The production facility run on one 7.5 hour shift. There is a 15 minute meeting planned at the beginning of the shift an...

The production facility run on one 7.5 hour shift. There is a 15 minute meeting planned at the beginning of the shift and 30 total minutes of setup time each day. 15 minutes of unscheduled equipment failure usually occurs. 380 good parts and 20 defective parts were produced with a standard cycle time of 60 parts per hour.
What is the Overall Equipment Effectiveness (OEE)? A) 93.51% B) 78.56% C) 85.17% D) 72.34%
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Date: uauh 310 340 405 100 31060 3 10 1105 58の Yos Sest ahsa CA

Add a comment
Know the answer?
Add Answer to:
The production facility run on one 7.5 hour shift. There is a 15 minute meeting planned at the beginning of the shift an...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • If a work cell had the following data, what is their OEE or overall equipment effectiveness?...

    If a work cell had the following data, what is their OEE or overall equipment effectiveness? 2 – 8 hour shifts 30 minute break per shift 2 hours planned downtime per shift 1 - 30 minute meeting per shift Cycle time = .025 hours/unit 350 units were produced 325 were good parts

  • To determine efficiency metrics, engineers collected data for a full shift of production run on machine A. During this...

    To determine efficiency metrics, engineers collected data for a full shift of production run on machine A. During this time: » Production was stopped for 20 minutes due to a machine failure, 10 minutes for a biın change, and 30 minutes for a quality concern requiring a tool repair . A total of 1200 parts were produced. Note that he ideal cycle time established by engineering or the equipment manufacturer is 4 parts /minute 6 parts were scrapped during the...

  • The plant works one eight hours shift each day. Each day there are two 15-minute breaks and a ove hrour meeting The p...

    The plant works one eight hours shift each day. Each day there are two 15-minute breaks and a ove hrour meeting The part has a cycle time of 26 minutes. The customer needs 30 parts per day parts are delivered in a box of 15 parts each. how many people are need for this cell ? 1 2 3 4

  • Part I A full shift of production was scheduled to run on machine X. Production was stopped for 2...

    just #3 Part I A full shift of production was scheduled to run on machine X. Production was stopped for 20 minutes due to a machine failure, 10 minutes for a bin change, 30 minutes for a quality concern requiring a tool repair. Assumptions: A) A day- 8 hours with 20 minutes break time B) A total of 1200 parts is processed per day and only 6 is rejected/scraped C)- The ideal cycle time established by engineering or the equipment...

  • A pipe bending machine used to produce ship system components was operated as follows: The period...

    A pipe bending machine used to produce ship system components was operated as follows: The period of operation was 25 days @ 10 hrs per day. It produced 800 total pipe details, of which 40 were rejected by quality inspectors. The total setup time for the machine during the 25 days was 22 hours. The machine had 3 unplanned breakdown events 1.5 hours for a power failure 0.5 hours for computer network failure 2.2 hours for lubricant pump failure The...

  • A pipe bending machine used to produce ship system components was operated as follows: The perio...

    A pipe bending machine used to produce ship system components was operated as follows: The period of operation was 25 days @ 10 hrs per day. It produced 800 total pipe details, of which 40 were rejected by quality inspectors. The total setup time for the machine during the 25 days was 22 hours. The machine had 3 unplanned breakdown events 1.5 hours for a power failure 0.5 hours for computer network failure 2.2 hours for lubricant pump failure The...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT