layout. Use the longest task time rule and the largest number of following tasks as a secondary criterion. What is the efficiency of your layout, assuming the 4-minute cycle time? (Round your answer to the nearest whole percent.) Efficiency
Consider the following tasks, times, and predecessors for an assembly of set top cable converter boxes: TASK ELEMENT TIME (MINUTES) ELEMENT PREDECESSOR A 2 — B 1 A C 5 B D 4 B E 3 C, D F 3 A G 2 F H 1 G I 4 E, H Given a cycle time of seven minutes, what is the efficiency of your layout? Use the longest task time as primary criterion with largest number of following tasks as...
Agent Smith, operations manager at the Matrix franchise, faces assembly line balancing problems. He has been told that the firm needs to assemble 1400 agents per day. There are 420 minutes of productive time in each working day. The assembly line activities are given below: Task Time (seconds) Predecessor A 13 - B 4 A C 10 B D 10 - E 6 D F 12 E G 5 E H 6 F, G I 7 H J 5 H...
A producer of inkjet printers is planning to add a new line of printers, and you have been asked to balance the process, given the following task times and precedence relationships. Assume that cycle time is to be the minimum possible. Task Length (minutes) Immediate Predecessor a 0.2 - b 0.4 a c 0.3 - d 1.3 b, c e 0.1 - f 0.8 e g 0.3 d, f h 1.2 g a. Do each of the following: (2) Assign...
QUESTION 37 A company is designing a product layout for a new product. It plans to use this production line eight hours a day in order to meet a schedule of 400 units per day. The tasks necessary to produce this product are detailed in the table below. Task Predecessor Time (seconds) 50 А B А 20 С А 26 D 40 B, C C E 30 a. Draw the network described in the table. b. What is the required...