The White Tooth Device Company is a manufacturer of high-end electric toothbrushes. For each toothbrush, there are a sequence of assembly steps performed by five workers. Each worker does two tasks. Workers are paid $15 per hour.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
labor content = sum of the time taken by all tasks = 215 sec
Hourly Output of different steps
worker A = 3600/ 65 =55.38
worker B = 3600 /35 =103
worker C =3600/ 25 =144
worker D = 3600 /30 =120
worker E =3600/60 =60
Process is constrained by the worker A which has the lowest output of 55.38 per hour
b. Direct labor cost = cost incurred / toothbrushes produced = 15x5 /55.38 = 1.354
c.Utilisation of person A = 1= 100%
d Utilisation of B = 55.38/103 =0.5376
Utilisation of C = 55.38/144 = 0.3845
Utilisation of D = 55.38 / 120 =0.4615
Utilisation of E = 55.38 /60 =0.923
average of these numbers ( A to E) = 0.6613
e.takt time = time available / units to be produced = 60/40 =1.5 min
f For takt time of 50, the hourly output should be 3600/50 =72
resources needed at different steps would be
T1+T2 =2
T3+T4 =1
T5+T6 =1
T7+T8 =1
T9+T10 =2
total = 7
g. Bottleneck A would be the right place for the new worker, which will double the capacity of this step. However, the new bottleneck will now be E which will have capacity of 60 per hr.
h. The step with 40 sec is the longest one. It can be combined with either step having time 25 sec ( as before) or 35 sec. The earlier arrangement is better. The capacity would remain the same.
i the highest time 40 needs to be combined with lowest number which is 10. It gives a task time of 50. It is not possible to find a highest combination which is less than 50. Hence the capacity
= 3600/50 = 72 per hour
The White Tooth Device Company is a manufacturer of high-end electric toothbrushes. For each toothbrush, there...
The White Tooth Device Company is a manufacturer of high-end electric toothbrushes. For each toothbrush, there are a sequence of assembly steps performed by five workers. Each worker does two tasks. Workers are paid $24 per hour. Time (seconds) Task Worker T1 A 51 A T2 44 В тЗ 10 В T4 13 C Т5 29 C T6 14 T7 20 D T8 17 Е T9 44 Е T10 38 Instruction: Round "cost of direct labor" and "average labor utilization"...
Part 1.C&A Fast Food has four activities in serving a customer: greet customer, take order, process order, and deliver order. Each activity is staffed by one employee (for a total of four employees). The processing time for each activity is given as follows: ActivityProcessing time per customer Greet customer 2 seconds Take order 30 seconds Process order 60 seconds Deliver order 5 seconds. a. What is the average labor utilization? b.Assume demand is unlimited. If one additional employee is added...
Imagine US is a startup that offers high-definition 3-D prenatal ultrasounds for high-end customers. The service process includes five activities that are conducted in the sequence described below. (The time required for each activity is shown in parentheses):Activity 1: Welcome a patient and explain the procedure. (7 minutes)Activity 2: Prep the patient (e.g., show them to the room, apply ultrasound gel). (3 minutes)Activity 3: Take images. (14 minutes)Activity 4: Analyze images. (9 minutes)Activity 5: Discuss diagnostic with patient. (23 minutes)They...
Mr. K’s is a very popular hair salon. It offers high-quality
hairstyling and physical relaxation services at a reasonable price,
so it always has unlimited demand. The service process includes
five activities that are conducted in the sequence described next
(the time required for each activity is shown in parentheses):
Activity 1: Welcome a guest and offer homemade herb tea (12
minutes).
Activity 2: Wash and condition hair (12 minutes).
Activity 3: Neck, shoulder, and back stress-release massage (12
minutes)....
PowerToys Inc. produces a small remote-controlled toy truck on a conveyor belt with nine stations. Each station has, under the current process layout, one worker assigned to it. Stations and processing times are summarized in the following table: Station Task Processing Times (seconds) 1 Mount battery units 70 2 Insert remote control receiver 80 3 Insert chip 90 4 Mount front axle 60 5 Mount back axle 65 6 Install electric motor 50 7 Connect motor to battery unit 75...
Consider the following tasks that must be assigned to four workers on a conveyor--paced assembly line (i.e., a machine--‐paced line flow). Each worker must perform at least one task. Time to Complete Task (seconds): Task 1: 26 Task 2: 25 Task 3: 15 Task 4: 24 Task 5: 15 Task 6: 20 Task 7: 47 Task 8: 15 Task 9: 20 Task 10:25 Task 11: 15 Task 12: 20 The current conveyor--paced assembly-‐line configuration assigns the workers in the following...
PA 4-4 (Algo) Mr. K's is a very popular hair salon. It... Mr. K's is a very popular hair salon. It offers high-quality hairstyling and physical relaxation services at a reasonable price, so it always has unlimited demand. The service process includes five activities that are conducted in the sequence described next (the time required for each activity is shown in parentheses): Activity 1: Welcome a guest and offer homemade herb tea (9 minutes). Activity 2: Wash and condition hair...
Mr. K’s is a very popular hair salon. It offers high-quality hairstyling and physical relaxation services at a reasonable price, so it always has unlimited demand. The service process includes five activities that are conducted in the sequence described next (the time required for each activity is shown in parentheses): Activity 1: Welcome a guest and offer homemade herb tea (11 minutes). Activity 2: Wash and condition hair (11 minutes). Activity 3: Neck, shoulder, and back stress-release massage (11 minutes)....
Atlas Inc. is a toy bicycle manufacturing company producing a five inch small version of the bike that Lance Armstrong rode to win his first Tour de France. The assembly line at Atlas Inc. consists of seven work stations, each performing a single step. Stations and processing times are summarized here: Step 1 (50 sec.): The plastic tube for the frame is cut to size. Step 2 (40 sec.): The tube is put together. Step 3 (55 sec.): The frame...
Charles Lackey operates a bakery in Idaho Falls, Idaho. Because of its excellent product and excellent location, demand has increased by 25% in the last year. On fartoo many occasions, customers have not been able to purchase the bread of their choice. Because of the size of the store, no new ovens can be added. As a staffmeeting, one employee suggested ways to load the ovens differently so that more loaves of bread can be baked at one time. This...