Question

mmediato Predecessor Task Times (sec.) Task None 32 12 A. 23 B, C, D 15 None 20 F, G A. 64.9 B. 45.9 C. 55 D. 33.4 E. 51.4 8.
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Cycle time of the given system

Cycle time= Total time/desired output =60*60/51.4 =70

The minimum number of work station = Sum of task time/cycle time =232/70=3.31=4 stations

Answer:- 4 stations

Add a comment
Know the answer?
Add Answer to:
mmediato Predecessor Task Times (sec.) Task None 32 12 A. 23 B, C, D 15 None 20 F, G A. 64.9 B. 45.9 C. 55 D. 33.4...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Activity Predecessor Duration (weeks) a none 12 b none 5 c a, b 7 d c,...

    Activity Predecessor Duration (weeks) a none 12 b none 5 c a, b 7 d c, e 2 e b 8 f e 9 g d 5 h f,g 8 Your firm is implementing a balanced scorecard. As the project manager, you need to make sure the project is completed on time and on-budget. The table below lists the steps that need to be complete. The data analysis team members are going to be late delivering some key data points...

  • For the set of tasks given below, do the following: Task Task Time(seconds) Immediate Predecessor A...

    For the set of tasks given below, do the following: Task Task Time(seconds) Immediate Predecessor A 45 - B 11 A C 9 B D 50 - E 26 D F 11 E G 12 C H 10 C I 9 F, G, H J 10 I 193 b. Determine the minimum and maximum cycle times in seconds for a desired output of 500 units in a seven-hour day. (Round your answers to 1 decimal place.)    The minimum cycle...

  • Activity Activity Predecessor Time (days) A -- 4 B -- 12 C A, B 15 D...

    Activity Activity Predecessor Time (days) A -- 4 B -- 12 C A, B 15 D A, B 8 E A, B 6 F C, D, E 14 G C, D, E 3 H F, G 6 The expected completion time for the project above is? 27 days 68 days 47 days 30 days The critical path for the project is? B, C, F, H B, C, F, G, H A, C, F, G A, C, E, H How much...

  • D Question 19 1 pts In the figure above, A-32, B-26, C-22, D-9E-12 F-15, G-18, H-23....

    D Question 19 1 pts In the figure above, A-32, B-26, C-22, D-9E-12 F-15, G-18, H-23. If the government auctions off the quota licenses. What is the maximum amount of revenue it could raise? Question 18 1 pts DEF The figure above shows a market for cases of fertilizer where a tariff has been added to the world price. In the figure above, A=32, B-26, C-16, D-7.9.E=11.3, F-15.5, G-21.7. H=24.2. What is the quantity of a quota that is equivalent...

  • 1)For activity H – Attach the back, what is/are the predecessor(s)? Choose all that apply. C...

    1)For activity H – Attach the back, what is/are the predecessor(s)? Choose all that apply. C D I H G F E 2)Draw your project network diagram based on the information provided. Based on your network diagram, what is (are) the successor node(s) for activity E? Choose all that apply. I C F G H D 3)What are the critical activities (with zero slack time) for this project? Choose all that apply. Choose all that apply. G H B A...

  • Activity Predecessor Optimistic Most Likely Pessimistic A -- 12 16 25 B -- 7 14 22...

    Activity Predecessor Optimistic Most Likely Pessimistic A -- 12 16 25 B -- 7 14 22 C -- 5 10 14 D A 15 18 25 E C 8 12 18 F B 9 12 15 G F 18 22 29 H D,E,G 15 19 27 Using the table above, what is the probability that the project will be completed in 65 or fewer weeks? -greater than 20% but less than or equal to 24% -less than or equal to...

  • TASK SECONDS TASKS THAT MUST PRECEDE A 25 — B 15 A C 20 B D...

    TASK SECONDS TASKS THAT MUST PRECEDE A 25 — B 15 A C 20 B D 29 B E 16 C F 8 D G 35 E, F H 32 G The workday is 10.5 hours long. Demand for completed product is 900 per day. a. Find the cycle time required to meet the desired output rate. (Round your answer to 1 decimal place.) b. What is the theoretical number of workstations required to meet the desired output rate? (Round...

  • Question 1- Assembly Line Balancing A ball-bearing assembly firm wants to set up an assembly line...

    Question 1- Assembly Line Balancing A ball-bearing assembly firm wants to set up an assembly line that must have an output of 60 units per hour. The work elements, task times and their precedence relationships are shown in Table 1: Table 1 Work Element Time (sec.) Immediate Predecessor(s) A 40 NONE B 30 A C 50 A D 40 B E 6 B F 25 C G 15 C H 20 D, E I 18 F, G J 30 H,...

  • a. 4.0 km b. 3.40 km c. 250 km d. 0.25 km e. none 12. Convert...

    a. 4.0 km b. 3.40 km c. 250 km d. 0.25 km e. none 12. Convert 375 pounds to kilograms. a. 826 kg b. 14.0 kg c. 170 kg d. 82 kg e. none 13. Express 12 km/L in mi/gal a. 7.0 mi/gal b. 28 mi/gal c. 31 mi/gal d. 73 mi/gal f. 32 mi/gal 14. How many minutes will it take for a car that is travelling 8.0 x 10 mi/h to travel 200 km? a. 93 min b....

  • QUESTION 1 G E. H. C A Finish Start D. Complete the network activity diagram using the table below to answer questio...

    QUESTION 1 G E. H. C A Finish Start D. Complete the network activity diagram using the table below to answer questions 1-15. The expected activity completion times are provided in days. Each question is 1 point. Most Probable Activity Optimistic Pessimistic A 7 B 12 C 5 12 7 E 10 15 20 6 9 18 G 6 13 H 11 What is the early start (ES) time for activity F? 13 12 10 None of the above are...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT