Answer a: Labor content = sum of task time =95+23+43+37+82 = 280 secs
Worker 1 is the bottleneck of the process, because worker 1 takes 95 secs to perform his tasks. Its process capacity is 60/95= 0.63 units per min or 37.89 units per hour
Direct labour cost per unit = total wages per hour/ units per hour
wages per hour= $ 24
Answer b: Direct labour cost per unit = $24*5/37.89 =$3.17 per toothbrush
Answer c: cycle time= 95 secs, idle time for worker A= 0 secs
labor utilization worker A= effective cycle time/cycle time of the system= 95/95= 1.0
Answer d: idle time= bottleneck time- process time
|
worker |
process time |
idle time= 95-process time |
|
1 |
95 |
0 |
|
2 |
23 |
72 |
|
3 |
43 |
52 |
|
4 |
37 |
58 |
|
5 |
82 |
13 |
|
Total |
280 |
195 |
Average labour utilization= 280/(280+195)= 0.59
The White Tooth Device Company is a manufacturer of high-end electric toothbrushes. For each toothbrush, there...
The White Tooth Device Company is a manufacturer of high-end electric toothbrushes. For each toothbrush, there are a sequence of assembly steps performed by five workers. Each worker does two tasks. Workers are paid $15 per hour. Worker Task Time (seconds) A T1 40 A T2 25 B T3 20 B T4 15 C T5 10 C T6 15 D T7 10 D T8 20 E T9 25 E T10 35 Instruction: Round "cost of direct labor" and "average labor...
Imagine US is a startup that offers high-definition 3-D prenatal ultrasounds for high-end customers. The service process includes five activities that are conducted in the sequence described below. (The time required for each activity is shown in parentheses):Activity 1: Welcome a patient and explain the procedure. (7 minutes)Activity 2: Prep the patient (e.g., show them to the room, apply ultrasound gel). (3 minutes)Activity 3: Take images. (14 minutes)Activity 4: Analyze images. (9 minutes)Activity 5: Discuss diagnostic with patient. (23 minutes)They...
PowerToys Inc. produces a small remote-controlled toy truck on a conveyor belt with nine stations. Each station has, under the current process layout, one worker assigned to it. Stations and processing times are summarized in the following table: Station Task Processing Times (seconds) 1 Mount battery units 70 2 Insert remote control receiver 80 3 Insert chip 90 4 Mount front axle 60 5 Mount back axle 65 6 Install electric motor 50 7 Connect motor to battery unit 75...
Mr. K’s is a very popular hair salon. It offers high-quality
hairstyling and physical relaxation services at a reasonable price,
so it always has unlimited demand. The service process includes
five activities that are conducted in the sequence described next
(the time required for each activity is shown in parentheses):
Activity 1: Welcome a guest and offer homemade herb tea (12
minutes).
Activity 2: Wash and condition hair (12 minutes).
Activity 3: Neck, shoulder, and back stress-release massage (12
minutes)....
Part 1.C&A Fast Food has four activities in serving a customer: greet customer, take order, process order, and deliver order. Each activity is staffed by one employee (for a total of four employees). The processing time for each activity is given as follows: ActivityProcessing time per customer Greet customer 2 seconds Take order 30 seconds Process order 60 seconds Deliver order 5 seconds. a. What is the average labor utilization? b.Assume demand is unlimited. If one additional employee is added...
Consider the following tasks that must be assigned to four workers on a conveyor--paced assembly line (i.e., a machine--‐paced line flow). Each worker must perform at least one task. Time to Complete Task (seconds): Task 1: 26 Task 2: 25 Task 3: 15 Task 4: 24 Task 5: 15 Task 6: 20 Task 7: 47 Task 8: 15 Task 9: 20 Task 10:25 Task 11: 15 Task 12: 20 The current conveyor--paced assembly-‐line configuration assigns the workers in the following...
PA 4-4 (Algo) Mr. K's is a very popular hair salon. It... Mr. K's is a very popular hair salon. It offers high-quality hairstyling and physical relaxation services at a reasonable price, so it always has unlimited demand. The service process includes five activities that are conducted in the sequence described next (the time required for each activity is shown in parentheses): Activity 1: Welcome a guest and offer homemade herb tea (9 minutes). Activity 2: Wash and condition hair...
Atlas Inc. is a toy bicycle manufacturing company producing a five inch small version of the bike that Lance Armstrong rode to win his first Tour de France. The assembly line at Atlas Inc. consists of seven work stations, each performing a single step. Stations and processing times are summarized here: Step 1 (50 sec.): The plastic tube for the frame is cut to size. Step 2 (40 sec.): The tube is put together. Step 3 (55 sec.): The frame...
In the molding shop, there are 11 machines capable of molding the one part done in-house, but historically one machine is always being maintained or repaired at any given time. Each machine requires a full-time operator who earns an hourly wage of $15, though only 50 minutes of a molding operator's typical hour is occupied with the tasks of loading, unloading, actively monitoring, and adjusting the machine. The machines can each produce 25 parts per hour. The workers will work...
Mr. K’s is a very popular hair salon. It offers high-quality hairstyling and physical relaxation services at a reasonable price, so it always has unlimited demand. The service process includes five activities that are conducted in the sequence described next (the time required for each activity is shown in parentheses): Activity 1: Welcome a guest and offer homemade herb tea (11 minutes). Activity 2: Wash and condition hair (11 minutes). Activity 3: Neck, shoulder, and back stress-release massage (11 minutes)....